GovChime
Notice ID: fee8debac470c529e044a1cdc82f7fd1Award NoticeAwarded

Self-Help Tarps

Awarded on October 15, 2018. Full description on SAM.gov.

Awarded tounder 70FB8019P00000001 (source: SAM.gov award notice)• $4.5M

Overview

Posted
October 23, 2018
Notice type
Award Notice
NAICS
314910: Textile Bag and Canvas Mills
Agency
Department of Homeland SecurityFEDERAL EMERGENCY MANAGEMENT AGENCY

Notice details

Office
FEMA
Place of performance
FEMA 500 C Street S.W., WASHINGTON, 20472
PSC
56: CONSTRUCTION AND BUILDING MATERIAL
Last updated
Oct 11, 2026
Award date
Oct 15, 2018
Award amount (SAM.gov award notice)
$4.5M

Identifiers

Solicitation number
70FB8018Q00000008
Notice ID
fee8debac470c529e044a1cdc82f7fd1
Award number (PIID)
70FB8019P00000001

Description

The Contractor shall provide 150,000 self-help tarps to FEMA in accordance to the specifications and delivery requirements outlined below. • Self-Help Tarp to be used for small areas of roof damage • Size - 20'x 25' • Woven polyethylene 8 x 8 (10 x 10 or 14 x14 acceptable), 800 Denier • Thickness: Preferred thickness is 5-6 mil. However, various thicknesses from 5-10 mil are still acceptable. • UV Resistance - 80% after 200 hr. per ASTM D7238-06 • FR Tested - IAW Class A ASTM E84-11 Standard • Non-corrosive grommets at corners and minimum of 3' on center on edges or an alternative to grommets to secure the tarp in place. • Hems folded over • Corners reinforced • Color - Medium blue preferred. Clear is acceptable • Each Tarp must be packaged in a cardboard box with two (2) 100' lengths of 550-pound test parachute cord. • Each package shall be clearly marked with a label indicating the size and number of tarps • Boxes to be palletized in the contractor's standard commercial casing which shall be shipped on industry standard size pallets (48 inches by 40 inches). Shrink wrap shall be fully over all sides (excluding the top and bottom) with a minimum of (10) layer of shrink-wrap to ensure the capability to double stack pallets without comprising the sturdiness of load. The finished product will be placed onto a 48 inch by 40inch 4 ay wooden pallet. The over-all height of the pallet will not exceed 55 inches.

Full description on SAM.gov

Award Overview

Award Number

70FB8019P00000001

Award Amount (SAM.gov award notice)

$4.5M

Award Date

Oct 15, 2018

Awardee

Awardee UEI

GEHAM7EBKDX5

Original Solicitation

Notice ID: fee8debac470c529e044a1cdc82f7fd1

Posted Date: Oct 23, 2018

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

4
  • 70FA3125F00000018
    DPALEX, INC.
    Department of Homeland SecurityNAICS 423330
    $7.9MSigned Jun 17, 2025
  • 70FA3125F00000018
    DPALEX, INC.
    Department of Homeland SecurityNAICS 423330
    $7.9MSigned Apr 18, 2025
  • 70FB7020D00000002
    DPALEX, INC.
    Department of Homeland SecurityNAICS 423330
    —Signed Jan 24, 2025
  • 70FA3125F00000018
    DPALEX, INC.
    Department of Homeland SecurityNAICS 423330
    $7.9MSigned Jan 16, 2025

Contacts

Contracting Officer

Primary Contact

Erik Young
Contract Specialist

Secondary Contact

Rahsaan Edwards
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:70FB8018Q00000008
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 3×
    Combined SynopsisSep 26, 2018

    Self-Help Tarps

    Notice fa787de36af97c82198c56333a71030d on SAM.gov

  2. 2×
    AwardedCurrentOct 23, 2018

    Self-Help Tarps

    Notice fee8debac470c529e044a1cdc82f7fd1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Fire retardant tarps Reason for amendment is to change the description in item 001 from must be fire retardant minimum 8x20; 18 oz to must be fire retardant NFPA-701 standard minimum 8ft x 20ft; 18 oz vinyl grommets 24 inches on all 4 sides apart light tan color. Reason for amendment is to change the description in item 002 from must be fire retardant minimum 10x25; 18 oz to must be fire retardant NFPA-701 standard minimum 10ft x 25ft; 18 oz vinyl grommets 24 inches on all 4 sides apart light tan color. Reason for amendment is to change the description in item 003 from must be fire retardant minimum 10x10; 18 oz to must be fire retardant NFPA-701 standard minimum 10ft x 10ft; 18 oz vinyl grommets 24 inches apart on all 4 sides light tan color.
59%
Combined Synopsis04/06/2026
The Naval Surface Warfare Center Philadelphia intends to procure Shipping Tarps. See attached RFQ N6449827Q0009. This is a total small business set-aside. This procurement contains drawings that are required to bid. Offerors must provide a valid JCP to receive the drawings. Please send your JCP to stephanie.l.plitt.civ@us.navy.mil - Any questions regarding this notice shall be emailed to stephanie.l.plitt.civ@us.navy.mil - Phone calls will not be accepted.
48%
Combined Synopsis11/27/2026
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 5.101(d). This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 12-1NFE-27-B-0003 (2000011641) is issued as an invitation for bid (IFB)] for woven polypropylene bags. This acquisition is not set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Ombudsman Program The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner. The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman. Informal Forum with the Ombudsman 1.Initial Point of Contact: Interested parties who believe a specific USDA procurement isunfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. 2.Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums. 3.Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable). Formal Agency Protest with the Ombudsman 1.Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. 2.Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government. 3.Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing. 4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3). Failure to submit the required information may result in a delay or dismissal of the protest. 5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104. 6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer. Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.
43%
Combined Synopsis11/02/2026
40%
AwardedOpen
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 5.101(d). This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number [insert solicitation number] is issued as a [insert request for quotation (RFQ), request for proposal (RFP), or invitation for bid (IFB)] for [provide a brief description of the requirement]. This acquisition [is/is not] set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. NOTICE FOR FILING AGENCY PROTESTS United States Department of Agriculture (USDA) Ombudsman Program The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions. Interested parties with concerns about this solicitation are encouraged to seek resolution through the following USDA procedures. Tier 1: Contracting Officer Concern Resolution Submission: Interested parties with concerns about either the solicitation or subsequent award should first submit their concern directly to the Contracting Officer, providing sufficient detail to allow the Contracting Officer to understand and assess the issue. Process: The Contracting Officer will review the concern, seek clarification as needed, and engage with the interested party to attempt prompt resolution. Review Timeline: The Contracting Officer will make every effort to provide a response or resolution within 10 business days of receiving the concern. Effect on Award or Performance: Tier 1 engagement is not considered an official notification of filing an agency protest and does not pause solicitation deadlines, delay award decisions, or suspend contract performance. Next Steps: If the matter cannot be resolved at Tier 1, the interested party may file a written agency protest under Tier 2. USDA encourages all parties to seek resolution with the Contracting Officer before filing an agency protest. Tier 2: Agency Protest If concerns cannot be resolved at Tier 1, an interested party may file a written agency protest with either the Contracting Officer or the USDA Independent Review Authority. The decision by the USDA Independent Review Authority is an alternative to a decision by the Contracting Officer. The USDA Independent Review Authority will not consider an appeal of the Contracting Officer’s decision on an agency protest. The protest must state whether the protester elects review by the Contracting Officer, by the UDSA Independent Review Authority. If no election is stated, the Contracting Officer will decide the protest. Required Information: Protests shall include the information set forth in FAR 33.104-4 (a)(3). Failure to submit the required information may result in a delay or dismissal of the protest. Submission: Agency protests should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104. Effect on Award or Performance: Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined to be in the best interest of the Government. Review Timeline: USDA strives to resolve agency-level protests within 35 business days of receipt. Election of Forum: By filing a protest with USDA, the protesters agree not to file a protest on the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If such a protest is filed externally, the USDA agency protest will be dismissed. Questions: Questions regarding this notice or protest procedures should be directed to the Contracting Officer identified in this solicitation.
40%
Combined Synopsis11/09/2026

Additional Details

Solicitation Number

70FB8018Q00000008

Archive Date

Oct 30, 2018

Office Address

WASHINGTON, DC, 20472