GovChime
Archived

Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

Overview

Response deadline
2:00 PM EDT
Posted
April 7, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)

Notice details

Office
HQ CONTRACT OPERATIONS (CG-912)(000
Last updated
Nov 16, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z02325R93250001
Notice ID
f53f5fb5ac3b4a77ba8c283c26e2954a

Description

A00005- This amendment addresses questions that we have received to date. You can find the Government Responses on Attachment 8 - SPC-HWX II - Government Responses - A00005. Attachments: SF30 - SPC-HWX II - A00005 - 4-8-2025 Attachment 8 - SPC-HWX II - Government Responses - A00005 --------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A00004- The US Coast Guard has received communication from multiple sources regarding the SPC-HWX II engine requirements. Indications are meeting all the requirements may not be possible in the current market. Areas that have been commented on: Spec 233-2's CFR Part 40.1042 / EPA marine commercial certification, Spec 200-4.1 s rollover/inversion capability, and operation at high angles of heel (i.e., 110 degrees). The US Coast Guard is adjusting the requirements to improve the likelihood of receiving proposals that meet the minimum requirements. Engine Emissions Requirements: At proposal submission, all engines (propulsion and generators) must have a two-year / 500-hour proven track record in the marine service in accordance with Spec 200-2.3. This serves as an indicator of reliability and maturity of the engines. Specification section 233-2 has been revised to provide allowance for impacts to EPA certificates necessitated by modification to meet the unique SPC-HWX II requirements. If modifications to the proposed engine are necessary to meet the inversion or high heel angle operational requirements, describe the modification effects on EPA certificate(s) and provide a plan to ultimately recertify the engines if necessary. Design reviews will be used to refine this plan and establish the final configuration and certification status of the engines. High Heel Angle operation (65-110 degrees): The intent is to ensure crews have sufficient power to safely maneuver in high heel-angle situations. Power must be available up to 110 degrees at which point the engine should drop to idle after 2.0 seconds in accordance with Spec 200-4.1. The specification has been updated to allow limiting engine output in high heel angle operations (i.e. 65 to 110 degrees) provided sufficient power remains available to operate the boat up to the 110-degree idle cutoff. The propulsion system may be restricted in performance while at these high heel angles without limiting the crews ability to manipulate the throttle controls. Design reviews will be used to discuss and refine high heel angle performance. Proposal Due Date: Due date has been updated to 23 APR 2025. Attachments: SF30 - SPC-HWX II - A00004 Attachment 1 - SPC-HWX II - SPEC - A00004 Attachment 8 - SPC-HWX II - Government Responses - A00004 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ A00003- This amendment addresses questions that we have received to date. Attachment 8 SPC-HWX II Questions and Clarifications Form - Government Responses - A00003, Attachment 1 - SPEC - A00003, Attachment 2 - SOW - A00003, Attachment 3 - Price Schedule - A00003 and an updated RFP 70Z02325R93250001 - A00003 have been published. Attachments: RFP 70Z02325R93250001 - A00003 SF30 - SPC-HWX II - A00003 Attachment 1 - SPC-HWX II - SPEC - A00003 Attachment 2 - SPC-HWX II - SOW - A00003 Attachment 3 - SPC-HWX II - Price Schedule - A00003 Attachment 8 - SPC-HWX II - Government Responses - A00003 --------------------------------------------------------------------------------------------------------------------------------------------------------------------- A00002- This amendment addresses questions that we have received to date. You can find the Government Responses on Attachment 8 - SPC-HWX II - Government Responses - A00002. Attachments: SF30 - SPC-HWX II - A00002 - 1-27-2025 Attachment 8 - SPC-HWX II - Government Responses - A00002 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A00001- The following changes have been updated to the RFP: 1. Attachment 3 - Price Schedule - A00001 has been updated; and 2. SF1449, Part III Addendum 52.212-4, Section 9 Contract Financing has been updated. From the following changes, the following attachments have been uploaded and changed. Attachments: SF1449 - 70Z02325R93250001 - A00001 - 1-13-2025 SF30 - SPC-HWX II - A00001 - 1-13-2025 Attachment 3 - SPC-HWX II Price Schedule - A00001 Attachment 8 - SPC-HWX II - Government Responses - A00001 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The U.S. Coast Guard (USCG) has a requirement to provide the next generation of the Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II).

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (26)

  • SF30_SPC-HWX II_A00005_4-8-2025.pdf

    139 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • Attachment-8_SPC-HWX_II_QuestionsandClarificationsForm_CombinedGovtResponses_A00005.xlsx

    19 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • SF30_SPC-HWX II_A00004_3-25-2025.pdf

    134 KBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • Attachment-1_SPC-HWX-II_SPEC_A00004_03-24-2025.pdf

    3.5 MBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • Attachment-8_SPC-HWX-II_QuestionsandClarificationsForm_CombinedGovtResponses_A00004.xlsx

    113 KBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • RFP_70Z02325R93250001_A00003.pdf

    459 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • SF30_SPC-HWX II_A00003.pdf

    134 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Attachment-8_SPC-HWX II_QuestionsandClarificationsForm_CombinedGovtResponses_A00003.xlsx

    113 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Attachment-1_SPC-HWX-II_SPEC_02-21-2025_A00003.pdf

    3.5 MBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Attachment-2_SPC-HWX-II_SOW_02-21-2025_A00003.pdf

    2.2 MBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Attachment-3_SPC-HWX-II_PriceSchedule_A00003.xlsx

    39 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • SF30_SPC-HWX II_A00002_1-27-2025.pdf

    633 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Attachment-8_SPC-HWX II_QuestionsandClarificationsForm_GovernmentResponses_A00002.xlsx

    25 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • SF1449_70Z02325R93250001_A00001_1-13-2025.pdf

    399 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • SF30_SPC-HWX II_A00001_1-13-2025.pdf

    633 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-3_SPC-HWX-II_PriceSchedule_A00001.xlsx

    39 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-8_SPC-HWX-II_QuestionsandClarificationsForm_GovernmentResponses_A00001.xlsx

    19 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • SF1449_70Z02325R93250001_12-10-2024.pdf

    738 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-1_SPC-HWX-II_SPEC_RFP.pdf

    1.9 MBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-2_SPC-HWX-II_SOW_RFP.pdf

    1.1 MBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-3_SPC-HWX-II_PriceSchedule_RFP.xlsx

    39 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-4_SPC-HWX-II_CDRLs_RFP.pdf

    518 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-5_SPC-HWX-II_Past Performance Questionnaire_RFP.pdf

    1.6 MBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-6_SPC-HWX-II_GFI_12-05-2024.zip

    99 MBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-7_SPC-HWX-II_FAQ_RFP.pdf

    83 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment-8_SPC-HWX II_QuestionsandClarificationsForm_RFP.xlsx

    21 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download

Lifecycle

  1. 2
    Version 2Special NoticeArchived

    Synopses - Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice 0827b93b282d4c5a9f1e79feb4200e4b on SAM.gov

  2. 4
    Version 4Combined Synopsis/SolicitationArchived

    Type changed from Special Notice to Combined Synopsis/Solicitation

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice 20b9db431d4148a4b7d012732c8bf972 on SAM.gov

  3. 5
    Version 5Combined Synopsis/SolicitationArchived

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice 827e24931881460ba2650022d99364c1 on SAM.gov

  4. 6
    Version 6Combined Synopsis/SolicitationArchived

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice 567c644d44884366ba38ac95790bfd4e on SAM.gov

  5. 7
    Version 7Combined Synopsis/SolicitationArchived

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice 982118e247d244559419c1aab5c9e47c on SAM.gov

  6. 8
    Version 8Combined Synopsis/SolicitationArchived

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice f2f8ee89e75c47f1895738cd2e4cc04a on SAM.gov

  7. 10
    Version 10Combined Synopsis/SolicitationArchivedCurrent

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice f53f5fb5ac3b4a77ba8c283c26e2954a on SAM.gov

  8. 13
    Version 13Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Special Purpose Craft - Heavy Weather 2nd Generation (SPC-HWX II)

    Notice c77b6a144f224c60b0e1e8d6f9038511 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

70Z02325R93250001

Archive Date

May 8, 2025