Archived
Sewage Line Breaks- Paris Landing
Overview
- Response deadline
- 3:00 PM CDT
- Posted
- June 12, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- BASE NEW ORLEANS(00029)
- Place of performance
- Buchanan, 38222
- Last updated
- Nov 12, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 70Z02925QNEWO0029
- Notice ID
- 12a6e7d0ffcc4c1b81617529bd4ab081
Description
The United States Coast Guard is accepting quotes for qualified individuals or firms to provide all labor, materials, and equipment necessary to Repair line breaks and clear root obstructions across segments of 350 feet of 4- and 6-inch underground pipe/PVC. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held before starting the work at Paris Landing in Buchanan TN. All work is to be completed in accordance with the SOW. This will be a firm-fixed priced purchase order awarded to the lowest reasonable price technically acceptable bidder. This is a set aside 100% for small business. All contractors must be actively registered in SAM.gov and must provide representations prescribed in clause 52.236-1 in Section III of the attached contract format document to be considered. Far clause 52.236-1 Performance of Work by the Contractor applies to the solicitation and award. The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Construction Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor's own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article. See Attachment B for more detail. In establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included. The work by the Contractor's executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause. Site Visit POC: MKC South Knight (706) 410-5764 southworth.m.knight@uscg.mil DC2 Evan Lipscomb (804) 615-2216 evan.s.lipscomb@uscg.mil Submit quotes to: Kala.m.lowe@uscg.mil NAICS: 237110 PSC: Y1NE 36.204 Disclosure of the magnitude of construction projects. Under $35,000
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
70Z02925QNEWO0029_0_US.pdf
240 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
SOW Paris Landing Sewage Line Repair.docx
26 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Enclosure 1 Sewer Connection.pdf
237 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment A_Chippewa.docx
40 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment B.pdf
61 KBAdded in Combined Synopsis/Solicitation version 3Posted
Links (1)
- WAGE DETERMINATION BACHANAN, TNsam.govPosted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
Sewage Line Breaks- Paris Landing
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
70Z02925QNEWO0029
Archive Date
Jul 22, 2025