GovChime
Notice ID: 504ce845dc01450ca916e526fbafaaeeCombined Synopsis/SolicitationArchived

STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM - Amendment 02

Archived on September 26, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM PDT
Posted
September 3, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
BASE SEATTLE(00033)
Place of performance
Neah Bay, Washington, 98357
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z03326Q2019000010
Notice ID
504ce845dc01450ca916e526fbafaaee

Description

AMENDMENT 02 - ISSUED 03 September 2026

The purpose of this amendment is to:

Update the Date Offers Due to September, 11th 2026 at 3:00 PM PDT.

All other terms and conditions remain unchanged.

AMENDMENT 01 – ISSUED 27 August 2026

The purpose of this amendment is to:

Revise the requirements document from a Statement of Work (SOW) to a Performance Work Statement (PWS) to reflect updated requirements identified during the site visit. The revised PWS supersedes and replaces the prior SOW in its entirety. In addition, the contract opportunity is extended, and offers are now due no later than September 4, 2026, at 1500 PDT. 

Notes to Offerors: Offerors must acknowledge receipt of this amendment by signing and returning the SF-30 with their proposal.

All other terms and conditions remain unchanged.

DESCRIPTION OF REQUIREMENT: 

The U.S. Coast Guard requires services for the contractor to provide all labor, equipment, material, transportation, supervision, services and items necessary to install one (1) heat pump and four (4) associated indoor mini-split units to provide independent and adequate temperature control for the gym at USCG Station Neah Bay, WA. The approxomate dimesnions and volumes of the spaces are as follows:

Main gym 47’x61’30’ = 86,010 cu ft

Large weight room, 40’x19’x30’= 22,800 cu ft

Hallway,   30’x4’x8’ = 960 cu ft

Small weight room, 24’x16’8’ = 3,072 cu ft

The Government intends to issue a firm-fixed-price purchase order for this project. The full scope of work and specifications are included in the solicitation documents.

PROJECT ADDRESS:

U.S. Coast Guard

Station Neah Bay

31 Coast Guard Dr.

Neah Bay, WA 98357

United States

CLASSIFICATION:

This acquisition is set-aside 100% for SMALL BUSINESS.

The associated NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors.

Where Federal Acquisition Regulation clause language is inconsistent with FAR 13.004, Legal Effect of Quotations, that language is hereby tailored in accordance with FAR 12.302 to be consistent with a request for quotations. This tailoring includes but is not limited to the following: In accordance with FAR 13.004, a quotation is not an offer, and any clause provision to the contrary is hereby modified to be consistent with FAR 13.004. Where the word "offer/offeror" or a derivative of that word appears, it is changed to "quote/quoter" or a derivative of that word.

SITE VISIT:

Each offeror is highly encouraged to visit the site to provide the government with an accurate and competitive offer but is not required to submit a quote.

A site visit will be arranged for interested offerors and RSVPs are required. All interested offerors must arrive no later than five minutes prior to their RSVP'd start time. 

Site Visit Date: August 19th, 2026.

Site Visit Time: 10:00 AM PDT.

Location:

U.S. Coast Guard

Station Neah Bay

31 Coast Guard Dr.

Neah Bay, WA 98357

United States

Please E-mail Mr. Christopher Goolsby at Christopher.J.Goolsby@uscg.mil to RSVP for the site visit no later than 1300 on August 17th, 2026.

QUESTIONS:

Any and all questions regarding this solicitation shall be submitted in writing to the Contracting Officer at Patrick.R.Gittings@uscg.mil with solicitation RFQ number 70Z03326Q2019000010 in subject line.  Questions regarding the statement of work (SOW) will be forwarded to the technical expert for an accurate response.  All responses will be uploaded for an equal and fair solicitation to all interested vendors solely on SAM.gov.  No more questions will be answered after 3:00 PM PDT on August 24th, 2026.

SUBMISSION OF QUOTES:

Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.

Quotes must be submitted electronically to Patrick.R.Gittings@uscg.mil by the date and time specified in this solicitation. Incomplete submissions may be considered unresponsive and ineligible for award.

A complete submission shall consist of the following three parts:

Part 1: SF 1449

1.  Complete and sign the provided Standard Form (SF) 1449 to include the quoted price.

2.  Insert the total firm-fixed-price bid in the appropriate blocks on the SF 1449.

Part 2: Price Quotation

1.  A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:

  • Materials and Equipment
  • Final Performance Verification of all new and repaired or replaced components.
  • Site Cleanup and Disposal of Wastes
  • Labor Hours & Wages

Part 3: Technical Proposal

The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:

1.  Technical Approach: A step-by-step description of how the quoter will perform the work, including mobilization, inspection, and installation of the required components.

2.  List of Major Materials and Equipment: A list of the key materials and equipment proposed for the project. This list is for technical evaluation purposes to ensure compliance with the SOW and must include, at a minimum:

  • Technician and Firm Certification
  • Test Instruments List and Calibration Certificates

3.  Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including performance verification and report submission, will be completed within the required Period of Performance, with a completion date of October 31th, 2026. Milestones should be shown in terms of days from the NTA (e.g., "Inspection of System(s) Complete: Day 3," "System(s) Repaired: Day 6," "Final Acceptance Testing: Day 9").

Submit quotes to the following e-mail address by the offer due date and time zone:

Attn: Patrick R. Gittings, E-Mail Address: Patrick.R.Gittings@uscg.mil with solicitation RFQ number 70Z03326Q2019000010 in subject line.

It is the government’s intent to award to the offeror who proposes a price that is fair and reasonable and provides the lowest priced, technically acceptable (LPTA) quote meeting the specifications of the requirement.  If the lowest priced quote is not found to be technically acceptable, the contracting officer will evaluate the next lowest priced quote, and so on.  Quotes determined to be incomplete, unreasonable, or unrealistic will not be considered for award.  Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award.  Failure for contractor to be registered in SAM shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (9)

  • 70Z03326Q2019000010_SF30(2).pdf

    614 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Neah Bay Gym HVAC PWS (FY26 RIPIT).pdf

    76 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • 70Z03326Q2019000010_SF30(1).pdf

    616 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • 70Z03326Q2019000010_SF 1449.pdf

    489 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 70Z03326Q2019000010 Questions and Answers 18AUG26.pdf

    69 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Neah Bay Gym Floor Plan.pdf

    92 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • GYM drill plan 2.0.pdf

    622 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Wage Determination No. 2015-5545.pdf

    4.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 70Z03326Q2019000010_Provisions_Clauses.pdf

    365 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM

    Notice 7297117e2b4340c8981376bc5fe086e8 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM

    Notice 796a8eadb355441f8b08f98b17f4df92 on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM

    Notice b529e70811bf416f9b990c938225632d on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM - Amendment 01

    Notice 8b9dd0a27d3042768ecf4a2252594696 on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM - Amendment 01

    Notice 3025b85d93654be49da0e0b895e47dfd on SAM.gov

  6. 6
    Version 6Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM - Amendment 01

    Notice 3760a2917ebb40cb981f500ef91221d5 on SAM.gov

  7. 7
    Version 7Combined Synopsis/SolicitationArchived

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM - Amendment 01

    Notice f782ed9ac4df4ebd89d22f05884d92f4 on SAM.gov

  8. 9
    Version 9Combined Synopsis/SolicitationArchivedCurrent

    STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYM - Amendment 02

    Notice 504ce845dc01450ca916e526fbafaaee on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ27Q0006 is issued as a Request for Quotation (RFQ) for the replacement of the HVAC system at the Tonasket Ranger Station. This will not be an HVAC replacement in-kind for the existing system. The replacement HVAC system shall be designed and installed based upon consideration of current energy standards. Work includes removal of existing HVAC equipment, delegated design, and installation of new HVAC equipment. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220 Plumbing, Heating, and Air-Conditioning Contractors The small business size standard is $19,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Location: The Tonasket Ranger Station Office Building 2007 is located at street address: 1 W Winesap St, Tonasket, Washington 98855.
-Combined Synopsis12/03/2026
HVAC Unit Replacement
-Combined Synopsis11/20/2026
ADDING POST BID OPENING ABSTRACT. SEE ATTACHMENT This amendment 05 is to: Providing answer to last RFI. See attached. See RFI 06, Question 1, regarding EMT conduit. Bid opening date is NOT extended. This amendment 04 is to: Post an updated RFI Response to RFI 04, questions 23 and 24, pertaining to Monaco panelsThis amendment 03 is to:1) Extend the bid due/opening date to 10 SEPT 2026, 1:00 PM Pacific Time. Deadline for new RFIs is 5 SEPT 2026, COB. 2) Upload Bill of Lading, Haz Waste Manifests for AFFF Removal Project, and Sundown Policy for Foam Fire Suppression Systems (Change 2) (see new attachments in PIEE Solicitation Module), to assist addressing RFI questions.3) Provide Answers to all of the the RFIs submitted. See new attachment in PIEE Solicitation module.4) Period of Performance has been changed to 600 days.1) Extend the bid due/opening date to 2 SEPT 2026, 1:00 PM Pacific Time.2) Upload As-Built drawings. ** email 141MSG.MSC@us.af.mil to request for access and download through DODSAFE. 3) Add Clause, FAR 52.228-1 BID GUARANTEE. This was erroneously omitted from the original solicitation.4) Provide Answers to some of the RFIs submitted. See attachment. * answers highlighted yellow. Unanswered are provided to mitigate duplicate questions. (31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
-Solicitation09/10/2026
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.
-Combined Synopsis11/13/2026
The United States Coast Guard Deputy Commandant for Systems (DCS) is issuing this combined synopsis/solicitation on behalf of the Surface Forces Logistics Center (SFLC) to award a firm-fixed-price service contract, as detailed in the attached Statement of Work. This requirement consists of performing all on-site labor and services to remove the existing fire suppression system and install a new water mist system and fire alarm control panel in support of the USCGC SCIOTO. All work must be performed on-site at 221 Mississippi Drive, Keokuk, IA 52632. The planned Period of Performance (PoP) is from 15Nov26 through 23Nov26. This acquisition is a 100% total small business set-aside under NAICS code 238220, with a corresponding small business size standard of $19.0 million. The applicable Product Service Code is N042. The Government will award a contract resulting from this solicitation to the responsible offeror whose quote conforming to the solicitation is most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers: 1. Technical Capability (Pass/Fail) 2. Past Performance (Pass/Fail) 3. Total Price A quotation must receive an Acceptable rating for all non-price factors to be eligible for award. Among all acceptable quotations, award will be made to the responsible offeror submitting the lowest evaluated price. To establish Technical Capability (Pass/Fail), the quotation must demonstrate a clear understanding of the work statement requirements, conform strictly to all specifications in the attached Statement of Work, and provide any adequate capability and corporate experience documentation required by the solicitation. Failure to meet these criteria will render the quotation unacceptable. The Government will evaluate recent (completed within the last three years) and relevant past performance to assess the likelihood of successful performance. Past performance will be evaluated on an acceptable or unacceptable basis. To receive an acceptable rating, past performance must demonstrate a rating of satisfactory or higher performance of similar work. Offerors without recent or relevant past performance will be assessed as "Neutral" and considered acceptable for award. Past performance demonstrating marginal or below performance is unacceptable. Offerors shall identify all subcontractors anticipated to perform work under this contract. For each subcontractor, the offeror shall provide the subcontractor’s name, address, point of contact, phone number, the specific work items/specifications they will perform, and the percentage of work they will execute. Submit offers electronically via email to the points of contact identified in this notice. The Government does not prescribe a specific quotation format. Offerors must submit a quotation that clearly identifies the items offered and demonstrates compliance with the stated requirements. Submissions must be complete, clear, and presented in a format that allows effective evaluation by the Government. Submit all questions via email to the points of contact identified in this notice. The Government will not accept telephone inquiries. Submit offers on a firm-fixed-price basis. Prices must be all-inclusive and must cover all costs associated with providing the services, including but not limited to manufacturing, packaging, handling, transportation, duties, tariffs, fees, and any other costs. The Government may consider offers nonresponsive if they include conditional pricing, price escalation language, or statements indicating that prices are subject to adjustment based on future costs or fees. The Government intends to evaluate offers and make award without discussions; therefore, offerors should submit their best offer with initial submission. The Statement of Work and the list of applicable FAR provisions and clauses are attached to this notice.
-Combined Synopsis11/09/2026

Additional Details

Solicitation Number

70Z03326Q2019000010

Archive Date

Sep 26, 2026

Office Address

SEATTLE, WA, 98134