GovChime
Notice ID: e526c8d5ab174cf5a3fcd0f6622e5974Combined Synopsis/SolicitationArchived

US Coast Guard Air Station Savannah Generator

Archived on September 20, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM EDT
Posted
September 15, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total

Notice details

Office
BASE CHARLESTON
Place of performance
Savannah, Georgia, 31409
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z036-26Q-AIRSTAGEN
Notice ID
e526c8d5ab174cf5a3fcd0f6622e5974

Description

8/14/2026 Amendment #5 to post rest of questions_document dated 8/19/2026

8/13/2026 Amendment #4

1) To add Period of Performance: Work to be completed no later than 12/11/2026.

2) To add additional document with questions and answers dated 8/13/2026 along with more pictures

3) Added wage determination numbers in description below 

8/11/2026 Amendment #3:

1) To update SF-1449 Request for Quote document for the following: 1) NAICS code to match 238210 size standard $19M 2) Clarified description in line 20 of SF-1449. 3) Fixed email address in Box 15 to reflect Jacqueline.L.Robinson@uscg.mil. See updated document Request for Quote_70Z036-26Q-AIRSTAGEN_Updated 8-11-2026

2) Questions will now be due 8/13/2026 by 11AM EST.

3) Additional pictures added to attachments.   

4) PROVISIONS AND CLAUSES UPDATE/CLARIFICATION: 1) Site Visit Clause in Provisions and Clauses document has been updated to take location out of CLAUSE 52.237-1. Site visit will be at address on SOW.  2) 3052.215-70 Key personnel or facilities - The designated key personnel listed within clause are not designated for this requirement. 3) Evaluation Methodology FAR 52.212-2 WILL NOT APPLY. Evaluation Method will be Lowest Price Technically Acceptable as stated in Request for Quote Document. FAR 52.217-8 and 52.217-9 OPTION CLAUSES (PRICED OPTIONS) WILL NOT APPLY TO THIS SOLICITATION. 4) NAICS updated - CORRECT NAICS IS 238210 WITH $19M SIZE STANDARD for this requirement. See updated provisions and clauses document 8-11-2026. 

8/6/2026 Amendment #2- To change quote due date to from 8/19/2026 to 8/21/2026. Questions now due 8/14/2026 by 11AM EST, and answers will be posted by 8/19/2026 at 2PM EST.

7/27/2026 Amendment #1 - to change site visit requirement to HIGHLY ENCOURAGED, not mandatory. Change is reflected on updated Statement of Work_7/27/2026

This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice.  This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued.  This combined synopsis constitutes a solicitation and incorporates provisions and clauses in effect through federal acquisition circular 2024-02. 

The solicitation number is 70Z036-26-Q-AIRSTAGEN.  This acquisition is 100% set aside for small businesses.  The NAICS code is 238210, with a size standard of $19M. Wage Determination No: 2015-4491 Revision No: 33 Date of Last Revision: 5/13/2026

The contract type will be a firm fixed-price purchase order.  The evaluation process will be Lowest Price Technically Acceptable.

The United States Coast Guard (USCG) has a requirement to remove and dispose of the current emergency generator and the automatic transfer switch at Bldg 830 at Air Station Savannah, GA.  Specific requirements are detailed in the Statement of Work (SOW). 

Site visit is HIGHLY ENCOURAGED by prospective bidders to inspect the work in place and verify the amount of work necessary to complete the job.  Prospective bidders must schedule a site visit by emailing the Air Station Facilities Engineer LCDR Dan Blaich at Daniel.J.Blaich@uscg.mil or the Public Works Division Billy Hopkins, billy.r.hopkins@uscg.mil, between the hours 0800-1530 on normal business days.

Failure to conduct a site visit does not relieve bidders of responsibility for properly estimating the difficulty or cost of successfully performing this work.  The Government assumes no responsibility for any assumptions, understandings, or representations made by any of its officers or agents unless such information is included in the solicitation, SOW, or other written documents.

All questions regarding this solicitation must be submitted in writing to Jacqueline.L.Robinson@uscg.mil by 11:00 AM EST Thursday, August 13, 2026.  Please include the solicitation number in the subject line of the email.  To maintain fairness, all questions and their corresponding answers will be posted on the solicitation no later than 2:00 PM EST August 19,2026 for visibility to all interested vendors.  Questions submitted after the deadline will not be answered.

POINT OF CONTACT (POC):

SKC Jackie Robinson

Telephone: (571) 608-6777

Email: Jacqueline.L.Robinson@uscg.mil

LOCATION

All work shall take place at the following location:

United States Coast Guard Air Station Savannah

Hunter Army Airfield, 1297 North Lightning Road, Savannah, GA, 31409

Ensure sure that your UEI is updated/or registered via www.SAM.gov website.  It is mandatory that your UEI number is active within the SAM.gov website before doing business with the Coast Guard.

Interested vendors must download and review all attachments included in this solicitation package, which consist of the Statement of Work (SOW), Service Contract Act Wage Determination, SF-1449 RFQ, and applicable Provisions and Clauses. Please read the entire solicitation package carefully before preparing your quote.

Quotes must include a detailed breakdown of estimated labor and material costs, and must clearly display the vendor’s Unique Entity Identifier (UEI) and Tax Identification Number (TIN).

All quotes must be submitted via email to Jacqueline.L.Robinson@uscg.mil no later than 11:00 AM EST on August 21, 2026.   In addition to submitting your bid on the SF-1449, please provide a brief technical proposal that demonstrates an understanding of the Statement of Work and describes the approach to fulfilling all requirements.

Quotes submitted via mail or telephone will not be accepted.  A formal notice of changes (if applicable) will be issued in SAM.Gov.

The Government intends to award the contract in its entirety to a single contractor on an all-or-nothing basis to the responsible offeror whose proposal is determined to be the lowest price technically acceptable (LPTA) and most advantageous to the Government, in accordance with the evaluation and award procedures outlined in FAR 13.106.  While the intent is to select one contractor for this acquisition, the Government reserves the right not to make an award at all, depending on the quality of the proposals, the prices submitted, and the availability of funds.

The Government reserves the right to reject any quotation that is deemed unreasonable in terms of program commitments, including contract terms and conditions, or if the cost is unreasonably high or low when compared to Government estimates.  A proposal may be rejected if it reflects an inherent lack of competence or a failure to understand the complexity and risks associated with the program.

Applicable FAR Clauses by References: 

52.212-4 Contract Terms and Conditions - Commercial Products and Commercial Services.

52.212-5- Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services.

FAR 52.222-90, "Addressing DEI Discrimination by Federal Contractors" (APR 2026)

This solicitation incorporates FAR 52.225-1, Buy American—Supplies (Feb 2021)

Service Contract Act Wage Determination #2015-4491 Revision 33 Published 5/13/2026 (delete if a supply only purchase).

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (30)

  • Questions and Answers posted 8-19-2026.docx

    26 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Emergency Power Panel 1 Inside.jpg

    258 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Emergency Power Panel 2 Inside.jpg

    224 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • E-Gen Transformer.jpg

    501 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Emergency Power Panel 1 Outside.jpg

    294 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Emergency Power Panel 2 Outside.jpg

    367 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Emergency Power Panel 1.jpg

    300 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Emergency Power Panel 2.jpg

    263 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • QUESTIONS AND ANSWERS_POSTED 8-13-2026.docx

    26 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Provisions and Clauses updated 8-11-2026.pdf

    553 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Inside Gen room.jpg

    500 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Outside Gen Room.jpg

    416 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Eng Data plate.jpg

    370 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Generator Panel.jpg

    329 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Main Power Distribution.jpg

    295 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Gen output.jpg

    305 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Generator 2.jpg

    252 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Inside door ATS.jpg

    243 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • ATS power.jpg

    312 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Inside ATS.jpg

    278 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Gen Data Plate.jpg

    246 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • ATS and Battery charger.jpg

    265 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • ATS Data plate.jpg

    167 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Request for Quote_70Z036-26Q-AIRSTAGEN_Updated 8-11-2026.pdf

    737 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Request for Quote_70Z036-26Q-AIRSTAGEN_Updated.pdf

    572 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Statement of Work for AIRSTA Savannah -Hangar Emergency Generator 2026 Updated 7-27-2026.pdf

    364 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Provisions and Clauses.pdf

    371 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Wage Determinations for Chatham County.txt

    43 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Statement of Work for AIRSTA Savannah -Hangar Emergency Generator 2026.pdf

    363 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Request for Quote_70Z036-26Q-AIRSTAGEN.pdf

    521 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    US Coast Guard Air Station Savannah Generator

    Notice 97d36cf52c0142ffb8c76860c3455515 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    US Coast Guard Air Station Savannah Generator

    Notice 2d26211ce711455992c7ddad3b43d39f on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    US Coast Guard Air Station Savannah Generator

    Notice db2e0f4aea3c4978910789afc7965cf9 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    US Coast Guard Air Station Savannah Generator

    Notice c22440b8cccf4172b9b51d603c1abd12 on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    US Coast Guard Air Station Savannah Generator

    Notice c59c7f62dac44353970c12afa9ce55e0 on SAM.gov

  6. 7
    Version 7Combined Synopsis/SolicitationArchived

    US Coast Guard Air Station Savannah Generator

    Notice 8a36fe0caf654859894e396664349c16 on SAM.gov

  7. 10
    Version 10Combined Synopsis/SolicitationArchivedCurrent

    US Coast Guard Air Station Savannah Generator

    Notice e526c8d5ab174cf5a3fcd0f6622e5974 on SAM.gov

  8. 13
    Version 13Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    US Coast Guard Air Station Savannah Generator

    Notice a30a299516574959831187cbb4f789d8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
59%
AwardedOpen
***Please read and adhere to the attachments in this RFQ. This requirement is a set aside for small business. If there are any questions please contact Kimberly Bunn, Contract Specialist Naval Medical Center Portsmouth, VA via email Kimberly.p.bunn.civ@health.mil No Phone calls regarding this solicitation will be taken only email. All interested vendors, for your bid to be considered submit a quote of your product with descriptions and or item part numbers for evaluation, along with an up-to-date SAMs registration. All interested vendors who submit a bid to the contact listed in this posting for your bid to be considered. It is not the responsibility of the Contract Specialist to follow up with what the vendor is missing upon submission. All interested vendors upon submission of an offer, invoices of at least 2 are required from either private or public institutions of these products. Refer to the Description/ Specifications/ Statement of work page for product information and salient characteristics of this RFQ for details concerning base access and requirements needed to fulfill solicitation. Only offers for ALL requirements will be considered. ***This is an all or nothing solicitation, brand name or equal based on salient characteristics. A one-time site-visit walk through of the spaces will be conducted on Friday November 20th, 2026 @ 12:30 PM EST All interested vendors are required to be present and participate in the scheduled site visit. Vendors not attending this scheduled one-time group site visit may be considered ineligible for contract award. Contractors interested in attending the site visit must notify the Contract Specialist, Kimberly Bunn via e-mail kimberly.p.bunn.civ@health.mil no later than 10:00am (Eastern Time) on Monday, 16th 2026 of your company's intentions to participate in the site visit walk-through. Only contractors who have notified the Contract Specialist will be allowed to participate in the site visit. Vendors' technical and pricing proposals are due by close of business on Tuesday, 24 June 2026.
59%
Solicitation11/24/2026
GA-OKEFENOKEE NWR-00000-NEW VC ELECTRICA
59%
Combined Synopsis11/17/2026
Construction to upgrade electrical and HVAC components, near Building 191000 classrooms. This solicitation will be awarded in accordance with Revolutionary FAR Overhaul (RFO) Part 12 - Acquisition of Commercial Products and Commercial Services procedures. Your attention is directed to Section L and M for site visit information, quote preparation instructions, and evaluation criteria for award in the solicitation. Offerors are responsible for reviewing the entirety of the solicitation, attachments, and submitting quotes no later than the date/time specified. Offerors quotes and all associated documents called forth in the solicitation shall be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Quotes and all associated documents received outside the PIEE Solicitation Module will not be accepted by the U.S. Government and will be ignored. Amendment 0001 - See Attachments/Links to pull SF-30 amendment and associated attachments.
59%
Combined Synopsis08/28/2026
Amendment 0004: Extends solicitation until March 13th, 2026 at 1:00 PM EDT. END AMENDMENT. Amendment 0003: Extends solicitation until March 6th, 2026 at 1:00 PM EST. END AMENDMENT. Amendment 0002: Extends solicitation until March 3rd, 2026 at 1:00 PM EST. END AMENDMENT. Amendment 0001: The site visit is canceled due to no notification of attendance. END AMENDMENT. UPS system and power module replacement. See attached CSS for more details.
59%
Combined Synopsis03/13/2026

Additional Details

Solicitation Number

70Z036-26Q-AIRSTAGEN

Archive Date

Sep 20, 2026

Office Address

N CHARLESTON, SC, 29405