Sailing Vessel Maintenance & Storage
Overview
- Response deadline
- 8:00 AM UTC−04:00
- Posted
- August 11, 2021
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 713930: Marinas
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- CG ACADEMY(00039)
- Last updated
- Sep 9, 2025
Identifiers
- Solicitation number
- 70Z03921QPCCA67
- Notice ID
- 9f61b3a1d6474876a9fb7b589c2b1346
Description
This is a combined synopsis/solicitation for decommissioning, winter storage, maintenance/repair and commissioning of nine 44ft sailing vessels in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The combined Synopsis/Request for Quotation (RFQ) number is 70Z03921QPCCA67 utilizing Simplified Acquisition Procedures under FAR Part 13. The incorporated provisions and clauses are those in effect through Federal Acquisition circular 2005-90, applicable under NAICS is 713930. IAW attached Statement of Work (SOW), the contractor shall supply all required supervision, labor, materials and equipment to provide decommissioning, winter storage, and commissioning for nine CGAs 44ft sailing vessels. (J44 S/V Glory, L44 S/Vs Osprey, Razorbill, Shearwater, Stormy Petrel, Artic Tern, Blue Goose, Egret, Seahawk) as follows: Winterize engines prior to haul-out for the decommissioning. Shrinkwrap S/V Glory and remove shrinkwrap in spring. Allow access to 8 L44 vessels for installation and removal of winter covers by separate vendor. Prep, unstep, and store carbon fiber masts with indoor heated storage. Haul, winterize engines, wash bottoms, and block down for winter storage. Prep and step rigs. Sand, prep and paint bottoms 2coats rolled (8 EA L44 Sailing Vessels) Sand, prep and paint bottom 2 coats sprayed (J44 S/V Glory) Repair keel damage to S/V Stormy Petrels crush zone on trailing edge. Designers plan will be available for the repair. Commission and launch vessels based on agreed schedule. ** Coast Guard Academy staff will decommission and commission systems, replace zincs, remove and store booms** Limitation: Access to vessels must be available to CGA staff. Carbon Fiber Masts must be stored indoors with heating. Due to the limited abilities of the training vessels can only transit in the following waters: Thames River, New London CT Mystic River, Mystic CT Fishers Island Sound Eastern Long Island Sound Western Long Island Sound The Winter Storage contract can only be considered for contractors who have dry docking facilities accessible by the above mentioned waters. The dry docking facility awarded the contract must have the ability to haul a vessel with the following characteristics: Molded Beam (extreme) 15 Length Overall 44 Mast Height (From waterline) 78 Design Draft 10 The USCG Academy will deliver 9 sailing vessels to the contractor who is awarded the contract. Effective Period: 1 Sep 2021 thru 31 May 2022 Technical question may be addressed to Olsen, Charles email: Charles.P.Olsen@uscg.mil | ph: @ (860) 701-6186. RFQ package questions must be submitted via email to David Palacios email: david.f.palacios@uscg.mil | ph: (860) 444-8245.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
70Z03921QPCCA67- Combined Synopsis
- Combined SynopsisCurrentAug 11, 2021
Sailing Vessel Maintenance & Storage
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
70Z03921QPCCA67
Archive Date
Aug 25, 2021
Office Address
GROTON, CT, 06340