MULTICOUPLER UNIT
Archived on March 28, 2026. Original response deadline: . Full description on SAM.gov.
Description
The United States Coast Guard Surface Forces Logistics Center has a emergent requirement and requesting quotations for the following parts:
Item 1)
NSN: 5820-99-356-9046
MULTICOUPLER UNIT
HF MULTICOUPLER, MCU 6412 OEM: THALES SECURITY AND DEFENSE INC.
EACH UNIT TO BE INDIVIDUALLY PACKAGED I/A/W ASTM-D3951-10.
EACH UNIT TO HAVE ELECTROSTATIC PROTECTION I/A/W TYPE III, CLASS I OF MIL-B-81705C.
EACH UNIT TO BE INDIVIDUALLY MARKED I/A/W MIL-STD 129 W/CHANGE 4.
BAR CODING REQUIRED.
MFG: THALES DEFENSE & SECURITY, INC.
PN: 604324-01
QTY: 2 EA
*****STANDARD COMMERCIAL PACKAGING IS UNACCEPTABLE, IF YOU CANNOT MEET THE COAST GUARDS PACKAGING REQUIREMENTS YOUR QUOTE WILL NOT BE ACCEPTED. *****
Ship to: USCG SFLC, RECEIVING ROOM- BLDG. 88, 2401 HAWKINS POINT ROAD, BALTIMORE, MD 21226
This is a combined synopsis/solicitation for a commercial item prepared in accordance with the format outlined in FAR Subpart 12.6, FAC 2025-06 (Oct 1, 2026) and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. Quotations are being requested, and a written solicitation will not be issued. The NAICS code for this solicitation is 335999 and the business size standard is 600. The resultant purchase order will be awarded using simplified acquisition procedures in accordance with FAR 13.106 apply.
Substitute parts are not acceptable. It is anticipated that a non-competitive sole source purchase order shall be awarded as a result of this synopsis/solicitation. It is the Government’s belief that only Thales Defense & Security, Inc. and/or their authorized distributors can offer these units. Concerns having the expertise and required capabilities to provide this item are invited to submit complete information discussing the same within two (2) calendar days from the day this notice posted. The data must include sufficient details to allow the Coast Guard to evaluate the proposal relative to the requirements. The information submitted must include a letter from the OEM verifying the offeror is an authorized distributor verifying the OEM will supply genuine OEM parts.
The U.S. Coast Guard intends to award on an all or none basis to a responsible offeror whose offer conforming to the solicitation will be the most advantageous to the Government. The award will be lowest price technically acceptable. The Coast Guard intends to award a Firm Fixed Price Contract.
All responsible sources may submit a quotation, which if timely received, shall be considered by the Agency. Companies must have valid DUNS numbers and be registered with SYSTEMS FOR AWARD MANAGEMENT (www.sam.gov) and shall provide the company Tax Information Number (TIN) with their offer. The closing date and time for receipt of quote is March 13, 2025, at 10:00 am Eastern Standard Time
OFFERORS MUST SUBMIT THE FOLLOWING INFORMATION ON THEIR QUOTE:
Disclosure: The offeror under this solicitation represents that [Check one]:
__ it is not a foreign incorporated entity that should be treated as an inverted domestic corporation pursuant to the criteria of (HSAR) 48 CFR 3009.104-70 through 3009.104-73;
__ it is a foreign incorporated entity that should be treated as an inverted domestic corporation pursuant to the criteria of (HSAR) 48 CFR 3009.104-70 through 3009.104-73, but it has submitted a request for waiver pursuant to 3009.104-74, which has not been denied; or
__it is a foreign incorporated entity that should be treated as an inverted domestic corporation pursuant to the criteria of (HSAR) 48 CFR 3009.104-70 through 3009.104-73, but it plans to submit a request for waiver pursuant to 3009.104-74. (g) A copy of the approved waiver, if a waiver has already been granted, or the waiver request, if a waiver has been applied for, shall be attached to the bid or proposal
__HSAR 3052.209-70 Prohibition on contracts with corporate expatriates (June 2006)
(End of provision)
The following FAR Clauses provisions apply to this solicitation. FAR 52.212-1, Instructions to Offerors-Commercial Items (Sep 2023); FAR 52.212-3, Offeror Representations and Certifications-Commercial Items (Oct 2025) with Alternate I, Offeror(s) must include a completed copy of FAR 52.212-3 with their quote.
The following FAR Clauses apply to this solicitation. Offerors may obtain full text versions of these clauses electronically at www.acquisition.gov.; FAR 52.212-4, Contract Terms and Conditions-Commercial Items (Nov 2023); FAR 52.212-5, Contract Terms & Conditions Required to Implement Statutes or Executive Orders-Commercial Items (Oct 2025).
The following clauses are listed within FAR:
52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553)
52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)
The following clauses listed within 52.212-5 are applicable:
FAR 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020, with Alternate I (Nov 2021)
FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Mar 2020)
52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (June 2020)
52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (June 2020) (31 U.S.C. 6101 note).
FAR 52.219-28, Post Award Small Business Program representation (Feb 2024)(15 U.S.C. 632(a)(2)
FAR 52.222-3, Convict Labor (Jun 2003) (E.O. 11755)
FAR 52.222-19 Child Labor-Cooperation with Authorities and Remedies (Feb 2024) (E.O. 13126)
FAR 52.222-21, Prohibition of Segregated Facilities (April 2015)
FAR 52.222-50, Combat Trafficking in Persons (Oct 2025) (22 U.S.C. chapter 78 and E.O. 13627)
FAR 52.225-1 Buy American Act-Supplies (Oct 2022)
FAR 52.225-3, Buy American Act-Free Trade Agreement (Nov 2023) (41 U.S.C. 10a-10d)
FAR 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021)
52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) (31 U.S.C. 3332).
The following items are incorporated as addenda to this solicitation: Copies of HSAR clauses may be obtained electronically at www.dhs.gov.
CGAP 3042.302-90 Valuation Requirements for the Acquisition of Spare Parts Purchased for Inventory Control Points from HQ Contracts (OCT 2008). Copies of CGAP clauses may be obtained electronically at: www.uscg.mil/acquisition/procurement/pdf/CIM_4200_19H.pdf
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Showing 2 of 2 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | US COAST GUARD | Feb 25, 2026 | 51.1 KB | |||
| Combined Synopsis/Solicitation | US COAST GUARD | Feb 25, 2026 | 42 KB |
Lifecycle
70Z08026QDI002- Combined Synopsis
- 2×Combined SynopsisCurrentFeb 18, 2026
MULTICOUPLER UNIT
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
The attached Exception fo Fair Opportunity is published in accordance with award made to Dedrone Defense, LLC under delivery order number 70T05026F6116N004 on 28 September 2026. | Sole Source / J&A | 335999 | No Set-Aside | 10/05/2026 | Open | - | |
SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI) Power Distribution and Illumination Systems, Electrical (PDISE) Issuing Agency: Department of the Army, Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Belvoir Division Portfolio Acquisition Executive (PAE): PAE Agile Sustainment & Ammunition (PAE ASA) Project Manager (PM): PM Expeditionary Energy and Sustainment Systems (PM E2S2) NAICS Code: 335999 (Miscellaneous Electrical Equipment and Component Manufacturing) and 335313 (Switchgear and Switchboard Apparatus Manufacturing) PSC / FSC Code: 6150 (Miscellaneous Electric Power and Distribution Equipment) Classification Code: 61 (Electric wire, and power and distribution equipment) Notice Type: Sources Sought / Request for Information (Market Research under FAR Part 10) 1.0 DISCLAIMER & SPECIAL NOTICES This is a Request for Information (RFI) / Sources Sought Synopsis issued solely for information and planning purposes in accordance with FAR 15.201(e) and FAR Part 10. This notice does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or an obligation on the part of the Government to acquire any products or services. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for information submitted in response to this RFI, nor will it reimburse respondents for any costs incurred in preparing responses. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. All submissions become Government property and will not be returned. 2.0 PROGRAM BACKGROUND & SCOPE The PM E2S2 has a potential requirement for the build-to-print manufacture, assembly, first article inspection, preproduction First Article testing, and delivery of the PDISE family of systems and associated components and packaging. PDISE is a standardized, ruggedized, man-portable family of electrical feeder and distribution equipment that connect mobile power generation equipment and warfighter mission equipment in harsh tactical environments across Multi-Domain Operations (MDO). The PDISE family consists of five Government-owned Technical Data Package (TDP) end-item Configuration Items (CIs) and their associated accessories. For this acquisition, only four of those end-items are required. The M60 A/P Distribution System is not anticipated to be included in this acquisition effort. The following systems will be procured: M200 A/P Feeder System: 3-Phase, 200 Amperes/Phase (MIL-DTL-53126/1; Drawing 13229E6350) (NSN 6150-01-308-5672) M100 A/P Feeder System: 3-Phase, 100 Amperes/Phase (MIL-DTL-53126/2; Drawing 13229E6351) (NSN 6150-01-308-5671) M40 A/P Distribution System: 3-Phase, 40 Amperes/Phase (MIL-DTL-53126/3; Drawing 13229E6353) (NSN 6150-01-307-9446) M46 Utility Assembly: Electrical Receptacles and Illumination Kit (MIL-DTL-53126/5; Drawing 13226E7046) (NSN 6150-01-208-9751) Procurement Baseline: Build-to-print execution using existing Government TDPs, MIL-DTL-53126, and associated specification slash sheets. TDPs for the PDISE systems are available upon request. 3.0 PURPOSE OF THIS RFI The Government seeks to determine: The availability of qualified large and small business sources under NAICS 335999 and 335313 capable of manufacturing, testing, and delivering the PDISE family of systems. Industry capacity and lead times for manufacturing and assembling heavy-duty electrical power-distribution equipment, including Class L connectors, ruggedized cables, military packaging and specialized circuit breakers. Vendor capability to conduct First Article Testing (FAT) and environmental testing per MIL-DTL-53126. Rough Order of Magnitude (ROM) unit cost for each item. The feasibility of small business set-asides (e.g., Total Small Business, 8(a), HUBZone, SDVOSB, or WOSB). 4.0 SPECIFIC INFORMATION REQUESTED (VENDOR QUESTIONNAIRE) Interested vendors are requested to provide clear, detailed responses to the questions below. Generic corporate marketing brochures that do not directly address these technical and manufacturing questions will not be considered. Section A: Corporate & Business Information Company Profile: Provide Company History (years in business), Name, Address, Website, CAGE Code, and Unique Entity Identifier (UEI) under SAM.gov. Business Size Standards: State your business size (number of employees) and socio-economic status under NAICS 335999 and 335313. Specify if your firm is: Large Business Small Business (SB) Small Disadvantaged Business (SDB) / 8(a) Service-Disabled Veteran-Owned Small Business (SDVOSB) Historically Underutilized Business Zone (HUBZone) Woman-Owned Small Business (WOSB / EDWOSB) Role & Teaming Intent: Do you intend to respond to a solicitation as a Prime Contractor, Joint Venture / Teaming Partner, or Subcontractor? If teaming or subcontracting, describe proposed workshare allocations and your strategy to satisfy the Limitations on Subcontracting (FAR 52.219-14). Workload: If your company is awarded the contract, will you be able to perform at least 50% (percent) of the work required in house? Relevant Corporate Experience and Past Performance: Provide up to three examples of recent, relevant efforts involving build-to-print manufacture, inspection, testing, and delivery of ruggedized electrical distribution equipment, cable assemblies, or comparable military hardware. For each example, identify the customer, period of performance, scope, quantities, contract value, and customer point of contact, if available. Limit each past-performance example to two pages. Section B: Build-to-Print Manufacturing & Technical Capabilities TDP & Specification Conformance: PDISE requires fabrication to Government TDPs without redesign. Describe your facility’s experience manufacturing ruggedized power distribution centers, electrical enclosures, and high-power tactical cables to Government drawings (ASME Y14.100 / MIL-STD-31000). Tooling & Production Processes: Describe your capabilities for: Heavy-gauge multi-conductor power cable assembly. Assembly and wiring of circuit breaker inside distribution enclosures. Integration of MIL-DTL-22992 (Class L) heavy-duty cylindrical connectors into enclosures and cabling. Facilities and Production Control: Describe the availability, size, and location of facilities; manufacturing equipment; production capacity; production-control processes; records-management practices; and reporting systems used to support cost, schedule, and performance requirements. Chemical Agent Resistant Coating (CARC): PDISE enclosures require pre-treatment and painting conforming to MIL-DTL-53072 and SAE-AMS-STD-595. Does your facility possess in-house CARC painting capabilities or do you rely on qualified third-party coating vendors? Packaging & Wood Packaging Material (WPM): Can your facility provide military preservation, marking, and crating conforming to Drawings 13230E7021/7020/7019? Manufacturing Readiness Level (MRL): What is your current assessed Manufacturing Readiness Level for this class of tactical electrical distribution hardware? In-Process and Final Inspection: Describe your processes for receiving inspection of components and materials, in-process inspection, final inspection, nonconformance control, and documentation of inspection of completed PDISE or similar end items, as applicable. Section C: First Article Testing (FAT) & Environmental Qualification In-House vs. Subcontracted Testing: PDISE First Article Preproduction Inspection (FAT) requires 2 units per configuration tested within 180–360 Days After Contract Award (DACA). Identify whether your company possesses internal testing facilities or an established relationship with a DoD-certified laboratory to conduct First Article Testing in accordance with MIL-DTL-53126. Failure Escalation & Root Cause Analysis: Describe your engineering experience and/or procedures for performing root cause failure investigations and delivering Failed Item Analysis Reports (FIARs) and Test Incident Reports (TIRs) (DI-MISC-80711). Section D: Quality Management & Configuration Control Quality Certifications: Is your quality management system certified to ISO 9001:2015, AS9100D, or an equivalent standard? Provide certificate numbers and registrar details. Configuration Management System (CMS): The contractor cannot deviate from the TDP without formal Government approval via Engineering Change Proposals (ECPs) or Requests for Variance (RFVs). Describe your formal configuration management process for tracking baseline changes in accordance with MIL-STD-3046 and MIL-HDBK-61. Section E: Supply Chain Resilience, Surge Capacity & Lead Times Long-Lead Material Availability: Certain components (e.g., MIL-DTL-22992 Class L connectors, Mil-Spec lumber, specialized Mil-Spec circuit breakers and cables) historically experience extended lead times. What are your current supplier’s lead times for these or similar critical long-lead items? How does your company mitigate obsolescence and supply chain disruptions? Production Throughput & Surge Capacity: What is your estimated monthly steady-state production throughput for PDISE systems (M200, M100, M40, M46)? What is your maximum surge capacity (percentage increase above steady-state) that could be sustained under Defense Priorities and Allocations System (DPAS) rated orders (e.g., DO/DX ratings)? Army Arsenal Integration (Make-or-Buy): In accordance with the Army Make-or-Buy policy (DI-MGMT-82398), prime contractors must assess manufacturing end-item components within the US Army Arsenal System (e.g., Rock Island Arsenal, Watervliet Arsenal). Does your organization have prior experience partnering with or evaluating Army Arsenals for component production? Section F: Past Performance & Rough Order of Magnitude (ROM) Relevant Experience: Provide up to three (3) examples of contracts completed or performed within the past five (5) years involving the manufacture, testing, or delivery of tactical electrical distribution, high-voltage vehicle power systems, or comparable DoD equipment. Include: Contract Number & Customer / Agency Total Dollar Value Period of Performance Specific Scope Executed (Prime vs. Subcontractor) Lead Time to First Delivery: Provide an estimated timeline (Months After Contract Award) for: First Article Preproduction Unit fabrication (Target: ≤180 DACA) First Article Testing completion and report submittal (Target: ≤360 DACA) Production delivery commencement following FAT approval Section G: ROM PRICING BY QUANTITY RANGE Provide quantity-based, per-unit Rough Order of Magnitude (ROM) pricing for each of the anticipated end items: M200 A/P Electrical Feeder System, M100 A/P Electrical Feeder System, M40 A/P Electrical Distribution System, and M46 Electrical Utility Assembly. Provide ROM pricing for the following quantity ranges: 1–50, 51–100, and 101–200 units. Identify significant pricing assumptions, long-lead material considerations, and any quantity-price breakpoints. 5.0 SUBMISSION INSTRUCTIONS & FORMAT Submission Deadline: 11/06/2026 by 4:00 PM Eastern Time. Page Limit: Responses shall not exceed twenty (20) pages (excluding title page, executive summary, and certs/licenses), 8.5" x 11" paper, font size 12 pt for the body text and 10-11 pt for any text in table or graphics, Times New Roman font, with a minimum of one (1) inch margins all around. File Format: Deliver responses electronically in Adobe PDF or Microsoft Word format. Submission Channel: Submissions must be transmitted via email to the Contract Specialist and Contracting Officer: Contracting Officer: Rosetta Wisdom-Russell- rosetta.wisdom-russell.civ@army.mil Contract Specialist: Thao Trinh - thao.h.trinh.civ@army.mil Subject Line: RFI Response: PDISE Manufacturing Capabilities – [Company Name] 6.0 GOVERNMENT SUMMARY & NEXT STEPS The Government will evaluate market survey responses to determine the acquisition strategy, specifically whether a small business set-aside is warranted under FAR Part 19 or if full-and-open competition is required. Interested vendors are strongly encouraged to register in the System for Award Management (SAM) and ensure active status under NAICS 335999 and 335313. | Market Research | 335999 | No Set-Aside | 10/19/2026 | 11/06/2026 | - | |
SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI) Power Distribution and Illumination Systems, Electrical (PDISE) Issuing Agency: Department of the Army, Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Belvoir Division Portfolio Acquisition Executive (PAE): PAE Agile Sustainment & Ammunition (PAE ASA) Project Manager (PM): PM Expeditionary Energy and Sustainment Systems (PM E2S2) NAICS Code: 335999 (Miscellaneous Electrical Equipment and Component Manufacturing) and 335313 (Switchgear and Switchboard Apparatus Manufacturing) PSC / FSC Code: 6150 (Miscellaneous Electric Power and Distribution Equipment) Classification Code: 61 (Electric wire, and power and distribution equipment) Notice Type: Sources Sought / Request for Information (Market Research under FAR Part 10) 1.0 DISCLAIMER & SPECIAL NOTICES This is a Request for Information (RFI) / Sources Sought Synopsis issued solely for information and planning purposes in accordance with FAR 15.201(e) and FAR Part 10. This notice does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or an obligation on the part of the Government to acquire any products or services. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for information submitted in response to this RFI, nor will it reimburse respondents for any costs incurred in preparing responses. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. All submissions become Government property and will not be returned. 2.0 PROGRAM BACKGROUND & SCOPE The PM E2S2 has a potential requirement for the build-to-print manufacture, assembly, first article inspection, preproduction First Article testing, and delivery of the PDISE family of systems and associated components and packaging. PDISE is a standardized, ruggedized, man-portable family of electrical feeder and distribution equipment that connect mobile power generation equipment and warfighter mission equipment in harsh tactical environments across Multi-Domain Operations (MDO). The PDISE family consists of five Government-owned Technical Data Package (TDP) end-item Configuration Items (CIs) and their associated accessories. For this acquisition, only four of those end-items are required. The M60 A/P Distribution System is not anticipated to be included in this acquisition effort. The following systems will be procured: M200 A/P Feeder System: 3-Phase, 200 Amperes/Phase (MIL-DTL-53126/1; Drawing 13229E6350) (NSN 6150-01-308-5672) M100 A/P Feeder System: 3-Phase, 100 Amperes/Phase (MIL-DTL-53126/2; Drawing 13229E6351) (NSN 6150-01-308-5671) M40 A/P Distribution System: 3-Phase, 40 Amperes/Phase (MIL-DTL-53126/3; Drawing 13229E6353) (NSN 6150-01-307-9446) M46 Utility Assembly: Electrical Receptacles and Illumination Kit (MIL-DTL-53126/5; Drawing 13226E7046) (NSN 6150-01-208-9751) Procurement Baseline: Build-to-print execution using existing Government TDPs, MIL-DTL-53126, and associated specification slash sheets. TDPs for the PDISE systems are available upon request. 3.0 PURPOSE OF THIS RFI The Government seeks to determine: The availability of qualified large and small business sources under NAICS 335999 and 335313 capable of manufacturing, testing, and delivering the PDISE family of systems. Industry capacity and lead times for manufacturing and assembling heavy-duty electrical power-distribution equipment, including Class L connectors, ruggedized cables, military packaging and specialized circuit breakers. Vendor capability to conduct First Article Testing (FAT) and environmental testing per MIL-DTL-53126. Rough Order of Magnitude (ROM) unit cost for each item. The feasibility of small business set-asides (e.g., Total Small Business, 8(a), HUBZone, SDVOSB, or WOSB). 4.0 SPECIFIC INFORMATION REQUESTED (VENDOR QUESTIONNAIRE) Interested vendors are requested to provide clear, detailed responses to the questions below. Generic corporate marketing brochures that do not directly address these technical and manufacturing questions will not be considered. Section A: Corporate & Business Information Company Profile: Provide Company History (years in business), Name, Address, Website, CAGE Code, and Unique Entity Identifier (UEI) under SAM.gov. Business Size Standards: State your business size (number of employees) and socio-economic status under NAICS 335999 and 335313. Specify if your firm is: Large Business Small Business (SB) Small Disadvantaged Business (SDB) / 8(a) Service-Disabled Veteran-Owned Small Business (SDVOSB) Historically Underutilized Business Zone (HUBZone) Woman-Owned Small Business (WOSB / EDWOSB) Role & Teaming Intent: Do you intend to respond to a solicitation as a Prime Contractor, Joint Venture / Teaming Partner, or Subcontractor? If teaming or subcontracting, describe proposed workshare allocations and your strategy to satisfy the Limitations on Subcontracting (FAR 52.219-14). Workload: If your company is awarded the contract, will you be able to perform at least 50% (percent) of the work required in house? Relevant Corporate Experience and Past Performance: Provide up to three examples of recent, relevant efforts involving build-to-print manufacture, inspection, testing, and delivery of ruggedized electrical distribution equipment, cable assemblies, or comparable military hardware. For each example, identify the customer, period of performance, scope, quantities, contract value, and customer point of contact, if available. Limit each past-performance example to two pages. Section B: Build-to-Print Manufacturing & Technical Capabilities TDP & Specification Conformance: PDISE requires fabrication to Government TDPs without redesign. Describe your facility’s experience manufacturing ruggedized power distribution centers, electrical enclosures, and high-power tactical cables to Government drawings (ASME Y14.100 / MIL-STD-31000). Tooling & Production Processes: Describe your capabilities for: Heavy-gauge multi-conductor power cable assembly. Assembly and wiring of circuit breaker inside distribution enclosures. Integration of MIL-DTL-22992 (Class L) heavy-duty cylindrical connectors into enclosures and cabling. Facilities and Production Control: Describe the availability, size, and location of facilities; manufacturing equipment; production capacity; production-control processes; records-management practices; and reporting systems used to support cost, schedule, and performance requirements. Chemical Agent Resistant Coating (CARC): PDISE enclosures require pre-treatment and painting conforming to MIL-DTL-53072 and SAE-AMS-STD-595. Does your facility possess in-house CARC painting capabilities or do you rely on qualified third-party coating vendors? Packaging & Wood Packaging Material (WPM): Can your facility provide military preservation, marking, and crating conforming to Drawings 13230E7021/7020/7019? Manufacturing Readiness Level (MRL): What is your current assessed Manufacturing Readiness Level for this class of tactical electrical distribution hardware? In-Process and Final Inspection: Describe your processes for receiving inspection of components and materials, in-process inspection, final inspection, nonconformance control, and documentation of inspection of completed PDISE or similar end items, as applicable. Section C: First Article Testing (FAT) & Environmental Qualification In-House vs. Subcontracted Testing: PDISE First Article Preproduction Inspection (FAT) requires 2 units per configuration tested within 180–360 Days After Contract Award (DACA). Identify whether your company possesses internal testing facilities or an established relationship with a DoD-certified laboratory to conduct First Article Testing in accordance with MIL-DTL-53126. Failure Escalation & Root Cause Analysis: Describe your engineering experience and/or procedures for performing root cause failure investigations and delivering Failed Item Analysis Reports (FIARs) and Test Incident Reports (TIRs) (DI-MISC-80711). Section D: Quality Management & Configuration Control Quality Certifications: Is your quality management system certified to ISO 9001:2015, AS9100D, or an equivalent standard? Provide certificate numbers and registrar details. Configuration Management System (CMS): The contractor cannot deviate from the TDP without formal Government approval via Engineering Change Proposals (ECPs) or Requests for Variance (RFVs). Describe your formal configuration management process for tracking baseline changes in accordance with MIL-STD-3046 and MIL-HDBK-61. Section E: Supply Chain Resilience, Surge Capacity & Lead Times Long-Lead Material Availability: Certain components (e.g., MIL-DTL-22992 Class L connectors, Mil-Spec lumber, specialized Mil-Spec circuit breakers and cables) historically experience extended lead times. What are your current supplier’s lead times for these or similar critical long-lead items? How does your company mitigate obsolescence and supply chain disruptions? Production Throughput & Surge Capacity: What is your estimated monthly steady-state production throughput for PDISE systems (M200, M100, M40, M46)? What is your maximum surge capacity (percentage increase above steady-state) that could be sustained under Defense Priorities and Allocations System (DPAS) rated orders (e.g., DO/DX ratings)? Army Arsenal Integration (Make-or-Buy): In accordance with the Army Make-or-Buy policy (DI-MGMT-82398), prime contractors must assess manufacturing end-item components within the US Army Arsenal System (e.g., Rock Island Arsenal, Watervliet Arsenal). Does your organization have prior experience partnering with or evaluating Army Arsenals for component production? Section F: Past Performance & Rough Order of Magnitude (ROM) Relevant Experience: Provide up to three (3) examples of contracts completed or performed within the past five (5) years involving the manufacture, testing, or delivery of tactical electrical distribution, high-voltage vehicle power systems, or comparable DoD equipment. Include: Contract Number & Customer / Agency Total Dollar Value Period of Performance Specific Scope Executed (Prime vs. Subcontractor) Lead Time to First Delivery: Provide an estimated timeline (Months After Contract Award) for: First Article Preproduction Unit fabrication (Target: ≤180 DACA) First Article Testing completion and report submittal (Target: ≤360 DACA) Production delivery commencement following FAT approval Section G: ROM PRICING BY QUANTITY RANGE Provide quantity-based, per-unit Rough Order of Magnitude (ROM) pricing for each of the anticipated end items: M200 A/P Electrical Feeder System, M100 A/P Electrical Feeder System, M40 A/P Electrical Distribution System, and M46 Electrical Utility Assembly. Provide ROM pricing for the following quantity ranges: 1–50, 51–100, and 101–200 units. Identify significant pricing assumptions, long-lead material considerations, and any quantity-price breakpoints. 5.0 SUBMISSION INSTRUCTIONS & FORMAT Submission Deadline: 10/22/2026 by 3:00 PM Eastern Time. Page Limit: Responses shall not exceed twenty (20) pages (excluding title page, executive summary, and certs/licenses), 8.5" x 11" paper, font size 12 pt for the body text and 10-11 pt for any text in table or graphics, Times New Roman font, with a minimum of one (1) inch margins all around. File Format: Deliver responses electronically in Adobe PDF or Microsoft Word format. Submission Channel: Submissions must be transmitted via email to the Contract Specialist and Contracting Officer: Contracting Officer: Rosetta Wisdom-Russell- rosetta.wisdom-russell.civ@army.mil Contract Specialist: Thao Trinh - thao.h.trinh.civ@army.mil Subject Line: RFI Response: PDISE Manufacturing Capabilities – [Company Name] 6.0 GOVERNMENT SUMMARY & NEXT STEPS The Government will evaluate market survey responses to determine the acquisition strategy, specifically whether a small business set-aside is warranted under FAR Part 19 or if full-and-open competition is required. Interested vendors are strongly encouraged to register in the System for Award Management (SAM) and ensure active status under NAICS 335999 and 335313. | Market Research | 335999 | No Set-Aside | 10/07/2026 | 10/22/2026 | - | |
| Awarded | 335999 | No Set-Aside | 10/19/2026 | Open | - | ||
Proposed procurement for NSN 5940012287478 TERMINAL JUNCTION BLOC: Line 0001 Qty 31 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0139 DAYS ADO This is a source controlled drawing item. Approved sources are 1Y249 5260; 83311 5260. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | Combined Synopsis | 335999 | Total Small Business Set-Aside | 10/19/2026 | 10/27/2026 | - |
Additional Details
Solicitation Number
70Z08026QDI002
Archive Date
Mar 28, 2026
Office Address