GovChime
Notice ID: 7368a8994dec47abbd9a1cd4ef499514Special NoticeArchived

USCGC HEALY BOILER TECHNICIAN TRAINING

Archived on February 11, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 AM PST
Posted
January 20, 2026
Notice type
Special Notice
Set-aside
8(a) Sole Source
NAICS
336611: Ship Building and Repairing
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
SFLC PROCUREMENT BRANCH 2(00085)
Place of performance
Louisville, Kentucky, 40218
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z08526Q000171
Notice ID
7368a8994dec47abbd9a1cd4ef499514

Description

NOTICE OF INTENT TO SOLE SOURCE 70Z08526Q000171

The Department of Homeland Security {DHS}, United States Coast Guard {USCG} Surface Forces Logistics Center {SFLC}, located at 1 Eagle Road Bldg. 55, Alameda CA 94501 is issuing this Notice of Intent {NOI} to inform industry contractors of the Government's intent to Award a Sole Source Firm Fixed Price {FFP} Contract IAW Federal Acquisition Regulation {FAR} Part 12 and 13 procedures.

The intended Contractor WARE INC., located at 3401 Bashford Ave Court Louisville, KY 40218 United States.

USCG SFLC requires: CGC Healy Boiler Technician Maintenance Training.

This procurement is being conducted using commercial item procedures pursuant to Federal Acquisition Regulation {FAR} Part 12 and FAR Part 13, specifically FAR 13.106-1{b}{1}, allowing the Contracting Officer

{KO} to solicit from one source.

The North American Industry Classification System {NAICS} for this requirement is 336611 - Ship Building and Repairing. The Product of Service Code for this requirement is U008. This will not be a small business under the Small Business Administration {SBA} size standard for this sector.

This notice of intent is neither a formal solicitation nor a request for competitive proposals. No solicitation document is available, and telephone requests will not be honored. No award will be made on the basis of unsolicited quotations or offers received in response to this notice. Any response to this notice must show clear, compelling and convincing evidence that competition will be advantageous to

the Government. The intent of this synopsis is for informational purposes only. Information received will normally be considered solely for the purpose of determining whether to conduct competitive procurement. A determination by the Government not to complete this action based on this notice is solely within the discretion of the Government.

All inquiries and concerns must be addressed in writing via e-mail to Ms. Oneal at donna.j.oneal@uscg.mil with the following information referenced in the subject line, Solicitation 70Z08526Q000171. A determination by the Government not to complete this proposed procurement based on the responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct competitive procurement. All interested parties who are responsible, certified, and capable may identify their interest and may submit an offer or quotation which shall be considered by the agency no later than 8:00 AM Pacific Time

{PST} on JAN 27, 2026, to Ms. Oneal at donna.j.oneal@uscg.mil

The interested parties bear full responsibility to ensure complete transmission and timely receipt.

Statement of Work: Boiler Technician Maintenance Level One and Level Two.

The Contractor shall provide a proposal for Off-Site Level One and Level Two Boiler Technician Training.  Contractor shall provide a proposal for instructor(s) led hands on training for USCGC HEALY Firetube Boilers and USCGC POLAR STAR Watertube boilers in a classroom and lab setting for up to (6) six students in 5 Days.  The proposal shall include all course instruction, course materials, and Examinations for Fire Tube Boilers and Water tube Boilers

References:  KEWANEE Firetube Boiler Model S9517-AY-MMC-010, Clever Brooks, Cyclo-Therm Boilers, Babcock Wilcox Water Tube Boilers.

Requirements: 

  • Classroom and hands-on Boiler Operator and Maintenance Training Level One and Two offsite in Louisville, KY
  • Training course materials, certification examinations and Flue Gas Analyzer equipment usage, Training Videos and various props for display pertaining to causes of failure of boilers.
  • Provide qualified instructor, all training materials, equipment, final exam, certifications, end of course surveys, and curriculum as listed below:

1.           Boilers – Knowledge in the operation, maintenance, repair, economics of basic systems including the use of steam, the energy source to produce the steam, the distinction between industrial and utility boilers, and a good concept of how steam is generated from a heat source other than combustion within a boiler.

a.   Steam Cycle – The Boiler Operator should know the Rankine Cycle, the effects of reheat cycles and regenerative feed water heating.

b.    Fuel/Energy Source –The Boiler Operator should know the types of fossil fuels used in a btu’s of each type of fuel used.

c.    Utility Boilers – The Boiler Operator should know that utility boilers are those plants that generally supply electricity to most of the United States.  These boilers are most often fired with coal but are also fired with fuel oil and gas.  Utility boilers have reheat cycles, and require very elaborate water treatment systems.

d.   Industrial Boilers –The Boiler Operator should know industrial boilers are most often used for process steam, such as heating, driving operating turbines, for fans or pumps, and other process work.

e.    Cogeneration –The Boiler Operator should know that cogeneration is a system in which fuel is used to produce energy and the heat from the fuel is then directed to be used by a boiler to conserve energy and achieve the maximum efficiency from the heat generated.

Boiler Design/Application, heat transfer, steam properties, control devices, furnace design, economic devices, firing equipment, and draft.

2.           Boiler Design/Application – The boiler operator should know: how the application affects the design, size, and type of boiler to be used.  Also, the types of heat transfer, how they differ, and where each takes place within the furnace.  The boiler operator must have an understanding of the relationship between steam pressure and temperature and how to control their parameters.  The boiler operator must have knowledge of the rules for construction of boilers, including material properties, accessories supplied, and heat source.  Knowledge is needed for plants that span the last fifty year or more.

a.   Boiler design/application – The boiler operator should know fire tube, vertical (submerged and nonsubmerged), horizontal, water tube, and cast iron type boiler construction.  The boiler operator should be able to describe the differences between package and site-erected boilers.  The boiler operator should be able to describe the differences between package and site-erected boilers.  The boiler operator must know the difference between a longitudinal weld joint and circumferential weld joint.  The operator should be able to describe the flow of gases through each type of boiler.

b.    Heat Transfer – The boiler operator must understand conduction, convection and radiation heat transfer.  The boiler operator should be able to describe the various types of fluid flow and how they affect heat transfer.  The density of steam versus boiler pressure, and the meaning of saturation temperature must be understood.

c.    Steam, properties and Control Devices – The boiler operator should know location and purpose of a dry pipe, cyclone steam separators, steam scrubber, or baffles.  The boiler operator should know the function, types, location, operation, start up, and efficiency of superheaters.  Have an understanding of the effects of carryover and how it is prevented, steam quality, and desuperheaters or attemperators.

d.    Furnace Design – The boiler operator should understand the reason(s) for having ash re-injection, furnace baffles, and water walls (water cooled furnace).  The boiler operator should have knowledge of soot blower operation, types and location. Refractory walls, slag, erosion and spalling, purpose of a water screen, flame impingement, clinkers, clinker cinders are topics with which the boiler operator should be familiar.

e.   Economic Devices – The boiler operator should know the construction location, types, and purpose of an economizer, air-preheaters, and thermocouples.

f.    Firing Equipment – The boiler operator should understand and be able to operate pulverized firing, chain grate firing, spreader stoker firing, and underfeed stoker firing.

g.   Draft – The boiler operator should understand balanced draft units, pressurized draft unit, primary air, secondary air, tertiary air.

Boilers – Construction; materials, support, types of stress, openings and fittings, heating surface and capacity.

3.           Boilers Construction – The boiler operator must be aware of the materials, design, and limits of those materials used in the equipment in their charge.  Stress the access for cleaning, inspection, and repairs, as well as the appliances attached to the boiler to ensure it does not exceed the limits of its design.  In addition, the operator must know the abilities and limits of the unit being operated to prevent failures of equipment that may result in injury or death.

a.   Materials – The boiler operator must have knowledge and understand limitations of materials used in boiler construction.  The boiler operator should have knowledge of proper operating procedure, which will help to prevent creep or graphitization.  Being able to specify the nondestructive examination method to be used to inspect the boiler is also part of the knowledge needed by the boiler operator.

b.   Openings and Fittings – The boiler operator should know the requirement for the minimum size of a manhole or hand hole opening.  In addition, he must able to list the purpose of other openings in the drum, and be able to identify the process of rolling tubes into a boiler.

c.    Heating Surface and Capacity – The boiler operator should know the definition of heating surface, and how twelve square feet of heating surface is related to Ohio law concerning licensed operators and engineers.  The operator must be able to convert evaporation rate to horsepower.

Combustion-fuels, control of the rate of combustion.

4.           Combustion – The boiler operator must be proficient in the techniques used to control fuel and air to a furnace, thus regulating the release of heat to the boiler.

a.   Fuels and their equipment – The boiler operator should know the combustion process, temperature required for combustion, atomization, and absolute pressure.

b.   Control of the rate of Combustion – The boiler operator should know how to control the supply air (oxygen) part of combustion, the condition or degree under which combustion takes place, flue gas analysis methods, the amount of air required to burn a pound of fuel, and tempering of fuel.

Combustion Equipment-specific types of equipment for each type of fuel including safety devices, monitoring and adjusting fuel burning equipment, and mechanical and draft.

5.           Combustion Equipment – The boiler operator must be familiar with the devices used to supply fuel to the furnace.  This includes using solid, gaseous, or liquid fuels; the protective devices, types of controls used, and understand the type or types of draft required for each fuel including units that operate on multiple fuels.

a.   Combustion Equipment – The boiler operator should know operation and maintenance of coal stokers, such as chain grate, spreader underfeed, and pulverize.  Must know oil fired burners, mechanical or pressure type, and the advantages and disadvantages of each.  In addition, operation and maintenance of gas-fired burners whether the supply is natural or man made.  The operator must be able to describe the method of disposing of ash and products of combustion, and know the physical requirements of the fuel system.

b.   Safety Devices – The boiler operator must be able to explain how to properly fire a boiler.  The boiler operator must be able to explain the importance of purging the furnace and of heating or pressurizing the fuel.  The operator must know what devices are to be installed in the fuel system to protect it.

c.   Monitoring the furnace – The boiler operator must be able to explain what can happen if the burner flame is not controlled properly.

d.    Draft – The boiler operator shall see to it that induced, over fire, and forced draft fans are operational, and must determine if a balanced draft on positive pressure furnace is distributing heat and gases as required to prevent failure in the furnace.

Boiler Indicators and Devices – to provide for operation, prevent over-pressure, determine water level, valves, piping blow down systems, and measuring devices.

6.          Boiler Indicators and Devices – The boiler operator must have knowledge of operation and maintenance relating to the devices that are provided to assist in determining and maintaining water level, steam pressure, isolating the boiler, and preventing over pressure of the boiler.  The devices shall be in the proper location, using recommended code installation practices.

a.   Safety Devices – the boiler operator shall know the operation, maintenance, location, purpose, and proper installation of a boiler water column, safety valve, blow down valve, heater/non return valve, steam gauge, fusible plug, and feed water regulator.

b.   Safety Valve – The boiler operator shall be able to properly test the safety valve of the boiler and know the minimum number of valves required for installation.  The boiler operator must know the requirements for; discharge piping, minimum blowback values, and the minimum capacity for safety valves.

c.   Boiler Water Level Devices – The boiler operator will know the proper procedure to determine the water level of the boiler, the location of the water column and the minimum size, strength, and type of pipe and fittings sued.

d.   Valves and their applications – For each appliance, the boiler operator will know the type of valve used in which order is used on feed water, blow down, steam header, water column, and all other connections to the boiler.

e.   Instrumentation – The boiler operator shall know how to use all measuring devices, insure that they are attached properly, and be able to perform test to prove their accuracy. These items may include; steam gauges, draft gages, water gauges, fuel, and temperature gauges.

Boiler Operation-abnormal operations, start up, shut down, efficiency, water supplies, idle boilers, maintenance, repairing, and evaluation of a boilers’ condition

7.           Operation and Maintenance – The boiler operator must show evidence that indicates the comprehension of the theory of the production of steam from boilers, during all phases of operation, maintenance, repairs, and inspection.

a.    Start Up and On-line Operation of Boilers – The boiler operator should understand the sequence of operation that lends up to on-line operation.  This includes any special considerations for new or newly repaired boilers.

b.   Combustion – The boiler operator should be able to monitor, analyze, and regulate the combustion process to operate in the most efficient and safe manner.

c.    Operational Problems – The boiler operator needs to be able to recognize problem areas immediately and control potentially un-safe operation. Abnormal operation, priming and carry over, tube failure, fires, inconsistent draft, and gauge glass breakage are some of the situations that an operator must, at all times, be ready to handle.

d.   Idle Boilers – The boiler operator should be able to care for idle boilers, know how to take a boiler out of service, and know how to place a boiler in wet or dry lay up.

e.   Boiler maintenance – The boiler operator should be able to; perform routine maintenance, schedule maintenance, prepare boilers for internal inspections, and external inspections, or repairs.  To obtain maximum efficiency in operation the boiler needs to be maintained on a regular schedule.

Pumps-type, applications, facts used in selecting, conditions for operating, and maintenance.

8.           Pumps – The boiler operator shall demonstrate knowledge indicating comprehension of the operation, maintenance, start-up and shut down of all types of pumps used throughout a powerhouse.

a.    Pumps- The boiler operator must be able to identify the types of pumps and the varied uses of pumps.  The operator must understand their capabilities and what can be expected of injectors, duplex pumps, power pumps, vacuum pumps, rotary pumps, and centrifugal pumps.

b.   Pump Operation – The boiler operator needs to be able to properly line up and bring pumps on line, regulate pump discharge and understand the performance characteristics of the pump.

c.   Pump Maintenance – The boiler operator needs to know when and how to care for each type of pump, must identify the required routine maintenance, and schedule maintenance, to maintain peak performance of all types of pumps.

Boiler Auxiliary Support Equipment – types and operations of feed water heaters, water system make up, condensate, polished systems, blow down systems, steam traps, separators, lubricator types and devices with their auxiliaries

9.           Boiler Auxiliary Support Equipment – The boiler operator shall demonstrate knowledge that indicates comprehension of the operation, maintenance, start-up and shut down of boiler auxiliary equipment used through out a powerhouse.  These items include pre-heating, water treatment, distribution of steam, return of condensate, and lubrication operations.

a.   Feedwater Control Heating Equipment – The boiler operator needs to know feed water heaters, closed and open, and deaerators.  The boiler operator must have a thorough understanding of preheating of feedwater and the differences of single element, two element and three element water level control, and which components provide these benefits.

b.    Boiler Water Treatment – The boiler operator needs to know water treatment. To maintain peak performance and limit down time, water quality is of great importance to safe operation.  The boiler operator must be able to analyze and chemically treat water for each condition.  The boiler operator must understand the affects of blowing down a boiler.

c.    Piping Systems for Steam and Condensate – The boiler operator needs to know piping systems design, material selection, flanges and fittings are topics with which the operator must be familiar.

d.   Steam Traps – The boiler operator needs to know the various designs and types of steam traps, separators, and strainers.  To gain the most efficiency from the steam, it is dried for use using separators.

e.   Lubrication – The boiler operator must understand classification and uses of lubricants and lubricating devices.  The applicant must know what provides the best protection and reduces friction, and the different methods of application.

Environment Control –types, technology, particulate control, equipment for specific controls, mechanical, bag filter, and precipator.

10.       Environmental Control – The boiler operator shall demonstrate knowledge that indicates comprehension of the operation, maintenance, start-up and shut down of environmental equipment and to comply with environmental responsibilities of the plants operation.

a.   Pollution Controls and Standards – The boiler operator needs to know the types of emissions, how they are monitored, and the operator must be able to differentiate one condition from another, and control the situation accordingly.

b.   Pollution Control Devices – The boiler operator needs to know how particulates are controlled, mechanical collectors, electrostatic precipitators, bag filter houses, how to control pollution by-products or stack gas emissions are topics with which the operator must be familiar.  The applicant needs to identify the different methods available and the principles of operation.

c.    Flue Gas Analysis – The boiler operators needs to know how to operate a flue gas analyzer provided by the instructor and know the situations required to correct fuel efficiency and combustion issues depending on atmospheric standards throughout various global latitudes.

Math formulas

11.       Math Formulas – Math from the text the boiler operator must know the formulas, as there will be no books, notes, and no programmable calculators allowed under NIULPE Engineered test.

a.      The internal design pressure of an existing boiler.

b.      Absolute pressure.

c.      Pounds of water to condense one pound of steam.

d.      Calculation of Boiler Horsepower.

Laws and Rules

12.        Laws and rules pertaining to the licensing of Stationary Boiler Operators, Boiler Operators and High Pressure Boiler Operators

a.      Horsepower by heating surface

b.      Licenses renewals

c.      License revocation and expiration

d.      Experience and schooling

e.      Display of license

f.      Requirements of boilers over thirty (30) horsepower by heating surface.

Period of Performance: Contractor shall complete the training course in Louisville, KY at Ware Boiler University Facility from the 27th of April until the 1st of May 2026

Place of performance:

WARE Boiler University

4200 Produce Road

Louisville, KY, USA

40218

LOCAL POC: Jude Wolf

800-228-8861

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (2)

  • NOTICE OF INTENT TO SOLE SOURCE 70Z08526Q000171.pdf

    139 KBAdded in Special Notice version 3Posted
    Download
  • SOW -Boiler Operator Course.doc

    52 KBAdded in Special Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Special NoticeArchivedCurrent

    USCGC HEALY BOILER TECHNICIAN TRAINING

    Notice 7368a8994dec47abbd9a1cd4ef499514 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this sources sought is to determine interest and capability of potential businesses. The Government may use responses to this sources sought synopsis to make an appropriate acquisition decision for this project. The U.S. Coast Guard Surface Forces Logistics Center is conducting market research for potential qualified contractors for the maintenance and support of the systems and equipment pertaining to the Integrated Propulsion Plant on Coast Guard Cutter (CGC) HEALY from 20JULY2028 – 21JULY2033. GE Power, Power Conversion a Part of GE Vernova (GE) is the original equipment manufacturer (OEM) of the Integrated Propulsion Plant on CGC HEALY and holds the proprietary data rights to provide the required repair and support. The previous contract was awarded sole source to GE under contract number 70Z08523DLREP0003. This work requires that the Contractor provide all management, supervision, personnel, labor, materials and equipment (except for Government furnished property) required to maintain and support the integrated machinery plant systems/components on CGC HEALY and Government owned shoreside equipment that is used in support of CGC HEALY. Support includes, but is not limited to, periodic equipment maintenance, technical representative visits, telephone consultations, remote technical support, hardware and software configuration management services, conditional technical support, upgrades, and periodic equipment training. A draft of the current awarded performance work statement is provided for information only. This work includes, but is not limited to, the following: Periodic system maintenance and equipment grooms. This includes annual shipboard depot level maintenance and shoreside spare depot level maintenance at CG Inventory Control Point (ICPs) and Contractor’s facilities, inspection, and operational testing of all systems and equipment related to the Integrated Power Plant. Technical Support. This includes immediate access to 24/7 technical support while the Cutter is underway and during port calls while on mission. Conditional technical support for troubleshooting and repairs. This includes casualty response and repairs, as well as engineering analysis and repairs identified as necessary during equipment grooms. Configuration management services. This includes obsolescence evaluation and prediction of out-year reliability, maintainability, and fitness of service availability concerns five years beyond the contract. Crew training. This includes hands-on and classroom training for operators and maintainers both attached to HEALY as permanent party crew and CG shore support personnel. Technical refresh and replacement of obsolete subcomponents to meet current industry supportability standards. This includes design, validation, and installation of specific system subcomponents to ensure operational availability and maintenance support through the midlife maintenance period. The CGC HEALY is homeported in Seattle, WA at 1519 Alaskan Way S., Seattle, WA 98134. The CGC HEALY, the Coast Guard's largest vessel, is 420 feet long, 82 feet wide, drafts 31 feet (at full load), and weighs 16,660 long tons (at full load). NAICS Code for this requirement: 336611 – Ship Building and Repairing FSC Code for this requirement: J999 – Non-Nuclear Ship Repair (West) Size Standard: 1,300 Employees Please note that the period maintenance being performed will occur during planned dry dock and dockside availabilities, at which time other substantial depot-level maintenance will be accomplished. No cost or pricing data is required. All responsible sources may submit a capability statement, which will be considered by the agency. If interested and capable of performing the work please respond to the attached questionnaire returning it via email to Contract Specialist Sherri Ore at Sherri.S.Ore@uscg.mil and Contracting Officer, Amy Kelm, at Amy.A.Kelm@uscg.mil. Please insert - Sources Sought Response to 70ZU027ILREP1113 in the subject line.
54%
Market Research11/29/2026
The U.S. Coast Guard is looking for sources which would be interested in performing In Service Vehicle Sustainment (ISVS) and planned maintenance repairs for Coast Guard Cutter (CGC) HEALY. The performance period for the first period of this upcoming requirement is tentatively projected to be 1 November 2027 – 30 April 2028; second period 1 November 2028 – 30 April 2029; third period 1 November 2029 – 30 April 2030; fourth period 1 November 2030 – 30 April 2031. It is anticipated that requests for proposals would tentatively be issued around 2 April 2027 and the contract would be awarded around 15 October 2027. Coast Guard Cutter HEALY is a medium polar icebreaker, homeported in Seattle, WA. The vessel is about 420 feet long with an 82-foot beam. Attached is the draft list of work items. All repairs would take place at the vendor facility and/or the cutter’s homeport depending on the ultimate structure of the contract. The Coast Guard intends to award a multiple or single award multi-year IDIQ contract to include recurring maintenance and possible non-recurring maintenance (engineering changes in development) onboard CGC Healy, with the desire to complete all maintenance under the same contract; this includes maintenance requiring a drydock availability and maintenance that can be accomplished pier side. The Coast Guard anticipates one dry dock availability every three years, and one dockside availability each year in between. The Coast Guard requests industry input on the viability of such a contract. Companies which would be interested in submitting a proposal for this requirement should reply to this sources sought notice noting their business size/status such as large business, small business, HUBZone, Service-Disabled Veteran-owned, Women Owned Small Business etc.…. Further if there are no past performance evaluations on file in the Past Performance Information System Retrieval database, contractors should provide a couple past performance references including the following information: contract numbers, project titles, dollar amounts, points of contact and telephone numbers. Also please provide your company input on meeting this requirement through a multiple or single award multi-year IDIQ contract, to include recurring maintenance and possible non-recurring maintenance (engineering changes in development) onboard CGC Healy, with the desire to complete all maintenance under the same contract; this includes maintenance requiring a drydock availability and maintenance that can be accomplished pier side. The Coast Guard anticipates one dry dock availability every three years, and one dockside availability each year in between. Replies should be sent by 29 October 2026, 2:30 pm Pacific Time to: Andrew Jacobs, Contracting Officer at andrew.g.jacobs@uscg.mil and LCDR Ryan T Ostrander at ryan.t.ostrander@uscg.mil. Shortly after receiving responses the Coast Guard will determine if this requirement will be set aside or unrestricted. After the determination a request for proposal will be posted on www.sam.gov. The NAICS Code is 336611. The small business size standard is less than 1300 employees. Contractors are reminded that in the case of a HUB Zone set-aside, FAR 52.219-3, "Notice of HUBZone Set-Aside or Sole Source Award" would apply which requires that at least 50 percent of the cost of personnel for contract performance be spent for employees of the concern or employees of other HUBZone small businesses. Contractors are also reminded that in the case of a Service-Disabled Veteran-Owned Small Business Set-Aside, FAR 52.219-27, "Notice of Set-Aside for, Service-Disabled Veteran-Owned Small Business…” would apply which requires that at least 50 percent of the cost of personnel for contract performance be spent for employees of the concern or employees of other service-disabled veteran owned small businesses. Additionally, regarding FAR 52.219-30 "Notice of Set A-Side for Women-Owned Small Business Concerns…": A women-owned small business (WOSB) concern eligible under the WOSB Program, means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States.
49%
Market Research10/29/2026
Amendment 0006: Amendment provides clarification regarding contractor pier power. One 480 VAC, 400A Viking electrical plug-in will be available on the same pier as the vessel, adjacent to the contractor equipment laydown area. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0005: This amendment provides responses to offeror questions concerning Work Items D-008 and D-021. The amendment corrects the drawing reference in D-008, Paragraph 3.2.3, to CG Drawing 418A-WMSL-801-1 and clarifies the Government-furnished equipment applicable to D-021. All other terms and conditions of the solicitation remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0004: provides the Government’s responses to additional offeror questions regarding drawings and technical requirements associated with Work Items D-016, D-009, and D-008. The amendment also extends the solicitation closing date and time to October 5, 2026, at 1400 Pacific Time (PT); all other terms and conditions remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0003: provides the Government’s response to an offeror question regarding the correct compartment identification for the MPAC work under Work Item D-018. The amendment clarifies that MPAC #1 is located in the FMMR Upper Level and that paragraph 1.1 identifies the correct work locations. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0002: Adds a clarifying note regarding the Attachment 2 Specification posted in Amendment 0001 & extends the no later than due date for receipt of quotes from 22 September 2026 to 29 September 2026 at 10:00 am Pacific Time. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0001: Replaces the Attachment 1 Price Schedule as well as the Attachment 2 Specification. The Attachment 2 Specification originally posted was for a previous/different project regarding the cutter. The Attachment 2 Specification which is part of Amendment 0001 is an entirely different specification and therefore specifies no revisions on the Revisions page iii. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Coast Guard Cutter MIDGETT fiscal quater 2, fiscal year 2027 dockside repair. The period of performance is 2 February - 8 May 2027.
46%
Combined Synopsis10/05/2026
USCGC Joseph Tezanos DD FY27
45%
Solicitation12/07/2026
45%
AwardedOpen

Additional Details

Solicitation Number

70Z08526Q000171

Archive Date

Feb 11, 2026

Office Address

ALAMEDA, CA, 94501