GovChime
Notice ID: 17e13082fc194b85b97fb9094a9e00b9Combined Synopsis/SolicitationArchived

USCGC Stone AC condenser re-tube

Archived on April 14, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 AM EDT
Posted
March 24, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
336611: Ship Building and Repairing
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
SFLC PROCUREMENT BRANCH 2(00085)
Place of performance
North Charleston, South Carolina, 29405
PSC
J020: MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z08526Q00023878
Notice ID
17e13082fc194b85b97fb9094a9e00b9

Description

General Requirements

USCGC STONE is currently experiencing a failure of the B side condenser on the #1 A/C skid. The condenser failed causing saltwater intrusion through the entire B side of the system. The condenser provides vital redundancy to the cooling system for electronics support equipment critical to the operation of their mission.

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.3 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified.

3.4 Period of Performance. The period of performance for this requirement starts on 31 MAR 2026 and ends on 13 APR 2026.

3.5 Location. Condenser is currently located at USCG base in North Charleston, SC. The contractor may perform the required work at their repair facilities, if the facility is within 1000 miles of the CG base. The CG will ship the condenser to the contractor’s facility. Contractor is responsible for returning condenser to the following address. USCGC STONE, 1050 Register St, North Charleston SC 29405.

3.6 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work.

3.7 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following:

3.7.1 SFLC-LREPL Asset Manager, LTJG Justin Waters, Justin.l.waters@uscg.mil

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • S25_082_51400_ACCndnsrRpr_758.pdf

    159 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    USCGC Stone AC condenser re-tube

    Notice 17e13082fc194b85b97fb9094a9e00b9 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

70Z08526Q00023878

Archive Date

Apr 14, 2026

Office Address

ALAMEDA, CA, 94501