USCGC Kimball AC Overhaul
Archived on February 19, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 8:00 AM PST
- Posted
- January 20, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 336611: Ship Building and Repairing
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- SFLC PROCUREMENT BRANCH 2(00085)
- Place of performance
- Honolulu, Hawaii, 96819
- PSC
- J020: MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 70Z08526Q0002547
- Notice ID
- d8e971dc92464c32b252ff2e86ee7ef3
Description
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs
performed by commercial contractors at Coast Guard Base Honolulu aboard Coast Guard Cutter Kimball.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,
General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,
Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in
this item, as applicable, during the performance of this availability. The requirements of this WI applies to
all work under the scope of this contract, whether explicitly stated in all following work items or not, and
to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and
equipment.
3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and
NDE in accordance with SFLC Std Spec 0740.
3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with
paragraph 3.1 of SFLC Standard Spec 5550
3.5 Period of Performance. 16FEB2026 to 06MAR2026
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (1)
- Download
KIMBALL AC Overhaul SOW.pdf
263 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
USCGC Kimball AC Overhaul
Similar Opportunities
Additional Details
Solicitation Number
70Z08526Q0002547
Archive Date
Feb 19, 2026
Office Address
ALAMEDA, CA, 94501