GovChime
Notice ID: d8e971dc92464c32b252ff2e86ee7ef3Combined Synopsis/SolicitationArchived

USCGC Kimball AC Overhaul

Archived on February 19, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 AM PST
Posted
January 20, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
336611: Ship Building and Repairing
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
SFLC PROCUREMENT BRANCH 2(00085)
Place of performance
Honolulu, Hawaii, 96819
PSC
J020: MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z08526Q0002547
Notice ID
d8e971dc92464c32b252ff2e86ee7ef3

Description

General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs
performed by commercial contractors at Coast Guard Base Honolulu aboard Coast Guard Cutter Kimball.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,
General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,
Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in
this item, as applicable, during the performance of this availability. The requirements of this WI applies to
all work under the scope of this contract, whether explicitly stated in all following work items or not, and
to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and
equipment.
3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and
NDE in accordance with SFLC Std Spec 0740.
3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with
paragraph 3.1 of SFLC Standard Spec 5550
3.5 Period of Performance. 16FEB2026 to 06MAR2026

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • KIMBALL AC Overhaul SOW.pdf

    263 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    USCGC Kimball AC Overhaul

    Notice d8e971dc92464c32b252ff2e86ee7ef3 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

70Z08526Q0002547

Archive Date

Feb 19, 2026

Office Address

ALAMEDA, CA, 94501