GovChime
Notice ID: a622a4cc8f4d49a9a82fd98a1cd6cdd7Solicitation

PUMP UNIT CTFGL

Archived on July 4, 2026. Solicitation posted by HOMELAND SECURITY, DEPARTMENT OF (US COAST GUARD) on June 5, 2026. Solicitation 70Z08526Q40144B00.

NAICS 333914 (Measuring, Dispensing, and Other Pumping Equipment Manufacturing). Set-aside: Total Small Business Set-Aside (FAR 19.5). Place of performance: Curtis Bay, Maryland. Original response deadline: . Full description on SAM.gov.

Description

Combined Synopsis/Solicitation for Commercial Items

(i) This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.

(ii) The Request for Quote (RFQ) number 70Z08526Q40144B00 applies and is used as the solicitation number. This solicitation document and the incorporated provisions and clauses are those in effect through [Insert Federal Acquisition Circular and effective date].

(iii) It is anticipated that a competitive, firm-fixed-price purchase order will be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which, if timely received, shall be considered by this agency. Vendors must have an active registration in SAM.gov prior to award.

(iv) Payments will be made Net 30 in accordance with FAR 52.232-25, Prompt Payment.

(v) All acquisitions expected to exceed [Insert Dollar Threshold] can also be found on SAM.GOV under the same solicitation number listed above.

(vi)  The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order.

(vii) The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items:

Quotation Submission Requirements

Vendor shall provide the following information:

Information Required

Vendor Submission

VENDOR NAME

VENDOR ADDRESS

VENDOR SAM.GOV UEI

VENDOR CAGE CODE

VENDOR PHONE

VENDOR EMAIL

POINT OF CONTACT

This is a Brand Name Only solicitation. No substitutions will be authorized. Interested vendors must be an authorized distributor for the requested material and are required to provide an authorized distributor letter from the Original Equipment Manufacturer (OEM) with their quotation.

For all inquiries, please contact:
POC: [Insert POC Name]
Email: Michael.P.Mooney1@uscg.mil

Line-Item Details

LINE ITEM 1


 

NSN:

4320 01-164-4947

DESCRIPTION:

PUMP UNIT CTFGL

MFG NAME:

[Insert Manufacturer Name]

PART NBR:

3040K010

QUANTITY:

3 EA

UNIT PRICE:

$____________________

TOTAL PRICE (Shipping Included):

$____________________

DESCRIPTIVE DATA:
[Insert descriptive data, drawings, or Statement of Work as applicable.]

PACKAGING AND MARKING REQUIREMENTS:


PUMP WITH CLOSED COUPLED 3 HP MOTOR,230/460 VAC, 3 PHASE, 3450 RPM, FRME J145JM, ALL BRONZE PUMP. NHA: AIR CONDITIONING UNIT - 30 TON.

INDIVIDUAL PACKAGE EACH IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, CUSHIONING MATERIALS, DUNNAGE, BLOCKING AND BRACING SHALL BE APPLIED AS REQUIRED TO PROTECT THE ITEMS AND THE ENCLOSED MEDIA AND RESTRICT THE MOVEMENT OF THE ITEM WITHIN THE CONTAINER.

PACKAGE LABEL:

ITEM NAME:

PART NUMBER:

NSN:

QNTY: (EXAMPLE 1 EA)

COND-A

CONTRACT NUMBER / ORDER NUMBER

**EACH PACKAGE IS TO BE MARKED IAW MIL-STD-129R AND BAR CODED IAW ISO/IEC-16388-

2007, CODE 39 SYMBOLOGY.

Delivery Information


 

REQUIRED DELIVERY DATE:

[Insert Date]

ALTERNATE DELIVERY DATE:

If you are unable to meet the required date, please provide your earliest date: _______

  • Total cost must include all delivery and freight charges.
  • SHIPPING TERMS: FOB Destination is required.

SHIP TO ADDRESS:
[Insert Full Ship-To Address, including building, receiving room, city, state, and zip code]

Preparation for Delivery & Invoicing

Preparation for Delivery
All material must be shipped to the address specified above and be accompanied by an itemized packing list securely attached to the outside of the shipment, citing the Purchase Order Number. Material shall be packed to afford adequate protection against corrosion, deterioration, and physical damage during shipment and for warehouse storage. Deliveries are accepted [Insert Delivery Days, e.g., Monday through Friday] between the hours of [Insert Delivery Hours, e.g., 0800 to 1500].

U.S. Government Approved Label Requirements:

  • National Stock Number (NSN)
  • Item Name
  • Part Number
  • Purchase Order Number
  • Condition Code (e.g., Condition A)
  • Quantity and Unit of Issue

Invoicing in Invoice Processing Platform (IPP)
All invoices must be submitted for payment through the IPP at https://www.ipp.gov. Invoices must contain the contract number, invoice number, vendor UEI, TIN, CAGE code, line item numbers, description of supplies, unit prices, and extended totals. For assistance with IPP, please contact IPP Customer Support at (866) 973-3131 or IPPCustomerSupport@fiscal.treasury.gov.

Full description on SAM.gov

Overview

Agency:
Department of Homeland SecurityUS COAST GUARD
Office:SFLC PROCUREMENT BRANCH 2(00085)
Posted:June 5, 2026
NAICS:333914: Measuring, Dispensing, and Other Pumping Equipment Manufacturing
Last Updated:Aug 21, 2026
PSC:4320: POWER AND HAND PUMPS
Response Deadline:
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Solicitation
Place of Performance:Curtis Bay, Maryland, 21226

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 2 of 2 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationUS COAST GUARDJun 5, 202642.22 KB
SolicitationUS COAST GUARDJun 5, 202686.95 KB

Lifecycle

Solicitation:70Z08526Q40144B00
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. SolicitationCurrentJun 5, 2026

    PUMP UNIT CTFGL

    Notice a622a4cc8f4d49a9a82fd98a1cd6cdd7 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
This is a Brand Name Only solicitation. No substitutions will be authorized. Interested vendors must be an authorized distributor for the requested material and are required to provide an authorized distributor letter from the Original Equipment Manufacturer (OEM) with their quotation. For all inquiries FOR EQUIPMENT AND PACKAGING, please contact: POC: BRADY MYERS E-MAIL: BRADY.A.MYERS@USCG.MIL 571-613-3388 Line Item Details LINE ITEM 1 NSN: 3040 01-F12-2745 [5340 01-126-4569] DESCRIPTION: APPLETON JIB CYLINDER [STRAP, RETAINING] MFG NAME: APPLETON MARINE INC [EVOQUA WATER TECHNOLOGIES CORP.] PART NBR: YMD-9526 [37073B] ALT PART # W3T105142 QUANTITY: 03 [14] EA UNIT PRICE: $____________________ LINE ITEM 2 NSN: [3040 01-F12-2743 ] DESCRIPTION: [LUFF CYLINDER] MFG NAME: APPLETON MARINE INC PART NBR: [YMD-9525] QUANTITY: [04] EA UNIT PRICE: $____________________ LINE ITEM 3 NSN: [3020 01-F12-2750] DESCRIPTION: [SHEAVE, APPLETON] MFG NAME: APPLETON MARINE INC PART NBR: [YMD-4501] QUANTITY: [10] EA UNIT PRICE: $____________________ TOTAL PRICE (Shipping Included): $____________________ DESCRIPTIVE DATA: Item 1- [JIB CYLINDER FOR 75 WLR. INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073- L E METHOD 10, UTILIZING CUSHIONING, BLOCKING AND BRACING INSIDE A TYPE V, STYLE B COVERED CRATE WITH LAG BOLTS CONFORMING TO ASTM D6039. MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY.] Item 2- LUFFING CYLINDER APPLETON CRANE 7" BORE 3.5" ROD 48" STROKE PACKAGE EACH INDIVIDUALLY IAW MIL-STD-2073-1E METHOD 10 AS DESCRIBED BELOW: INDIVIDUAL PACKAGE EACH IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, IN A WOODEN CRATE, WITH CUSHIONING MATERIALS, DUNNAGE, BLOCKING AND BRACING SHALL BE APPLIED AS REQUIRED TO PROTECT THE ITEMS AND THE ENCLOSED MEDIA AND RESTRICT THE MOVEMENT OF THE ITEM WITHIN THE CONTAINER. EACH PACKAGE IS TO BE MARKED IAW MIL-STD-129R AND BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. Item 3- EACH SHEAVE SHALL BE INDIVIDUALLY PACKED AND MARKED IN ITS OWN ASTM D5118 FIBERBOARD BOX. MARK IN ACCORDANCE WITH MIL-STD-129R, BAR CODE IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. EACH PACKAGE IS TO BE MARKED IAW MIL-STD-129R AND BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY.. PACKAGING AND MARKING REQUIREMENTS: [MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. PACKAGE LABEL: ITEM NAME: PART NUMBER: NSN: QNTY: (EXAMPLE 1 EA) COND-A CONTRACT NUMBER / ORDER NUMBER.] Delivery Information REQUIRED DELIVERY DATE: [09/30/26] ALTERNATE DELIVERY DATE: If you are unable to meet the required date, please provide your earliest date: _______ Total cost must include all delivery and freight charges. SHIPPING TERMS: FOB Destination is required. SHIP TO ADDRESS: [ USCG SURFACE FORCES LOGISTICS CENTER 2401 HAWKINS POINT ROAD RECEIVING ROOM- BUILDING 88 BALTIMORE, MD 21226 ] Preparation for Delivery & Invoicing Preparation for Delivery All material must be shipped to the address specified above and be accompanied by an itemized packing list securely attached to the outside of the shipment, citing the Purchase Order Number. Material shall be packed to afford adequate protection against corrosion, deterioration, and physical damage during shipment and for warehouse storage. Deliveries are accepted [Monday through Friday] between the hours of [0800 to 1500]. Please read attachments
Solicitation333995Total Small Business Set-Aside07/21/202607/26/2027Curtis Bay, MD
This is a Brand Name Only solicitation. No substitutions will be authorized. Interested vendors must be an authorized distributor for the requested material and are required to provide an authorized distributor letter from the Original Equipment Manufacturer (OEM) with their quotation. For all inquiries FOR EQUIPMENT AND PACKAGING, please contact: POC: BRADY MYERS E-MAIL: BRADY.A.MYERS@USCG.MIL 571-613-3388 Line Item Details LINE ITEM 1 NSN: 3040 01-F12-2745 [5340 01-126-4569] DESCRIPTION: APPLETON JIB CYLINDER [STRAP, RETAINING] MFG NAME: APPLETON MARINE INC [EVOQUA WATER TECHNOLOGIES CORP.] PART NBR: YMD-9526 [37073B] ALT PART # W3T105142 QUANTITY: 03 [14] EA UNIT PRICE: $____________________ LINE ITEM 2 NSN: [3040 01-F12-2743 ] DESCRIPTION: [LUFF CYLINDER] MFG NAME: APPLETON MARINE INC PART NBR: [YMD-9525] QUANTITY: [04] EA UNIT PRICE: $____________________ LINE ITEM 3 NSN: [3020 01-F12-2750] DESCRIPTION: [SHEAVE, APPLETON] MFG NAME: APPLETON MARINE INC PART NBR: [YMD-4501] QUANTITY: [10] EA UNIT PRICE: $____________________ TOTAL PRICE (Shipping Included): $____________________ DESCRIPTIVE DATA: Item 1- [JIB CYLINDER FOR 75 WLR. INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073- L E METHOD 10, UTILIZING CUSHIONING, BLOCKING AND BRACING INSIDE A TYPE V, STYLE B COVERED CRATE WITH LAG BOLTS CONFORMING TO ASTM D6039. MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY.] Item 2- LUFFING CYLINDER APPLETON CRANE 7" BORE 3.5" ROD 48" STROKE PACKAGE EACH INDIVIDUALLY IAW MIL-STD-2073-1E METHOD 10 AS DESCRIBED BELOW: INDIVIDUAL PACKAGE EACH IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, IN A WOODEN CRATE, WITH CUSHIONING MATERIALS, DUNNAGE, BLOCKING AND BRACING SHALL BE APPLIED AS REQUIRED TO PROTECT THE ITEMS AND THE ENCLOSED MEDIA AND RESTRICT THE MOVEMENT OF THE ITEM WITHIN THE CONTAINER. EACH PACKAGE IS TO BE MARKED IAW MIL-STD-129R AND BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. Item 3- EACH SHEAVE SHALL BE INDIVIDUALLY PACKED AND MARKED IN ITS OWN ASTM D5118 FIBERBOARD BOX. MARK IN ACCORDANCE WITH MIL-STD-129R, BAR CODE IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. EACH PACKAGE IS TO BE MARKED IAW MIL-STD-129R AND BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY.. PACKAGING AND MARKING REQUIREMENTS: [MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. PACKAGE LABEL: ITEM NAME: PART NUMBER: NSN: QNTY: (EXAMPLE 1 EA) COND-A CONTRACT NUMBER / ORDER NUMBER.] Delivery Information REQUIRED DELIVERY DATE: [09/30/26] ALTERNATE DELIVERY DATE: If you are unable to meet the required date, please provide your earliest date: _______ Total cost must include all delivery and freight charges. SHIPPING TERMS: FOB Destination is required. SHIP TO ADDRESS: [ USCG SURFACE FORCES LOGISTICS CENTER 2401 HAWKINS POINT ROAD RECEIVING ROOM- BUILDING 88 BALTIMORE, MD 21226 ] Preparation for Delivery & Invoicing Preparation for Delivery All material must be shipped to the address specified above and be accompanied by an itemized packing list securely attached to the outside of the shipment, citing the Purchase Order Number. Material shall be packed to afford adequate protection against corrosion, deterioration, and physical damage during shipment and for warehouse storage. Deliveries are accepted [Monday through Friday] between the hours of [0800 to 1500]. Please read attachments
Solicitation333995Total Small Business Set-Aside07/21/202607/07/2027Curtis Bay, MD
The U.S. Army Corps of Engineers, Wilmington District is requesting two new pumps for the sump at John H. Kerr Powerhouse, two new pumps for the John H. Kerr Powerhouse dam sump, and three pumps for the sump at Philpott Powerhouse. The intent is to replace the existing pumps with pumps that perform in the same way as the existing pumps meeting the specifications within the attached Statement of Work. The resulting award issued from this request will result in one award.
Solicitation333914Total Small Business Set-Aside10/01/202610/13/2026Boydton, VA
The U.S. Army Corps of Engineers, Wilmington District is requesting two new pumps for the sump at John H. Kerr Powerhouse, two new pumps for the John H. Kerr Powerhouse dam sump, and three pumps for the sump at Philpott Powerhouse. The intent is to replace the existing pumps with pumps that perform in the same way as the existing pumps meeting the specifications within the attached Statement of Work. The resulting award issued from this request will result in one award.
Solicitation333914Total Small Business Set-Aside09/17/202610/02/2026Boydton, VA
** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference: CDRL(s) A010, A011, A012 Question(s) 1. Is there a need for QTY (3) paper copies to be delivered at each of the 30%, 70%, and 100% completion stages of developing the Technical Manual? No, PDF copies delivered electronically are more than sufficient for PTM reviews. CDRL A014 Question(s) 1. Is there a reason that TM Quality Assurance Plan is included in this solicitation but not for larger contracts for an item manufactured to the same MIL-PRF-53051D? The TM Quality Assurance Plan should be included in all solicitation for this type of effort. The purpose of it is to ensure the contractor has some kind of process in place for TM Quality. See the attached document for reference (see Attachments section). 2. CD-ROMs went essentially obsolete in 2015. Is there a different method of delivery that the U.S. Government is amenable to? The Government still requires CD-ROMs to have a physical media record of the TMs. Packaging - Attachment 15 Question(s) 1. Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere? 2. Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D? The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I’m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump. If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173. 3. As far as the packaging preservative goes, these systems are painted with Chemical Agent Resistant Coating (CARC) which has anti-corrosive properties already in it as called out in MIL-PRF-53051D which is the MIL-PRF that these systems are manufactured too. Additionally, they are required based on the solicitation to be delivered in heat treated wooden crates. Is the packaging team stating that the preservative needs to be applied to the wooden crate or the exterior of the unit? The internals of the pump system are already cast aluminum and stainless steel which are inherently corrosion resistant.” I’m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn’t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer. As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract. *** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 *** *** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****
Solicitation333914Total Small Business Set-Aside09/14/202610/16/2026-

Additional Details

Solicitation Number

70Z08526Q40144B00

Archive Date

Jul 4, 2026

Office Address

ALAMEDA, CA, 94501