Notice ID: cd3aaa7b8be145c6beee8beaefbe0f7cCombined Synopsis/Solicitation
CGC MIDGETT - Dual Point Biennial Maintenance
Archived on March 6, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 8:00 AM UTC−08:00
- Posted
- February 28, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 336611: Ship Building and Repairing
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- SFLC PROCUREMENT BRANCH 2(00085)
- Place of performance
- Honolulu, HI, 96819
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 70Z085Q11258
- Notice ID
- cd3aaa7b8be145c6beee8beaefbe0f7c
Description
General Requirements? SCOPE???? Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.???? REFERENCES???? COAST GUARD DRAWINGS??? Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements? Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans? Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)? Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)? Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)?? COAST GUARD PUBLICATIONS??? Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements? Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test? Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation? Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures? Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)?? OTHER REFERENCES??? National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code? ?? ???????? 3. REQUIREMENTS??? 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.??? ? 3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.???? ? 3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.??? ? 3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.???? 58300_RTK_1023_418 Dual Point Davit, Biennial Maintenance, Perform 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1. TABLE 1 DUAL POINT DAVIT NAMEPLATE DATA description LOCATION davit total gross weight Allied Systems Dual Point Davit with Control Console Models: DDP11000CTS & SP2200 Weather Deck, STBD Side, Frame 47 29,000 lbs 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y CB-OTH Mark IV (Coast Guard Drawing 26B-CB-IV-801-001) N/A 1 ea. N/A Y Hook Model APR-356-CBH 2 ea. 5000.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan COAST GUARD PUBLICATIONS Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757) Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750) Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2348) (Hull 754) Coast Guard Technical Publication (TP) 9899 SWBS 583, Apr 2021, Marine Crane Models DDP11000CTS & SP2200 (S/N: 2366) (Hull 755) Coast Guard Technical Publication (TP) 9900, SWBS 583, Apr 2021, Marine Crane Models DDP11000CTS & SP2200 S/N 2382 (Hull 756) Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011 International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2) 3.2.1 Hook certification. 3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site: Advise on manufacturer's proprietary system information. Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable. 3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r sum . 3.1.2.2 Submit the name and r sum of the Tech Rep to the COR at the Arrival Conference. 3.1.2.3 Point of contact: Heath Munger Heath.munger@alliedsystems.com Allied Systems Company (503) 825-3366 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000. 3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables Capstan NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2. TABLE 2 LIST OF PARTS QUANTITY PART NUMBER DESCRIPTION SOURCE OF SUPPLY 1 593533 Kit, Element Replacement Allied System Co. 214 S.W. Oregon Street, Sherwood OR 97140 1 593532 Kit, Element Replacement 2 70196 Return Filters 2 74130 Seal Kits 2 71975 Filter Breather 1 71754 Tank Cover Gasket 2 71042 Wire Rope 2 73441 Hub 3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable. TABLE 3 Recurring Maintenance task ADDITION REQUIREMENTS # TASK TYPE QTY COMPONENT OR ASSEMBLY APPENDIX AND PARA. FROM SFLC STD 5000 OTHER 1 Operate and Inspect 1 Dual Point Davit System 3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements) Submit CIR. 2 Service and Inspect 1 Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators. 3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers) Submit CFR. 3 Disassemble and Inspect 2 Power Sheave Assembly 3.2.3 (Disassemble and Inspect) Renew the hub with CFE. If hubs are not available, clean, inspect, and reinstall hubs. 4 Hydraulic Lube Oil Analysis 1 Hydraulic System C2.1.3.1 Submit a CIR. 5 Renew 2 Wire Rope Assembly (Allied System Part No. 71042) D2.2 (Wire rope assemblies) Wire rope particulars: Nominal diameter: 5/8 inch Minimum Breaking Strength: 56,040 lbs. Total length of each wire rope required: 110 ft. End fitting type: Fiege. Submit a CFR. 6 NDE 1 Dual Point Davit System 3.2.5 (NDE) Areas to NDE: all weld joints and boom and turret structures. Submit a CFR. 7 Groom and Lubricate 1 Dual Point Davit System 3.2.6 (Groom and Lubricate) 8 Weight Test 1 Dual Point Davit System B2.7.2 (Dual Point Davits) B2.7.2.1 No-load Operational Test B2.7.2.2 Static Load Test B2.7.2.3 Winch/Brake/Modified static load Test B2.7.2.4 Dynamic Load Test B2.7.2.5 Rated Load test Test weight particulars: Working Load Limit (11,000 lb.). "Modified static / brake" test load: 16,500 pounds (150% of WLL) Modified Dynamic Test Load: 12,650 pounds (115% of WLL) 9 Electric Motors 1 Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR. 10 Fabricate and Install 1 Label plate B2.9 (Label Plates) 11 Partially Preserve 1 Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces) 3.2.4 (Partial Preservation) 12 Service and Inspect? 1? Control Panel? 3.2.2 (Service and Inspect)? Verify all mechanical and electrical signals to the control panel. Submit a CFR.? 3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired. 3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR. 3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000. TABLE 4 - SPECIAL REQUIREMENTS Component Appendix & Paragraph in sflc std spec 5000 Fluids C2.1 Hose assemblies C2.2 Piping and tubing C2.3 Valves and manifolds C2.4 Gages C2.5 Gas charged accumulators C2.6 Heat exchangers and fluid coolers C2.7 Systems C2.8 Fastener assemblies D2.1 Wire rope assemblies D2.2 Brakes and clutches D2.3 Open gearing and gear reducers D2.4 NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR. 3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310. NOTE Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep. 3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR. 4. NOTES FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE General Requirements? SCOPE???? Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.???? REFERENCES???? COAST GUARD DRAWINGS??? Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements? Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans? Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)? Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)? Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)?? COAST GUARD PUBLICATIONS??? Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements? Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test? Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation? Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures? Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)?? OTHER REFERENCES??? National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code? ?? ???????? 3. REQUIREMENTS??? 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.??? ? 3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.???? ? 3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.??? ? 3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.???? 58300_RTK_1023_418 Dual Point Davit, Biennial Maintenance, Perform 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1. TABLE 1 DUAL POINT DAVIT NAMEPLATE DATA description LOCATION davit total gross weight Allied Systems Dual Point Davit with Control Console Models: DDP11000CTS & SP2200 Weather Deck, STBD Side, Frame 47 29,000 lbs 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y CB-OTH Mark IV (Coast Guard Drawing 26B-CB-IV-801-001) N/A 1 ea. N/A Y Hook Model APR-356-CBH 2 ea. 5000.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan COAST GUARD PUBLICATIONS Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757) Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750) Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2348) (Hull 754) Coast Guard Technical Publication (TP) 9899 SWBS 583, Apr 2021, Marine Crane Models DDP11000CTS & SP2200 (S/N: 2366) (Hull 755) Coast Guard Technical Publication (TP) 9900, SWBS 583, Apr 2021, Marine Crane Models DDP11000CTS & SP2200 S/N 2382 (Hull 756) Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011 International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2) 3.2.1 Hook certification. 3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site: Advise on manufacturer's proprietary system information. Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable. 3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r sum . 3.1.2.2 Submit the name and r sum of the Tech Rep to the COR at the Arrival Conference. 3.1.2.3 Point of contact: Heath Munger Heath.munger@alliedsystems.com Allied Systems Company (503) 825-3366 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000. 3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables Capstan NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2. TABLE 2 LIST OF PARTS QUANTITY PART NUMBER DESCRIPTION SOURCE OF SUPPLY 1 593533 Kit, Element Replacement Allied System Co. 214 S.W. Oregon Street, Sherwood OR 97140 1 593532 Kit, Element Replacement 2 70196 Return Filters 2 74130 Seal Kits 2 71975 Filter Breather 1 71754 Tank Cover Gasket 2 71042 Wire Rope 2 73441 Hub 3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable. TABLE 3 Recurring Maintenance task ADDITION REQUIREMENTS # TASK TYPE QTY COMPONENT OR ASSEMBLY APPENDIX AND PARA. FROM SFLC STD 5000 OTHER 1 Operate and Inspect 1 Dual Point Davit System 3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements) Submit CIR. 2 Service and Inspect 1 Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators. 3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers) Submit CFR. 3 Disassemble and Inspect 2 Power Sheave Assembly 3.2.3 (Disassemble and Inspect) Renew the hub with CFE. If hubs are not available, clean, inspect, and reinstall hubs. 4 Hydraulic Lube Oil Analysis 1 Hydraulic System C2.1.3.1 Submit a CIR. 5 Renew 2 Wire Rope Assembly (Allied System Part No. 71042) D2.2 (Wire rope assemblies) Wire rope particulars: Nominal diameter: 5/8 inch Minimum Breaking Strength: 56,040 lbs. Total length of each wire rope required: 110 ft. End fitting type: Fiege. Submit a CFR. 6 NDE 1 Dual Point Davit System 3.2.5 (NDE) Areas to NDE: all weld joints and boom and turret structures. Submit a CFR. 7 Groom and Lubricate 1 Dual Point Davit System 3.2.6 (Groom and Lubricate) 8 Weight Test 1 Dual Point Davit System B2.7.2 (Dual Point Davits) B2.7.2.1 No-load Operational Test B2.7.2.2 Static Load Test B2.7.2.3 Winch/Brake/Modified static load Test B2.7.2.4 Dynamic Load Test B2.7.2.5 Rated Load test Test weight particulars: Working Load Limit (11,000 lb.). "Modified static / brake" test load: 16,500 pounds (150% of WLL) Modified Dynamic Test Load: 12,650 pounds (115% of WLL) 9 Electric Motors 1 Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR. 10 Fabricate and Install 1 Label plate B2.9 (Label Plates) 11 Partially Preserve 1 Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces) 3.2.4 (Partial Preservation) 12 Service and Inspect? 1? Control Panel? 3.2.2 (Service and Inspect)? Verify all mechanical and electrical signals to the control panel. Submit a CFR.? 3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired. 3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR. 3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000. TABLE 4 - SPECIAL REQUIREMENTS Component Appendix & Paragraph in sflc std spec 5000 Fluids C2.1 Hose assemblies C2.2 Piping and tubing C2.3 Valves and manifolds C2.4 Gages C2.5 Gas charged accumulators C2.6 Heat exchangers and fluid coolers C2.7 Systems C2.8 Fastener assemblies D2.1 Wire rope assemblies D2.2 Brakes and clutches D2.3 Open gearing and gear reducers D2.4 NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR. 3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310. NOTE Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep. 3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR. 4. NOTES FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Showing 1 of 1 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | US COAST GUARD | Feb 28, 2025 | - |
Lifecycle
Solicitation:
70Z085Q11258- Combined Synopsis
- Combined SynopsisCurrentFeb 28, 2025
CGC MIDGETT - Dual Point Biennial Maintenance
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
| - | Awarded | Open | |
| - | Awarded | Open | |
The Contractor shall furnish all necessary labor, materials, services, equipment, supplies, power, accessories, facilities, and all other items required—except as otherwise specified—to perform dockside repairs in accordance with this solicitation and all attached specifications. The scope of work includes ship repair and associated support work and may include work not currently listed as individual Work Items. Work Items 01 and 03 will require the presence onsite of an AUTHORIZED/LICENSED OEM service provider for Caterpillar Marine Diesel engine/Generators (see attached Justification and approval). | - | Combined Synopsis | 11/13/2026 |
Amendment 0006: Amendment provides clarification regarding contractor pier power. One 480 VAC, 400A Viking electrical plug-in will be available on the same pier as the vessel, adjacent to the contractor equipment laydown area. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0005: This amendment provides responses to offeror questions concerning Work Items D-008 and D-021. The amendment corrects the drawing reference in D-008, Paragraph 3.2.3, to CG Drawing 418A-WMSL-801-1 and clarifies the Government-furnished equipment applicable to D-021. All other terms and conditions of the solicitation remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0004: provides the Government’s responses to additional offeror questions regarding drawings and technical requirements associated with Work Items D-016, D-009, and D-008. The amendment also extends the solicitation closing date and time to October 5, 2026, at 1400 Pacific Time (PT); all other terms and conditions remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0003: provides the Government’s response to an offeror question regarding the correct compartment identification for the MPAC work under Work Item D-018. The amendment clarifies that MPAC #1 is located in the FMMR Upper Level and that paragraph 1.1 identifies the correct work locations. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0002: Adds a clarifying note regarding the Attachment 2 Specification posted in Amendment 0001 & extends the no later than due date for receipt of quotes from 22 September 2026 to 29 September 2026 at 10:00 am Pacific Time. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0001: Replaces the Attachment 1 Price Schedule as well as the Attachment 2 Specification. The Attachment 2 Specification originally posted was for a previous/different project regarding the cutter. The Attachment 2 Specification which is part of Amendment 0001 is an entirely different specification and therefore specifies no revisions on the Revisions page iii. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Coast Guard Cutter MIDGETT fiscal quater 2, fiscal year 2027 dockside repair. The period of performance is 2 February - 8 May 2027. | - | Combined Synopsis | 10/05/2026 |
USCGC LEGARE Pelican Hook & Detachable Links This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ) Number 52000QR270000165. This procurement will be processed in accordance with FAR Part 12. The North American Industry Classification System (NAICS) is 336611. The small business size standard is 1300. This is a total small business set aside; all responsible small business sources may submit quotations that will be considered. This synopsis/solicitation is issued pursuant to FAR 13.106-1(b), and the resultant purchase order will be awarded on a firm-fixed price basis using simplified acquisition procedures in accordance with FAR 13. THE UNITED STATED COAST GUARD SURFACE FORCE LOGISTICS CENTER REQUEST THE CONTRACTORS TO PROVIDE PRICING FOR THE FOLLOWING REQUIREMENT: CGC Legare Pelican Hooks & Detachable links. A. REQUIREMENT: 1. The contractor shall provide Pelican Hooks & Detachable links. See Attached SOW. 2. DELIVERY LOCATION (FOB Destination) Coast Guard Yard 2401 Hawkins Point RD Curtis Bay MD, 21226 3. REQUIRED DELIVERY DATE: July 01, 2027 Interested Vendors shall provide product/service details, Product Data Sheet, and cost breakdown IAW SOW for technical review. Vendors shall provide a detailed cost breakdown to include all the specifications to be reviewed by a technical rep. NOTE: The USCG/Government reserves the right to Award on an All or None Basis, i.e., the Government may issue a Purchase Order (PO) to the offeror that submits the lowest aggregate price, rather than issue a PO to each offeror based on the lowest quotation on each item. As stated below, the provision at FAR 52.212-2- Evaluation-Commercial Products and Commercial Services-applies with the following addenda: Award of a contract will be based on the following criteria: The purchase order will be awarded as a firm-fixed price contract using simplified acquisition procedures in accordance with FAR Part 13. 1. Please provide any warranty information. 2. Vendors MUST have an active registration in www.sam.gov The USCG/Government intends to award a purchase order resulting from this synopsis/solicitation to the responsible contractor whose quote conforms to the solicitation and is most advantageous and the best value to the Government, price and other factors considered. The Government will utilize the simplified evaluation procedures outlined in FAR 13.106-2. Please Note: Interested Offerors having the expertise as required are invited to submit a Firm Fixed Price quotation that will be considered by the agency. Quotations must be submitted on company letterhead stationery and must include the following information: (1) Cost Breakdown (2) Unit Cost (3) Extended Price (4) Total Price (5) Payment Terms (6) Discount offered for prompt payment (7) Company Unique Entity ID (UEI) and Cage Code. Quotes must be received no later than 17 November 2026 at 1 P.M. Eastern Standard Time. Email quotes are acceptable and shall be sent to Mr.Cornelius Claiborne at: Cornelius.n.Claiborne@uscg.mil and carbon copy Contracting Officer CWO2 Sean W. Hoy at Sean.W.Hoy@uscg.mil. Any questions or concerns regarding any aspect of the RFQ must be forwarded to Mr. Cornelius Claiborne at email address – Cornelius.n.Claiborne@uscg.mil and carbon copy Contracting Officer, CWO2 Sean W. Hoy via email Sean.W.Hoy@uscg.mil. The following FAR Clauses and Provisions apply to this acquisition: FAR 52.204-7 – System for Award Management (Nov 2024). To facilitate payment, contractors shall be registered in SAM.gov with an active Unique Entity Identifier (UEI) prior to submitting a quotation. A UEI and SAM registration can be obtained via https://www.sam.gov. FAR 52.212-1 - Instructions to Offerors – Commercial Products and Commercial Services (Sep 2023) FAR 52.212-2 - Evaluation - Commercial Products and Commercial Services (Nov 2021) Award will be made to the Offeror proposing the Best Value to the Government considering specification, price, past performance and quality. FAR 52.212-3 - Offeror Representations and Certifications - Commercial Products and Commercial Services (Oct 2025) to include Alt I (Feb 2024). Offeror shall complete annual representations and certification electronically via the System for Award Management (SAM) website accessed through https://www.sam.gov. FAR 52.212-4 - Contract Terms and Conditions - Commercial Products and Commercial Services (Nov 2023) FAR 52.212-5 - Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services (Mar 2026) FAR 52.252-2 - Clauses Incorporated by Reference (Feb 1998) The following clauses, and others as directed by the Contracting Officer as applicable, shall apply to this awarded contract: FAR 52.219-6 - Notice of Total Small Business Set-Aside (Nov 2020 FAR 52.219-28 - Post-Award Small Business Program Rerepresentation (Feb 2024 FAR 52.222-3 - Convict Labor (Jun 2003) FAR 52.222-19 - Child Labor Cooperation with Authorities and Remedies (Mar 2026) (E.O.13126). FAR 52.222-35 - Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212). FAR 52.222-36 - Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793). FAR 52.222-37 - Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212). FAR 52.222-50 - Combating Trafficking in Persons (Oct 2025) (22 U.S.C. chapter 78 and E.O. 13627). FAR 52.225-1 - Buy American Supplies (Oct 2022) (41 U.S.C. chapter 83). (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). FAR 52.232-33 - Payment by Electronic Funds Transfer - Systems for Award Management (Oct 2018) FAR 52.233-3 - Protest After Award (Aug 1996) FAR 52.233-4 - Applicable Law for Breach of Contract Claim (Oct 2004) *The above clauses are incorporated by reference, entire clause(s) available at https://acquisition.gov. NOTICE TO OFFERORS CONCERNING REPRESENTATIONS AND CERTIFICATIONS: This solicitation contains FAR Clause 52.204-7, System for Award Management and FAR Provision 52.204-8, Annual Representations and Certifications. In accordance with FAR 4.1201 (a), prospective contractors shall complete electronic annual representations and certifications via SAM accessed through https://www.sam.gov. Please ensure completion prior to submitting a quotation. Paragraph (b) of FAR 52.204-8 applies. System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Additional examples include 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services, and 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services). | - | Combined Synopsis | 11/17/2026 |
Additional Details
Solicitation Number
70Z085Q11258
Archive Date
Mar 6, 2025
Office Address
ALAMEDA, CA, 94501