GovChime
Notice ID: 8b84d75d7e4e4d778aa25f72253bee17Combined Synopsis/Solicitation

MIDGETT FOLDING BOOM CRANE

Archived on March 3, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 AM UTC−08:00
Posted
February 24, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
336611: Ship Building and Repairing
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
SFLC PROCUREMENT BRANCH 2(00085)
Place of performance
Honolulu, HI, 96819
Last updated
Jan 23, 2026

Identifiers

Solicitation number
70Z085Q250011324
Notice ID
8b84d75d7e4e4d778aa25f72253bee17

Description

General Requirements SCOPE? Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.? REFERENCES? COAST GUARD DRAWINGS? Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement Coast Guard Drawing 418A-WMSL 801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves COAST GUARD PUBLICATIONS? Coast Guard Technical Publication (TP) 7903, SWBS 583, Oct 2021, Aft Boat Handling System Model FB90-28 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures OTHER REFERENCES? The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal 3. REQUIREMENTS? 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.? 3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.?? 3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.? 3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326 58310_MLA_0225_418 ITEM 1: Folding Boom Cranes, Biennial Maintenance, Perform 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to inspect, perform maintenance, and test folding boom cranes listed in Table 1. TABLE 1 LIST OF FOLDING BOOM CRANEs Crane LOCATION MANUFACTURER / MODEL NUMBER coast guard tech pub Crane No. 2 Main Deck, Port Side, Aft of Frame 95 Appleton Marine Inc. / FB90-28 7903 Crane No. 4 Main Deck, Port Side, Aft of Frame 90 Appleton Marine Inc. / FB90-28 7903 Crane No. 3 Main Deck, STBD Side Appleton Marine Inc. / FB90-28 7903 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y *CB-OTH Mark IV (Coast Guard Drawing 26B-CB-IV-801-001) N/A 1 ea. N/A Y *Long Range Interceptor II (LRI-II) Cutter Boat (Coast Guard Drawing 35-LRI-II-801-001) N/A 1 ea. N/A 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement Coast Guard Drawing 418A-WMSL 801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves Coast Guard Publications Coast Guard Technical Publication (TP) 7903, SWBS 583, Oct 2021, Aft Boat Handling System Model FB90-28 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): 3.3 Inspect and repair task particulars (Task #1, #3 and #7) 3.1.2 Tech Rep. The Contractor must provide the services of an OEM Authorized/licensed Tech Rep for Appleton Marine Inc. Model FB90-28 cranes to accomplish the following tasks on site: Provide manufacturer's proprietary system/equipment information, software and tools. Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system. Oversee operational and load testing 3.1.2.1 The Contractor must submit the name of the Tech Rep to the COR at the Arrival Conference. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000. 3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.3 Inspect and repair task particulars. The Contractor with Tech Rep support must perform tasks listed in Table 2 in accordance with SFLC Std Spec 5000 and TP 7903. The CG Inspector must be present for all CIR inspections. See applicable drawings and Tech Pub in Section 2 for technical information and installation details. Table 2 Task List ADDITIONal REQUIREMENTS # TASK TYPE QTY COMPONENT OR ASSEMBLY APPENDIX AND PARA. FROM sflc STD sPEC 5000 OTHER Tech Pub 7903 1 Operate and Inspect 3 Folding Boom Crane 3.2.1 Submit a CIR. Document the existing software program/version. 2 Operate and Inspect 1 Chest Pack (Chest Pack Controls and Junction Boxes) 3.2.1 Submit a CFR. Note: There is one chest pack. It should be rotated between all three cranes. 3 Operate and Inspect 1 Control Console 3.2.1 Submit a CIR. 4 Service & Inspect & Groom & Lubricate 3 Crane Assembly 3.2.2 Perform all preventive maintenance actions as indicated on Table 4-1 of CG TP 7903, regardless of specified interval. Inspect hydraulic hoses for leaks, abrasions, swelling and defects. Inspect entire Folding crane assembly for signs of leakage, cracks, structural damage and deformations. Submit a CFR. NOTE 1: Only check the torque of 25% of the Turntable Bearing Mounting Bolts (4-3.18.1) Include a diagram of the bolts that were checked in the CFR for this section. NOTE 2: Take off removable hose sleeves and hose fitting tape for inspection, if applicable. Reinstall hose sleeves and fitting tape upon completion of inspection. 5 Service and Inspect 3 Cranes (Mechanical/Hydraulic) 3.2.2 Inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection (see Work Item paragraph 3.6), Main Control Manifold, Wire Rope, ELR Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib and Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit a CFR. 6 Partially Preserve 3 Folding Boom Crane Assembly 3.2.4, 3.2.4.3.2, 3.2.4.4, and 3.2.4.5.1 7 Hydraulic Lube Oil Analysis 3 Hydraulic System C2.1.3.1 Submit a CIR. 8 Service and Inspect 1 Hydraulic Power Unit (HPU) 3.2.2 Inspect Prime Mover/Link Motor, HPU Pumps, HPU Reservoir, HPU Tank Heaters, Oil Cooler, HPU Manifold and hoses. HPU Temperature Transmitter, HPU Display, HPU Controls, Joysticks and Control Cabinet in accordance with TP 7903. 9 System Relief Valves, Switches and Indicators 1 Hydraulic System In accordance with TP 7903, verify set points, adjustment and calibration on: Pump Compensator Relief Valve System Relief valve. Winch Limit adjustment. Load Monitor Indicators Crane Position Indicators Submit a CFR. 10 Disassemble and Inspect 1 Hydraulic Oil Heat Exchanger 3.2.3 Disassemble to the minimum extent necessary to clean the heat exchanger. 11 Service and Inspect 2 Hydraulic System Crane Motor A and B 3.2.2 Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Section 3 of TP 7903. Submit a CFR. 12 Service and Inspect 3 Cranes (Electrical) 3.2.2 Inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood lights and Electrical Cables. 13 Operational and Weight Test 3 Folding Boom Crane Assembly Perform in accordance with paragraph 3.5 of this work item. 14 Fabricate and Install 3 Label plate B2.9 Name Plate must also include additional information of Dynamic Load Test, Brake Test and WLL Weights. 3.3.1 Materials. The Contractor must provide all parts (i.e. all greases, lubricating oils, hydraulic fluid, hydraulic oil filters, tank breather elements and other miscellaneous materials) and materials including, but not limited to, the items listed in Table 3 below, to conduct the required maintenance actions listed above. TABLE 3 List of pARTS QUANTITY PART NUMBER DESCRIPTION SOURCE OF SUPPLY 1 YMD-8861-R HPU Hydraulic Return Filter Appleton Marine Inc. 1 YMD-10416 HPU Hydraulic Return Filter 2 YMD-12209-R Pressure Filters (For Crane No.2 & 4) 1 YMD-12234-R (0280D005BH4HC) Pressure Filters (For Crane No.3) 1 YMD-12234-R (0060D005BH4HC) Pressure Filters (For Crane No.3) 3.3.2 Hose inspection. The Contractor must visually inspect the condition of all flexible hoses; TP7903 has a comprehensive list of hoses and their locations. Submit a CFR with the following: Hose number Hose physical condition Service life dates (date for required hose renewal; if not specified, add twelve years to installation date) 3.3.2.1 If not present, the Contractor must provide new hose tags, in accordance with SFLC Std Spec 5000, Paragraph C2.2.1.4. Ensure tag color coding of black on natural or black on white. Ensure that tags must be attached using materials that will not damage hose assembly in any way or interfere with the normal flexing motion of the hose. 3.3.2.2 The Contractor must stamp, engrave, or etch the following information on each tag. Handwritten information on each Tag is NOT acceptable. Utilize the Cutters hose log for information as necessary. Hose Log Item Number (Serial Number) Hydrostatic Test Pressure (psi) Hydrostatic Test Date (DD/MM/YY) Service Life (Replacement Date) Date (QTR "Q"/FY) A-Team: Please discuss keeping or removing paragraph 3.3.2.3 below. This information may be used to help populate the Cutters Hose Log. If the hose log is already populated, or if Ships Force can perform this inspection instead, remove paragraph 3.3.2.3 from this work item. 3.3.2.3 Hose fitting documentation. The Contractor must inspect each hose and document the information listed below. A template for the information will be provided by the COR. Submit a CFR with the information for each hose in Microsoft Excel format. Hose Number System Description (i.e. #1 A/C Inlet) Location (Compartment Number) Length (in.) Part No. Material Size (in.) Fitting #1 Fitting #2 Design Pressure (psi) Hydrostatic Pressure (psi) 3.4 Preservation requirements. The Contractor must perform the following work to accomplish the first bulleted requirement of SFLC Std Spec 5000 (Para 3.2.4.3.2). 3.4.1 All other requirements as specified from SFLC Std Spec 5000 regarding Partially Preserve remain applicable. 3.4.2 In addition to partial preservation, abrade entire crane surface and provide aesthetic topcoat. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. Note Certain water weight bags may be too large to fit within the notch. Ensure test weights are able to fit within the notch to accomplish all testing. CAUTION Do not exceed the Working Load Limit (WLL) of the cranes for any of the tests listed in Appendix A, CG TP 7903. Exceeding the WLL could result in equipment damage and/or personnel injury. 3.5 Operational and Weight Testing. The Contractor must perform the following test items from Appendix A of CG TP 7903. Record all testing data in Appendix A, CG TP 7903 (as required), submit via CFR. Item 2.0 - Individual Crane Tests Perform all tests and record all data in this section except Item 2.1 (Static Load Test). Item 3.0 - Dual Crane Controls, Crane #2 & 4 - Boat Handling Starting with both cranes in the Stowed Position, in Dual Control Mode, transfer a boat from Launch Position #1 to Launch Position #5, then back to Launch Position #1. Move the cranes back to their Stowed Position. Recorded measurements of Height, Angle, Position, and Time are not required. Perform this test one time. Item 4.0 - Crane #3 - Boat Handling Starting with crane in the Stowed Position, transfer a boat from Launch Position #1 to Launch Position #3, then back to Launch Position #1. Move the crane back to the Stowed Position. Recorded measurements of Height, Angle, Position, and Time are not required. Perform this test one time. Item 5.0 - Crane & HPU Functional Test Task #2 of the work item satisfies Item 5.3.6 (Remote Chest Pack). Submit all test data in this Item. Item 6.0 - C.T. Winch Function This test does not need to be performed in conjunction with any other test as indicated in Item 6.2. The test will be conducted pier side with test weight(s) totaling 9,500 lbs. suspended by KTR provided crane. Do not perform Item 6.4 (Objective Boat Handling) Submit all test data for section 6.3. Item 7.0 - Crane Safety Features Perform all tests and submit all test data in this Item. Item 9.0 - Testing Witnessed and Accepted By Submit with testing results. 3.5.1 The Contractor must supply weights and a certified dynamometer to conduct load testing. used during testing for traceability purposes, submit CFR with certification details. 3.5.2 Utilize test weights that will ensure the boom can be extended horizontal in the notch. 3.5.3 Perform all testing in the presence of the Coast Guard Inspector and the Tech Rep. 3.5.4 Perform all testing with cutter at or near 0-degree trim and 0-degrees list. 3.6 Bearing Wear Inspection. The contractor must conduct a bearing wear inspection of the turntable bearing, for all cranes in Table 1, in accordance with CG TP 7903 Appendix B. Submit a CFR with test results as compared with the baseline measurements in Appleton Marines database. 3.7 Calibrated Equipment. Record calibration details, including serial number, for all calibrated equipment used while conducting this work item. Submit via CFR. 3.8 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.9 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310. 4. NOTES This section is not applicable to this work item. THIS WILL BE AWARDED BASED OFF OF PAST PERFORMANCE AND LOWEST PRICE TECHNICHALLY ACCEPTABLE.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationUS COAST GUARDFeb 24, 2025-

Lifecycle

Solicitation:70Z085Q250011324
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentFeb 21, 2025

    MIDGETT FOLDING BOOM CRANE

    Notice 8b84d75d7e4e4d778aa25f72253bee17 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
-AwardedOpen
-AwardedOpen
The Contractor shall furnish all necessary labor, materials, services, equipment, supplies, power, accessories, facilities, and all other items required—except as otherwise specified—to perform dockside repairs in accordance with this solicitation and all attached specifications. The scope of work includes ship repair and associated support work and may include work not currently listed as individual Work Items. Work Items 01 and 03 will require the presence onsite of an AUTHORIZED/LICENSED OEM service provider for Caterpillar Marine Diesel engine/Generators (see attached Justification and approval).
-Combined Synopsis11/13/2026
Amendment 0006: Amendment provides clarification regarding contractor pier power. One 480 VAC, 400A Viking electrical plug-in will be available on the same pier as the vessel, adjacent to the contractor equipment laydown area. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0005: This amendment provides responses to offeror questions concerning Work Items D-008 and D-021. The amendment corrects the drawing reference in D-008, Paragraph 3.2.3, to CG Drawing 418A-WMSL-801-1 and clarifies the Government-furnished equipment applicable to D-021. All other terms and conditions of the solicitation remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0004: provides the Government’s responses to additional offeror questions regarding drawings and technical requirements associated with Work Items D-016, D-009, and D-008. The amendment also extends the solicitation closing date and time to October 5, 2026, at 1400 Pacific Time (PT); all other terms and conditions remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0003: provides the Government’s response to an offeror question regarding the correct compartment identification for the MPAC work under Work Item D-018. The amendment clarifies that MPAC #1 is located in the FMMR Upper Level and that paragraph 1.1 identifies the correct work locations. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0002: Adds a clarifying note regarding the Attachment 2 Specification posted in Amendment 0001 & extends the no later than due date for receipt of quotes from 22 September 2026 to 29 September 2026 at 10:00 am Pacific Time. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0001: Replaces the Attachment 1 Price Schedule as well as the Attachment 2 Specification. The Attachment 2 Specification originally posted was for a previous/different project regarding the cutter. The Attachment 2 Specification which is part of Amendment 0001 is an entirely different specification and therefore specifies no revisions on the Revisions page iii. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Coast Guard Cutter MIDGETT fiscal quater 2, fiscal year 2027 dockside repair. The period of performance is 2 February - 8 May 2027.
-Combined Synopsis10/05/2026
USCGC LEGARE Pelican Hook & Detachable Links This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ) Number 52000QR270000165. This procurement will be processed in accordance with FAR Part 12. The North American Industry Classification System (NAICS) is 336611. The small business size standard is 1300. This is a total small business set aside; all responsible small business sources may submit quotations that will be considered. This synopsis/solicitation is issued pursuant to FAR 13.106-1(b), and the resultant purchase order will be awarded on a firm-fixed price basis using simplified acquisition procedures in accordance with FAR 13. THE UNITED STATED COAST GUARD SURFACE FORCE LOGISTICS CENTER REQUEST THE CONTRACTORS TO PROVIDE PRICING FOR THE FOLLOWING REQUIREMENT: CGC Legare Pelican Hooks & Detachable links. A. REQUIREMENT: 1. The contractor shall provide Pelican Hooks & Detachable links. See Attached SOW. 2. DELIVERY LOCATION (FOB Destination) Coast Guard Yard 2401 Hawkins Point RD Curtis Bay MD, 21226 3. REQUIRED DELIVERY DATE: July 01, 2027 Interested Vendors shall provide product/service details, Product Data Sheet, and cost breakdown IAW SOW for technical review. Vendors shall provide a detailed cost breakdown to include all the specifications to be reviewed by a technical rep. NOTE: The USCG/Government reserves the right to Award on an All or None Basis, i.e., the Government may issue a Purchase Order (PO) to the offeror that submits the lowest aggregate price, rather than issue a PO to each offeror based on the lowest quotation on each item. As stated below, the provision at FAR 52.212-2- Evaluation-Commercial Products and Commercial Services-applies with the following addenda: Award of a contract will be based on the following criteria: The purchase order will be awarded as a firm-fixed price contract using simplified acquisition procedures in accordance with FAR Part 13. 1. Please provide any warranty information. 2. Vendors MUST have an active registration in www.sam.gov The USCG/Government intends to award a purchase order resulting from this synopsis/solicitation to the responsible contractor whose quote conforms to the solicitation and is most advantageous and the best value to the Government, price and other factors considered. The Government will utilize the simplified evaluation procedures outlined in FAR 13.106-2. Please Note: Interested Offerors having the expertise as required are invited to submit a Firm Fixed Price quotation that will be considered by the agency. Quotations must be submitted on company letterhead stationery and must include the following information: (1) Cost Breakdown (2) Unit Cost (3) Extended Price (4) Total Price (5) Payment Terms (6) Discount offered for prompt payment (7) Company Unique Entity ID (UEI) and Cage Code. Quotes must be received no later than 17 November 2026 at 1 P.M. Eastern Standard Time. Email quotes are acceptable and shall be sent to Mr.Cornelius Claiborne at: Cornelius.n.Claiborne@uscg.mil and carbon copy Contracting Officer CWO2 Sean W. Hoy at Sean.W.Hoy@uscg.mil. Any questions or concerns regarding any aspect of the RFQ must be forwarded to Mr. Cornelius Claiborne at email address – Cornelius.n.Claiborne@uscg.mil and carbon copy Contracting Officer, CWO2 Sean W. Hoy via email Sean.W.Hoy@uscg.mil. The following FAR Clauses and Provisions apply to this acquisition: FAR 52.204-7 – System for Award Management (Nov 2024). To facilitate payment, contractors shall be registered in SAM.gov with an active Unique Entity Identifier (UEI) prior to submitting a quotation. A UEI and SAM registration can be obtained via https://www.sam.gov. FAR 52.212-1 - Instructions to Offerors – Commercial Products and Commercial Services (Sep 2023) FAR 52.212-2 - Evaluation - Commercial Products and Commercial Services (Nov 2021) Award will be made to the Offeror proposing the Best Value to the Government considering specification, price, past performance and quality. FAR 52.212-3 - Offeror Representations and Certifications - Commercial Products and Commercial Services (Oct 2025) to include Alt I (Feb 2024). Offeror shall complete annual representations and certification electronically via the System for Award Management (SAM) website accessed through https://www.sam.gov. FAR 52.212-4 - Contract Terms and Conditions - Commercial Products and Commercial Services (Nov 2023) FAR 52.212-5 - Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services (Mar 2026) FAR 52.252-2 - Clauses Incorporated by Reference (Feb 1998) The following clauses, and others as directed by the Contracting Officer as applicable, shall apply to this awarded contract: FAR 52.219-6 - Notice of Total Small Business Set-Aside (Nov 2020 FAR 52.219-28 - Post-Award Small Business Program Rerepresentation (Feb 2024 FAR 52.222-3 - Convict Labor (Jun 2003) FAR 52.222-19 - Child Labor Cooperation with Authorities and Remedies (Mar 2026) (E.O.13126). FAR 52.222-35 - Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212). FAR 52.222-36 - Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793). FAR 52.222-37 - Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212). FAR 52.222-50 - Combating Trafficking in Persons (Oct 2025) (22 U.S.C. chapter 78 and E.O. 13627). FAR 52.225-1 - Buy American Supplies (Oct 2022) (41 U.S.C. chapter 83). (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). FAR 52.232-33 - Payment by Electronic Funds Transfer - Systems for Award Management (Oct 2018) FAR 52.233-3 - Protest After Award (Aug 1996) FAR 52.233-4 - Applicable Law for Breach of Contract Claim (Oct 2004) *The above clauses are incorporated by reference, entire clause(s) available at https://acquisition.gov. NOTICE TO OFFERORS CONCERNING REPRESENTATIONS AND CERTIFICATIONS: This solicitation contains FAR Clause 52.204-7, System for Award Management and FAR Provision 52.204-8, Annual Representations and Certifications. In accordance with FAR 4.1201 (a), prospective contractors shall complete electronic annual representations and certifications via SAM accessed through https://www.sam.gov. Please ensure completion prior to submitting a quotation. Paragraph (b) of FAR 52.204-8 applies. System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Additional examples include 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services, and 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
-Combined Synopsis11/17/2026

Additional Details

Solicitation Number

70Z085Q250011324

Archive Date

Mar 3, 2025

Office Address

ALAMEDA, CA, 94501