GovChime
Notice ID: ba5ad58b196445109894734c0be64768SolicitationArchived

REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

Archived on August 22, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM PDT
Posted
July 29, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
CEU OAKLAND(00088)
Place of performance
Astoria, Oregon, 97103
PSC
Z2BC: REPAIR OR ALTERATION OF RADAR AND NAVIGATIONAL FACILITIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z08826B0000123
Notice ID
ba5ad58b196445109894734c0be64768

Description

NOTE: The USCG is NOT accepting any more RFIs/Questions as of Weds, 22Jul2026. The Due Date has been extended to no later than 01:00 PM PST on Friday, August 7, 2026. As of Weds, 29Jul2026, three (3) IFB Amendments has been posted & all 3 must be completed/returned with your bid. Please carefully review them. INVITATION FOR BID (IFB) No: 70Z08826B0000123, FY26 REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR; PSN 20041934 Z2BC - REPAIR OR ALTERATION OF RADAR AND NAVIGATIONAL FACILITIES 237990 - Other Heavy and Civil Engineering Construction BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. Project Description: In accordance with attached Specifications dated/approved 08Apr2026. (Subject to change at the discretion of the Government). Contractor shall provide all necessary supervision, labor, materials, equipment, power, and personnel to accomplish work installing, replacing, and/or removing ATON structures in the Columbia River Area/U.S. Coast Guard (USCG) Base Tongue Point, located at Astoria, Oregon. Work includes, but is not limited to: Standard ATON Maintenance work which includes removals, replacements, and repairs of damaged ATON structures. See appendix A, appendix B, and attached Specifications for scope requirements. ATON structure fabrication. Surveying of completed range structures to ensure proper positioning. Structures will be constructed within in-water work window limitations. The Columbia River in-water work window for this project is November 01, 2026 thru February 28, 2027. ALL In-Water work must be completed by February 28, 2027.The procurement estimate is between $1,000,000.00 and $5,000,000.00. The NAICS for this project is 237990. This requirement is issued as an Invitation for Bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) Contract. Please carefully review all attachments. Request for Clarification can be submitted to BOTH Vincent Yee at vincent.yee@uscg.mil AND Guiljohn Alcantara at guiljohn.alcantara@uscg.mil Request for Clarification should be submitted using form provided, Appendix F. Submitted BIDs must include the following information: One (1) completed copy of the SF 1442 (Appendix A) Signed copies of all amendments, if applicable. IFB-Section B, schedule of Prices IFB- Section K, Reps and Certs (note IFB highlighted sections) IFB- Section L, Bid Bond (Standard Form 24) IFB- Section K.8 (if applicable)- Certification of Authority to Bind Corporation. Bids shall be up-loaded via DOD Safe from July 20, 2026 thru July 31, 2026. Instructions are in the IFB Document. Early Bid submittals are highly encouraged. *Please do not call to inquire about the status of your bid, as this information will not be released.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (17)

  • Amendment 03 - IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR.pdf

    449 KBAdded in Solicitation version 7Posted
    Download
  • Amendment 03A-20041934 GFM List updated.pdf

    137 KBAdded in Solicitation version 7Posted
    Download
  • Amendment 03B-CFM Drawings.pdf

    2.0 MBAdded in Solicitation version 7Posted
    Download
  • IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR_R1-22Jul26.pdf

    1.4 MBAdded in Solicitation version 4Posted
    Download
  • Amendment 02 - IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR.pdf

    207 KBAdded in Solicitation version 4Posted
    Download
  • Amendment 01 - IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR.pdf

    370 KBAdded in Solicitation version 3Posted
    Download
  • APPENDIX K CERT OF AUTHORIZATION TO BIND CORPORATION FAR 4.pdf

    387 KBAdded in Solicitation version 1Posted
    Download
  • APPENDIX E Wage Determination OR20260063 dated 18May25.pdf

    85 KBAdded in Solicitation version 1Posted
    Download
  • APPENDIX C-Replace ATON-DRAWINGS.pdf

    5.1 MBAdded in Solicitation version 1Posted
    Download
  • APPENDIX F- Sample Survey.pdf

    4.3 MBAdded in Solicitation version 1Posted
    Download
  • APPENDIX B-Replace ATON-SPECIFICATIONS_08Apr26.pdf

    3.9 MBAdded in Solicitation version 1Posted
    Download
  • APPENDIX H- Inadvertent Discovery Plan.pdf

    1.6 MBAdded in Solicitation version 1Posted
    Download
  • APPENDIX A-SF1442-ATON ASTORIA_B0000123.pdf

    840 KBAdded in Solicitation version 1Posted
    Download
  • APPENDIX D-Marine Mammal Monitoring Plan.pdf

    404 KBAdded in Solicitation version 1Posted
    Download
  • APPENDIX G-GFM List.pdf

    140 KBAdded in Solicitation version 1Posted
    Download
  • APPENDIX I-Contractor Responsibility.pdf

    32 KBAdded in Solicitation version 1Posted
    Download
  • APPENDIX J-Clarification Request Form.docx

    28 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

    Notice 0a532e4c5dfe42c3a9d752a4fd2b6e54 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

    Notice 958bbe887671403a9e5b6450e71916c4 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

    Notice b39a672a376c4bf086f643a10902ff65 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

    Notice b6ca59537ec8432cb5ab96c544c79493 on SAM.gov

  5. 7
    Version 7SolicitationArchivedCurrent

    REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR

    Notice ba5ad58b196445109894734c0be64768 on SAM.gov

  6. 9
    Version 9Special NoticeArchived

    Type changed from Solicitation to Special Notice

    70Z08826B0000123 — Bid Abstract: Repair & Replace ATON, USCG Base Tongue Point/Columbia River

    Notice 743749dd2da741abaf975b21f5d32c1b on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeMay 29, 2026

    SOURCES SOUGHT NOTICE to identify firms capable of performing ATON Repair & Replace Work at Base Tongue Point/Columbia River, Astoria, OR

    Notice 6a7a5a5dcaaf49d482c2f153c8a2647a on SAM.gov

  2. Market ResearchRelated noticeJun 4, 2026

    SOURCES SOUGHT NOTICE to identify firms capable of performing ATON Repair & Replace Work at Base Tongue Point/Columbia River, Astoria, OR

    Notice dea1c8e8f9af4098901fd9f7d676d0e7 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

70Z08826B0000123

Archive Date

Aug 22, 2026

Office Address

OAKLAND, CA, 94612