REPLACE UNDERWATER MEMBERS - COVERED MOORINGS

Archived on April 30, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
March 7, 2024
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
CEU PROVIDENCE(000G1)
Place of performance
Boston, MA, 02109
Last updated
Dec 4, 2025

Identifiers

Solicitation number
70Z0G124BBBOS0078
Notice ID
8bd4e9c5a94e4dad8ba086c7897f0123

Description

70Z0G124BBOS0078, Replace Underwater Members Covered Moorings, PSN 23010287. Contractor shall furnish all labor, material, equipment, transportation, disposal, supervision, and incidental related work necessary to perform structural repairs to the Covered Mooring Floating Dock outboard of Wharf 4 at U.S. Coast Guard, Base Boston, Boston, MA. Work includes a complete inspection and report on the Covered Mooring Floating Docks underwater condition, and to replace nine underwater steel bracings, bolt connections and brackets. All work shall be accomplished in accordance with the Specifications for PSN 23010287 (70 pages), Drawings CC-1354 (7 sheets), and the applicable wage rates incorporated herein. ABSTRACT OF BIDS POSTED IN ATTACHMENT SECTION

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:70Z0G124BBBOS0078
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    SolicitationCurrentJan 25, 2024

    REPLACE UNDERWATER MEMBERS - COVERED MOORINGS

    Notice 8bd4e9c5a94e4dad8ba086c7897f0123 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Isle au Haut Thoroughfare Federal Navigation Project, located between Isle au Haut, Maine and Kimball Island, Maine on the outskirts of Penobscot Bay, about six miles southeast of Stonington and 25 miles east of Rockland. The Federal Navigation Project consists of a -6-foot Mean Lower Low Water (MLLW) deep by 75-foot wide extending 1,200-foot in length through the shoal in the thoroughfare.The proposed work consists of mechanically dredging approximately 3,355 cubic yards (cy) (1,183 cy required, plus 2,172 cy overdepth) of shoaled material consisting of highly compacted coarse sand and gravel, with areas of cobbles and isolated small boulders from the channel. Due to the material type, a mechanical dredge with the ability to dig highly compacted coarse sand and gravel will be required. The proposed action is to dredge to the authorized depth of -6-foot MLLW plus an additional 1-foot of required advance maintenance with an additional allowable 1-foot of overdepth (e.g. -7-foot MLLW required + 1-foot allowable OD). One-time, advanced maintenance is approved for the entirety of the 1200-foot long authorized channel. The dredged material will be placed at the Flake Island Disposal Site (FIDS) which is approximately 1 nautical mile northwest of the FNP. Placement of the dredged material (sand, gravel and cobble) at Flake Island Disposal Site will benefit both juvenile lobster habitat and juvenile cod by increasing the areas habitat complexity.The anticipated allowable dredging window is between September 15 and April 1 to avoid impacts to spawning shellfish, benthic resources, Essential Fish Habitat (EFH) of federally managed species, threatened and endangered species and interactions with mobile fishing gear.
-Solicitation11/10/2026
Maintenance Dredging, Wareham Harbor, Wareham, MA
-Solicitation01/21/2026
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil. The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil.
-Pre-SolicitationOpen
KONA LOW STORM DAMAGE REPAIRS - KILOHANA GROUP HOUSING SITE LAHAINA, HI This is a combined synopsis/solicitation and is issued as Request for Quotation (RFQ) 70FBR927Q00000003. Under this requirement, the Department of Homeland Security (DHS), Federal Emergency Management Agency (FEMA) intends to award a single Contract using simplified acquisition procedures. In accordance with (IAW) the Federal Acquisition Regulation (FAR) 13.106-2, evaluation will be conducted by comparative evaluation of quotes. Requirement: Restore erosion damaged areas to pre-storm conditions and reduce the risk of erosion during future storms by including mitigation measures in the repair areas. North American Industrial Classification System (NAICS) code: 237990 (Other Heavy and Civil Engineering Construction), 238910 (Site Preparation Contractors), 237110 (Water and Sewer Lines and Related Structures Construction) Product Service Code (PSC): C1PZ (Architect and Engineering- Construction: Other Non-Building Facilities) Contracting Office Address: 500 C Street SW, Washington, DC 20472 Place of Performance Location: 250 Fleming Road, Lahaina, HI 96761 Solicitation Number: 70FBR927Q00000003 Set-Aside: 100% Small Business All Offerors must be registered and active in SAM.gov at time of quote submission. All Offerors must be in the local area of Maui County and certify Attachments 3, 4, and 5 of the solicitation. Important Timeline Request for Quote Released: November 2, 2026 Request for Site Visit: Request to attend site visit must be sent to george.brownjr@fema.dhs.gov by 2:00 PM Hawaii Standard Time (HST) on November 04, 2026. The request must include the full names of the representative. Attendance is not mandatory but will give a better observation of what is required. Site Visit: 1:00 PM Hawaii Standard Time (HST) on November 06, 2026 @ 250 Fleming Road, Lahaina, HI 96761. Questions: If you have question about the solicitation, those questions are to be sent to george.brownjr@fema.dhs.gov by 2:00 PM Hawaii Standard Time (HST) on November 09, 2026. Answers will be provided on November 10, 2026 by 11:00 AM Hawaii Standard Time (HST). Quote Due Date: 1:00 PM Hawaii Standard Time (HST) on November 17, 2026. Late submission will not be considered. Amendment 01 - Revise Exhibit G of the Statement of Work (SOW). The mauka jersey barriers are relocated to align with the post at the end of the Kaiaulu O Kukia fence. The space between Berm A and Berm B is narrower at that point. To compensate, there are four jersey barriers between the Berm A and Berm B. The remaining two jersey barriers are relocated to the opposite site of Berm B. There are still six barriers as originally specified. There are also still twenty rows of fiber rolls, they are just spaced slightly further apart.
-Combined Synopsis11/17/2026
Contractor shall provide all labor, materials, equipment, transportation, supervision and disposal required for the structural repair, recapitalization, and/or demolish Aids to Navigation (ATON) structures at various southern sites in the CG Northeast District. The project consists of a Base Bid at the following sites in New York, Connecticut and Rhode Island: 1. New Haven Middle Breakwater West End Light (LLNR 24070): Replace existing tower in kind. 2. Stonington Outer Breakwater Light 4 (LLNR 20170): Replace existing concrete foundation, replace existing tower with standard 5x5 tower. 3. Stonington Breakwater Light 5 (LLNR 20175): Replace existing concrete foundation, repoint existing granite block foundation, replace existing tower in kind. 4. Norwalk Channel Light 10 (LLNR 24990): Replace existing foundation and tower in kind. 5. Port Jefferson West Breakwater Light 2A (LLNR 26145): Replace existing foundation and tower in kind. 6. Connecticut River Light 135 (LLNR 23300): Demolish ATON structure to below-grade elevation & reseed. 7. Point Judith Harbor of Refuge West Entrance Light 3 (LLNR 19505):Demolish existing structure & rebuild as standard 5x5 tower on concrete foundation offset from jetty erosion. An option item for an additional Aid to Navigation (ATON) structure repair in Massachusetts is included as follows: 1. Chatham Light (LLNR 525): Replace windows in kind & clean/recoat exterior/interior. The estimated value of the procurement is between $1,000,000 and $5,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. The applicable North American Industry Classification System (NAICS) code is 237990 - Other Heavy and Civil Engineering Construction with a small business size standard of $45.0 million. Solicitation packages will be available on or about 4 November 2026. The tentative date set for receipt of bids is 8 December 2026 at 2:00 p.m. The base performance period is estimated to be 300 calendar days from issuance of Notice to Proceed and the option performance period is estimated to be 60 calendar days to be exercised at the Contracting Officers discretion. This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue of the IFB at the following site: https://www.sam.gov. Vendors MUST be registered in the System for Award Management database through https://www.sam.gov in order to receive a federal government contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.