GovChime
Notice ID: 1b52f129e869417096ea453475e74600Award NoticeAwarded

Boilers for U.S. Coast Guard Training Center Cape May, NJ

Awarded on July 22, 2020. Full description on SAM.gov.

Awarded tounder 70Z0G820PPFC01900 (source: SAM.gov award notice)• $127.3K

Overview

Posted
July 23, 2020
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
423720: Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers

Notice details

Office
BASE NATIONAL CAPITAL REGION(000G8)
Place of performance
Cape May, NJ, 08204
Last updated
Apr 29, 2026
Award date
Jul 22, 2020
Award amount (SAM.gov award notice)
$127.3K

Identifiers

Solicitation number
70Z0G820PPFC01900
Notice ID
1b52f129e869417096ea453475e74600
Award number (PIID)
70Z0G820PPFC01900

Description

Award Overview

Award Number

70Z0G820PPFC01900

Award Amount (SAM.gov award notice)

$127.3K

Award Date

Jul 22, 2020

Awardee

Awardee UEI

MW39J4TZ5SN8

Original Solicitation

Notice ID: 1b52f129e869417096ea453475e74600

Posted Date: Jul 23, 2020

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:70Z0G820PPFC01900
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentJul 23, 2020

    Boilers for U.S. Coast Guard Training Center Cape May, NJ

    Notice 1b52f129e869417096ea453475e74600 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.
40%
Combined Synopsis11/13/2026
Boiler
36%
Combined Synopsis09/01/2026
Boiler
36%
Combined Synopsis09/01/2026
KN10 HYDROTHERM KN-10 BOILER EA 2, KN20 HYDROTHERM BOILER EA 2, WB1250 RBI TORUS 1250MBH BOILER EA 1, WB1000 RBI TORUS 1000MBH BOILER EA 4, EF100T199E3N BRADFORD WHITE NG 100 GALLON 199,000BTU COMMERCIAL WATER HEATER EA 6
36%
Combined Synopsis07/16/2026
HVAC BOILERS - FORT BRAGG
35%
Combined Synopsis08/18/2026

Additional Details

Solicitation Number

70Z0G820PPFC01900

Archive Date

Aug 6, 2020

Office Address

WASHINGTON, DC, 20593