Notice ID: 74ff5bb933da4d4ea11b225bd7b96b82Combined Synopsis/Solicitation

Inspect and Repair of 13.2KV Main Switchgear

Responses closed . Full description on SAM.gov.

Overview

Response deadline
8:00 AM EST
Posted
November 5, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
USCG ACADEMY
Place of performance
New London, Connecticut, 06320
Last updated
Nov 7, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70ZH1526QCGA00009
Notice ID
74ff5bb933da4d4ea11b225bd7b96b82

Description

The U.S. Coast Guard Academy requires a qualified, licensed electrical contractor to inspect, repair as necessary, test, and restore Eaton/Cutler-Hammer MVS2 13.2 kV medium-voltage load interrupter switchgear, with primary work focused on Cabinet 5 and the associated 15 kV feeder cable serving Smith Hall. The contractor shall inspect Cabinet 5 for damage or missing/cannibalized components; remove and replace three Eaton 15CLE-250E fuses; procure and deliver three additional matching fuses for on-site spares; perform insulation-resistance testing of the feeder cable in accordance with current ANSI/NETA standards; provide certified test and field-service reports; coordinate all required outages and lockout/tagout procedures with the Government; and safely re-energize the cabinet and feeder upon successful completion of repairs and testing. All work shall comply with applicable OSHA, NFPA 70E, federal, state, and local requirements, including proper licensed personnel, arc-flash personal protective equipment, site protection, cleanup, and disposal of waste materials.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (3)

  • SwithGear QA CGA Response 5NOV26.pdf

    64 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • SOW Inspect and Repair Main Switchgear at CGA.pdf

    1.2 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Combined Synopsis Solicitation CGC Switchgear FY27.pdf

    259 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    Inspect and Repair of 13.2KV Main Switchgear

    Notice fe4d282a81414b2ba27f32e30140b0fa on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationCurrent

    Inspect and Repair of 13.2KV Main Switchgear

    Notice 74ff5bb933da4d4ea11b225bd7b96b82 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THIS A PRE-SOLICITATION NOTICE. The Mission & Installation Contracting Command (MICC)-Fort Buchanan has a Request for Quote (RFQ) No. W912C327QA001 for Electrical Substation Maintenance and Repairs. A Firm Fixed Price contract will be awarded for this requirement. The RFQ will be issued on or about 23 November 2026. The RFQ will be issued as 100% set-aside small business on a competitive basis. All responsible sources are invited to submit a quote under this solicitation. The North American Industry Classification System (NAICS) code applicable to this requirement is 238210, Electrical Contractors and Other Wiring Installation Contractors. The size standard is $19 Million. MICC has a requirement for Electrical Substation Maintenance and Repairs, including all necessary administrative functions, personnel, materials, tools, equipment, services, transportation, and insurance required to perform the services outlined in the PWS. The requirement supports Fort Buchanan’s electrical distribution systems serving military and civilian personnel, tenant commands, schools, housing areas, and associated organizations across the installation. Work includes annual preventive maintenance, electrical diagnostics, utility coordination with LUMA, vegetation control, unscheduled service response, and corrective repairs using Original Equipment Manufacturer (OEM) or approved parts. For any request for information on this requirement contact Eileen Rivera at eileen.z.riveradomenech.civ@army.mil and/or Felix Marrero at Felix.r.marrero2.civ@army.mil.
68%
Pre-Solicitation11/23/2026
THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSALS. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, NOR DRAWINGS AVAILABLE AT THIS TIME. The U.S. Army Corps of Engineers – Norfolk District is anticipating a future procurement for a firm-fixed-price construction contract for the Gathright Dam Motor Control Center Electrical Repairs Project in Covington, Virginia. Description of Work: The United States Army Corps of Engineers, Norfolk District, is seeking eligible firms capable of performing motor power, control, and instrumentation electrical renovations for the intake tower located at Gathright Dam, Virginia. The primary electrical scope entails the replacement of existing 480-volt motor control centers (designated MCC2 and MCC3) with new motor control centers complete with starters, controls, incoming and outgoing feeders, incoming and outgoing conduits, control circuits, and field wiring. Incidental work includes contractor field verification of conduit pathways, replacement of conduits directly affected by equipment replacements or compromised by corrosion in accordance with the conduit and cable schedule, and the replacement in-kind of transformer XFMR-3. In addition, the project requires the comprehensive replacement and modernization of the facility control system. Work includes the demolition of existing control panels, power panels, and communication panels, followed by the installation of new Programmable Logic Controller (PLC) panels, Remote Input/Output (RIO) panels, Human-Machine Interface (HMI) screens, and all associated network wiring, cabling, and conduit infrastructure. Work to include replacement of the instrumentation for the wet well gate displacement (linear displacement sensors) to be tied into the new control system and updates to lighting to manage the nearing end-of-life of the old metal-halide high bay lights and fluorescent wallpack lights. The contractor will also be responsible for programming the new PLCs and reprogramming the existing Sutron system. All operations must be carefully phased and coordinated, as facility buildings will remain occupied throughout the duration of contract performance. There is also a bid option for a warehouse-style high bay luminaire lifting mechanism at a low-enough power-per-luminaire to tie into the associated existing lighting circuit. The estimated construction price range for this project is between $1,000,000.00 and $5,000,000.00. NAICS Code 238210, Electrical Contractors and Oher Wiring Installation Contractors, applies to this project with a small business size standard of $19,000,000.00. PSC J061, Maintenance, Repair, and Rebuilding of Equipment – Electric Wire and Power Distribution Equipment, applies to this project. The Government is not obligated to and will not pay for any information received from potential sources as a result of this sources sought. Construction Time: The construction period of performance will be approximately 360 calendar days from issuance of the Notice to Proceed (NTP). The official synopsis citing the solicitation number will be issued on System for Award Management (SAM) at www.sam.gov. INDUSTRY SURVEY The following confidential survey questionnaire is designed to apprise the Corps of prospective contractors' project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Gathright Dam Motor Control Center Electrical Repairs in Covington, Virginia. Firm's response to this Synopsis shall be limited to 5 pages and shall include the following information. 1. Firm's name, address, point of contact, phone number, and e-mail address. 2. Firm's interest in bidding on the solicitation when it is issued. 3. Firm's capability to perform a contract of this magnitude and complexity (include firm's capability to execute construction, comparable work performed within the past 5 years): Brief description of the project, (customer name, timeliness of performance, and dollar value of the project) - provide at least 3 examples. 4. Firm's Business Size - LB, SB, 8(a), HUBZone, SDVOSB, or WOB. 5. Firm's Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable. 6. Firm's Bonding Capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from a bonding company. Please only include a narrative of the requested information. Additional information will not be reviewed. This Sources Sought Synopsis should not be construed in any manner to be an obligation of the U.S. Army Corps of Engineers, Norfolk District to issue a contract, or result in any claim for reimbursement of costs for any effort you expand responding to this request. No solicitation is currently available. The Government will utilize this information in determining an acquisition strategy. Please state all of the socio-economic categories in which your company belongs—(8)(a), Hub-zone, Service-Disabled Veteran Owned Small Business, Woman Owned. Please submit capability packages and responses to the above questions via email to Caleb Bookout at Brian.C.Bookout@usace.army.mil, copying Luke D. Hedlund at Luke.D.Hedlund@usace.army.mil. Responses must be submitted no later than Close of Business 19 November 2026 . The official synopsis citing the solicitation number will be issued on SAM.gov at https://sam.gov/content/home. All prospective contractors are required to be registered in the System for Award Management (SAM) database prior to contract award. Offerors and contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220 or via the Internet at https://www.sam.gov. Representations and Certifications Applications apply to this solicitation. Representations and Certifications may be completed online via the SAM. No attachments or links have been added to this opportunity.
60%
Market Research11/19/2026
3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical Supervisor for each item of equipment to be field-tested. No testing is to be performed until after the test procedures and schedules have been approved. The contractor shall be responsible for all coordination between Dominion Virginia Power (if applicable), station supervisory personnel and test personnel for scheduling shut-downs, system tests and tests on system components. The V.A Medical Center Electrical Staff will be responsible for conducting the actual scheduled outages and reenergizing of circuits and components on V.A. premises and V.A. owned equipment only. Lockout/Tagout of this equipment will be performed jointly between the V. A. Medical Center Electricians and the Contractor. The contractor will be responsible for removal and replacement of any and all breakers needing to be tested. All breakers being removed will be properly reinstalled. Any and all conductors removed from a breaker will be properly terminated back to that breaker and any and all lugs will be properly torqued to manufacturers specifications. Testing shall commence and be completed within nine (9) consecutive days, beginning on a Saturday and ending on the following Sunday. The specific dates shall be coordinated with the COTR. All outages shall be scheduled with the COTR two weeks in advance of testing start date. Testing dates may change due to inclement weather, however, the COTR shall first be notified and approve any changes necessary. Contractor shall anticipate all work to be done after normal working hours. Outages will be scheduled at night between the hours of 5:00 p.m. and midnight and between the hours of 7:00 am and 5:00 p.m. on weekends. However the Contractor should be prepared to work longer hours should problems develop to assure restoration of power. Daytime hours, during the week, may be approved under certain circumstances if there is no impact to building occupants. This would be a rare instance, thus Contractor should anticipate overtime hours for all contract requirements. Equipment Repairs: Minor repairs shall include but not be limited to such items as loose bolts, loose or broken lugs, wiring terminals, heaters, malfunctioning targets, dirty/high resistance connections, etc and shall be corrected on site during testing if possible. Repair or replacement of larger items such as breakers shall also be performed during this outage if possible. However if parts are not readily available, these items will be repaired or replaced under a separate smaller outage and will be scheduled after parts or components are available. Contractor shall set aside a line item not to exceed $50,000 for repair or replacement parts with this contract. All repairs shall be invoiced under this line item at the conclusion of the contract. This amount is to be used for bidding purposes. However a materials breakdown will be required with the final invoice and Contractor shall be paid actual costs with appropriate mark up s up to $50,000 for parts. Contractor is not to exceed this amount without prior written approval of the Contracting Officer. Minimum Equipment Test Requirements: 5 KV AIR CIRCUIT BREAKERS 1. The breakers will be removed from their compartments. The compartments shall be cleaned and inspected. Shutters shall be cleaned, inspected, and tested for proper operation. The racking mechanisms shall also be cleaned, lubricated and tested for proper operation. 2. All cable termination s, both primary and secondary, shall he checked for signs of overheating, proper tightness and support. 3. All exposed bus connections shall be checked for signs of overheating and for proper tightness. 4. The arc chutes will be removed, cleaned and inspected. 5. The entire breaker and the mechanism will be inspected. 6. The entire operating mechanism will be thoroughly cleaned, lubricated and exercised. 7. All of the interior components of the circuit breaker will be thoroughly cleaned. 8. The contacts and current carrying assemblies will be inspected for burning, pitting, arcing, worn fingers, garter springs etc. 9. The contacts will be cleaned and anti-oxidant grease will be applied to the breaker s main contacts. 10. The breaker contact resistance will be measured and recorded. 11. An insulation resistance test will be performed and results recorded. 12. The breaker will then be closed manually to ensure proper closing and trip operations. 13. Any and all interlocks will be checked and proper operation will be verified. 14. The breaker will be electrically operated when test stands are available, or the breaker will be operated from its cubicle, if the system allows. 15. All indicating devices such as lights, flags, switches etc. shall be tested for proper operation. Any that are not operating properly shall be repaired at that time if possible. 16. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. ENCLOSED AIR BREAK SWITCHES (MEDIUM VOLTAGE) 1. After shutdown, the entire switch mechanism will be cleaned and inspected. 2. The switch contacts will be checked for proper alignment. Anti-oxidant grease will be applied to the main contacts. 3. The switch s arcing contacts will be checked for the proper opening sequence relative to the main contacts. 4. The switch s operating mechanism will be inspected for wear and proper operation. The entire mechanism will be cleaned and lubricated. All interlocks will be tested and proper operation will be verified. 5. Fuses will be inspected; size and type will be recorded. 6. All phase isolation barriers will be cleaned, and the barriers will be checked for contamination and corona damage. 7. All insulators will be cleaned and visually inspected for cracks and chips. 8. All exposed bus and cable connections will be checked for proper tightness and for evidence of overheating, burning or tracking. 9. All lightning arrestors will be cleaned and inspected for broken or damaged porcelain and subjected to an insulation resistance test. Results shall be recorded. 10. All ground connections will be inspected and repaired if found to be inadequate. 11. Contact resistance and insulation resistance tests will be performed, where possible, and the results recorded. 12. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. OIL-FILLED TRANSFORMERS 1. The transformers will be inspected for leaks, poor seals and or gaskets, and for proper oil levels. 2. The transformer tank and its cooling fins will be inspected for rust, chipped paint, dents, and proper connection to ground. 3. All of the bushings will be cleaned, inspected for cracks and or chips. proper tightness. and evidence of overheating. 4. All gauges and alarm devices will he inspected, recorded and reset where applicable. 5. Insulation resistance tests of each transformer winding will he performed, where possible and the results recorded. 6. Turns ratio test shall be performed and recordings documented. 7. The oil will be sampled and tested in accordance with ASTM procedures. All sampling devices used will be new, clean and sealed with thread sealant. Drip pans shall be installed under all the valves prior to any oil removal. The contractor will clean up any and all oil lost during sampling. DRY-TYPE TRANSFORMERS 1. Check enclosure for dents, loose bolts, proper ventilation, anchoring and grounding. 2. The inside of the transformer shall be cleaned and all electrical terminations will be checked for signs of overheating and proper tightness. 3. Insulation resistance tests of each transformer winding will be performed, where possible and the results recorded. 4. Turns ratio test shall be performed and recordings documented. SWITCHGEAR AND STRUCTURE 1. After power shutdown, the entire switchgear interior will be thoroughly cleaned. 2. Exposed bus connections will be checked for proper tightness. 3. All of the bus insulators will be thoroughly cleaned and visually inspected for cracks and chips. 4. All control switches, auxiliary relays, and devices will be cleaned, lubricated (if applicable), and checked for proper operation. 5. All disconnect switches will be cleaned, lubricated, adjusted and an anti-oxidant grease applied to the contacts. 6. The lightning arrestors will be cleaned and subjected to an insulation resistance test. Results will be recorded. 7. An insulating resistance test of the bus will be performed. Results will be recorded. LOW VOLTAGE AIR CIRCUIT BREAKERS 1. Each breaker will have its inspection covers removed and the breaker will be thoroughly cleaned. 2. All contact surfaces will be cleaned to assure maximum conductance. 3. Anti-oxidant grease will be applied to the breaker s main contacts. 4. Mechanisms will be checked and lubricated. The mechanical operation will be verified. 5. A current equal to 90 and 110 percent of the breaker s trip coil setting will be applied to verify proper pick-up of the tripping mechanism. 6. Primary injection testing shall be performed in order to verify that all long-time, short time, instantaneous and ground fault set points are properly set. Those that are not shall be properly adjusted and retested. Units will be tested by passing multiples of their ratings through each phase of the breaker. The resultant trip-times will be recorded. 7. Contact resistance will be measured and contacts will be adjusted, where possible, for maximum surface contact and pressure. Value of contact resistance tests will be recorded. 8. An insulation resistance test will be performed from each pole to the other two poles and to ground, and the values recorded. 9. On draw out breakers, the breaker carriage and racking mechanism will be cleaned and lubricated. OIL DISCONNECT SWITCHES 1. The switch mechanism will be opened where applicable. 2. The switch contacts will he inspected and cleaned where applicable. 3. The switch s operating mechanism will he visually and manually inspected for wear, operation, binding and then cleaned and lubricated. 4. The switch s insulating fluid will be sampled. tested and fluid levels returned to normal. 5. The complete unit will then be reassembled and tested for proper operation. 6. The contractor will clean up any and all oil lost during sampling. 7. Insulation resistance tests will be performed where accessible and results recorded. MOLDED CASE CIRCUIT BREAKERS (ELECTRICAL TEST) 1. Each molded case circuit breaker will be inspected in its enclosure for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. 4. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 5. Primary injection testing shall be performed in order to verify that all of the manufacturers curve characteristics; such as long time pick-up and delay, short time pick-up and delay, ground fault pickup and delay and instantaneous pick-up points, are all properly set. Those that are not shall be properly adjusted and retested. 6. Contact resistance will be measured and the results recorded. 7. An insulation resistance test will be performed and the results recorded. 8. The breakers with instantaneous trip units, with a cable connection capability, will be tested. 9. The breaker s trip time will then be compared to the manufacturer s characteristic curve. MOLDED CASE CIRCUIT BREAKERS (MECHANICAL TESTS) 1. The molded case circuit breakers will be inspected in their enclosures for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 4. The breaker will be mechanically exercised and lubricated. 5. Mechanically trip all circuit breakers equipped with push to test capabilities 6. Where possible, contact and insulation resistance will be measured. Results will be recorded. PROTECTIVE RELAYS 1. Relays in draw-out cases will be removed from the case and thoroughly inspected, cleaned and tested. 2. The disks, target rockers and similar moving parts will be inspected. 3. The interiors of draw-out cases will be cleaned, the covers cleaned and the gaskets inspected. 4. The relays will then be electrically tested with current or voltage as required in accordance with the manufacturer s procedures. Relays with characteristic curves will be tested at three tap or pick-up multiples (of found settings). 5. The targets and seal-in units of all relays will be tested to assure proper operation. 6. The relay circuit will be tested to assure that the relay will respond to primary voltages or currents as appropriate. 7. Test tripping of circuit breakers will be performed where an outage can be arranged. INSTRUMENTATION CALIBRATION 1. Examine all devices for damage and wire connection tightness. 2. Perform a calibration test on all meters using a standard and power supply to determine accuracy at each cardinal point. 3. On meters supplied with transducers, the calibration will be performed from the transducer. 4. All instrument multipliers will be verified. 5. Meter selector switches will be inspected for proper application and operation. WATT HOUR METER CALIBRATION 1. Visual and mechanical inspection: Examine all devices for mechanical or electrical damage and wire connection tightness. Check conditions of meter face and face gaskets. 2. Electrical tests: Check calibration of all meters at five points using full scale test instruments. Calibrate watt-hour meters to one-half percent (0.5%). Verify all instrument multipliers. Meter selector switches will be inspected for proper application and operation. TRANSFORMER & CIRCUIT BREAKER INSULATING OIL The insulating fluids will be sampled and tested from each oil-filled device. Sample containers will be new, sealed and opened only immediately prior to filling. Sampling of oils will be accomplished in accordance with ASTM D-923 and sampling of askarels will be done in accordance with D-1809. The oil samples will be returned to the laboratory and tested for the following: TEST DESIGNATION TEST METHOD 1. Color/Visual ASTM Dl 500-D2 1 29/D 1524 2. Dielectric Breakdown ASTM D877 3. Neutralization Number ASTM D974 4. Specific Gravity ASTM D1298 5. Moisture Content ASTM D1533 6. Dissolved Gas in Oil Analysis (500k VA and up) Required Qualifications of Testing Organization and Personnel: The testing firm shall be an independent testing organization, which can function as an unbiased testing authority, professionally independent of any manufacturer, or supplier of equipment or systems evaluated by the testing firm. The testing firm shall meet the criteria for full membership or be a full member company of the InterNational Electrical Testing Association. Proof of this membership is to be included with the proposal package. The testing organization that is employed under this contract shall have been regularly engaged in the testing of electrical materials, devices, installations and systems for a minimum of five years. Proof of this experience is to be included with the proposal package. All work under this contract shall be performed under the supervision of the testing organization s Professional Engineer who will be available to discuss any and all procedures used to test, survey, report and service the equipment required under this contract. Testing, inspection, calibration and adjustments shall be performed by Field Engineers/Technicians certified by the National Institue for Certification in Engineering Technologies (NICET) and/or the International Electrical Testing Association (NETA) and have a minimum of five years of experience inspecting, testing and calibrating electrical distribution equipment, systems and devices. Proof of experience is to be included with the proposal package. The testing organization shall only utilize field engineers and technicians who are regularly employed by the firm or testing service. The testing organization shall submit the names, certification numbers and resumes of the Registered Professional Engineer, the lead Field Engineer/Technician and all other Field Engineers/Technicians who will be performing tests and inspections under this contract. This information is to be included with the proposal package. Test assistants and apprentices may be assigned to the project as assistants to certified Engineers/Technicians at a ratio not to exceed one certified Engineer/Technician to one non-certified assistant or apprentice. The testing organization shall have a calibration program, which assures that all test instruments are calibrated in accordance with the International Electrical Testing Association (NETA). The accuracy shall be directly traceable to the National Institute of Standards and Technology (NIST). Up to date calibration labels shall be visible on all the test equipment or that equipment will not be allowed to be used under this contract. Equipment List: The following equipment needs to be added or removed for 2023: 148 HE panel (add) New MRI (add) OR HE Panel (add) Building 159 (remve breakers but keep transformer) Building 152 (remove) will need to add new gear associated with building 44 B1dg# Equipment Type Quantity Rating 11O/11OA Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels 2 Transformer 500 KVA (pad mount) Transformer 1000 KVA (pad mount) 1 Transformer 1500 KVA (pad mount) 1 11OA ED Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case w/ Micrologic (main) 1 1000 Amp Molded Case w/ Micrologic 1 450 Amp Molded Case 1 400 Amp Molded Case 3 225 Amp Molded Case 1 200 Amp Molded Case 1 175 Amp Molded Case 3 150 Amp Molded Case 3 110 Amp Molded Case 1 100 Amp Molded Case 1 70 Amp Transformer 300 KVA (dry type) 1 ER Switchboard Square D Molded Case w/ Micrologic 1 1000 Amp Molded Case 1 600 Amp Molded Case 2 400 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 200 Amp Molded Case 2 150 Amp Molded Case w/Micrologic 1 150 Amp Molded Case w/Micrologic 4 110 Amp Molded Cade w/Micrologic 1 600 Amp MPD1 (one) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 2000 Amp Molded Case w/Micrologic 1 1000 Amp Molded Case w/Micrologic 3 300 Amp Molded Case w/Micrologic 1 250 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 1 200 Amp Molded Case w/Micrologic 14 150 Amp Molded Case w/Micrologic 2 125 Amp Molded Case w/Micrologic 4 100 Amp MPD2 (two) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 4000 Amp Molded Case w/Micrologic 6 400 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 3 200 Amp Molded Case w/Micrologic 12 150 Amp Molded Case w/Micrologic 1 125 Amp Molded Case w/Micrologic 2 100 Amp 11OB Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Panels 3 Transformer 1000 KVA 3 Switchboard 1(one) G.E. Plug-ins Molded Case TQL 1 100 Amp Molded Case TQL 1 400 Amp Molded Case TQL 4 600 Amp Molded Case TQL 1 2000 Amp Molded Case TQL 1 1000 Amp Switchboard 2 (two) G.E. Plug-ins Molded Case TQL 4 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 2000 Amp Switchboard 3 (three) G.E. Plug-ins Molded Case TQL 2 225 Amp Molded Case TQL 2 300 Amp Molded Case TQL 4 400 Amp Molded Case TQL 1 600 Amp Molded Case TQL 1 2000 Amp Emergency Panel Board 1 (one) HE Molded Case TQL 2 250 Amp Molded Case TQL 3 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 1200 Amp 146 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1500 KVA 1 Switchboard G.E. AV-Line Volt Meter 1 Ammeter 1 Ground Break System 1 AKW Breaker (main) 1 2000 Amp Versatrip Breaker 1 600 Amp Versatrip Breaker 1 300 Amp Versatrip Breaker 1 150 Amp 116 Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels Transformer 500 KVA (pad mount) 1 Transformer 150 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 4 400 Amp Molded Case 2 225 Amp Molded Case 9 200 Amp Molded Case 3 150 Amp Molded Case 2 30 Amp 148 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1000 KVA (pad mount) 1 Switchboard G.E. AV-Line Voltmeter 1 KWH Meter 1 Ammeter 1 Power Break Breaker (main) 1 1200 Amp Power Break Breaker (auto transfer) 1 200 Amp Versatrip Breaker 3 600 Amp Versatrip Breaker 6 300 Amp Versatrip Breaker 1 400 Amp 129 Switchgear Structure Transformer 300KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 3 400 Amp Molded Case 1 600 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 150 Amp Molded Case 1 100 Amp 15 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 300 KVA 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 600Amp Molded Case 1 300 Amp Molded Case 1 225 Amp Molded Case 1 150 Amp Molded Case 2 100 Amp Molded Case 4 50 Amp 159 Switchgear Structure Transformer 150 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 2 800 Amp Molded Case 2 225 Amp Molded Case 2 150 Amp Molded Case 1 100 Amp 151 Switchgear Structure Transformer 300 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1000 Amp Molded Case 2 600 Amp Molded Case 2 225 Amp 152 Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Pane1 1 Transformer O KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 2 800 Amp Molded Case 3 400 Amp Molded Case 1 225 Amp Molded Case 3 200 Amp Molded Case 1 30 Amp 154 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 1 800 Amp Molded Case 2 700 Amp Molded Case 1 600 Amp 155 Switchgear Structure Transformer 500 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 2 600 Amp 156 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 1 1000 Amp Molded Case 2 400 Amp Molded Case 1 350 Amp Molded Case 3 200 Amp Molded Case 2 60 Amp Molded Case 1 40 Amp Molded Case 1 30 Amp 158 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 135 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 500 KVA (pad mount) 1 Switchboard Square D Molded Case (main) 1 800 Amp Molded Case 1 400 Amp Molded Case 1 300 Amp Molded Case 2 200 Amp Molded Case 1 100 Amp Molded Case 1 90 Amp Molded Case 2 40 Amp Molded Case 1 30 Amp Molded Case 1 15 Amp 137 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard ITE Voltmeter 2 KWH Meter 2 Ammeter 2 Rack In Breaker (main) 1 2500 Amp Rack In Breaker 3 800 Amp Rack In Breaker 4 400 Amp Rack In Breaker 10 225 Amp Rack In Breaker 1 200 Amp Rack In Breaker 1 40 Amp 139 Switchgear Structure Medium Voltage Vault 1 Rack In Breaker (ITE 5kV) 10 Time Overcurrent Relays 32 Voltmeter 10 Ammeter 10 Control and Instrument Switches 9 144 Switchgear Structure Molded Case 1 800 Amp Molded Case 1 400 Amp 113 Switchgear Structure (Eaton) Molded Case Breaker 7 225 Amp Molded Case Breaker 1 600 Amp Molded Case Breaker 2 400 Amp Molded Case Breaker 3 200 Amp Transformer 112.5KVA (pad mounted) 1 Transformer 30KVA (suspended) 2 Transformer 75KVA (suspended) 1 Transformer 15KVA (suspended) 1 Formal Reports: The testing organization shall submit three copies of the Comprehensive Inspection and Testing report (through the Prime Contractor if applicable) to the COTR within 30 calendar days following the conclusion of testing. The report shall be itemized by building and shall include, at a minimum, complete nameplate data, age, maximum loading in amperes (where applicable), and the condition as found and as modified for each piece of equipment and device tested. Notification in writing shall be submitted immediately to the COTR upon completion of testing for any equipment or component deemed to be in a critical state including recommendations for corrective action. A Registered Professional Engineer shall make certification.
59%
Solicitation11/10/2026
This Presolicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. The Presolicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2024-02 published in the Federal register December 22, 2023. This solicitation is for a Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 Million Dollars. The FSC/PSC is J061 (Maintenance, Repair, and Rebuilding of Equipment-Electric Wire and Power Distribution Equipment).
59%
Pre-Solicitation11/10/2026
The purpose of this amendment is to provide answers to the questions received prior to the cutoff date. In addition to providing answer to the questions, a site visit is also set for 0900 on Tuesday 27 October 2026 at the Louis Stokes Cleveland VA Medical Center 10701 East Boulevard, Cleveland, Ohio 44106-1702. We will meet at the information desk, first floor of the Atrium. This is directly across from the parking garage. Is this a new requirement or a recompete? If a recompete, please identify the incumbent contractor, the previous contract number, and the prior contract value. The final option year of the previous contract 36C25022F0010 has expired. Can prior test reports (most recent tri-annual cycle, IR survey, oil analysis) be provided to help establish equipment condition and test history? Prior test reports will not be shared outside of authorized staff. What is the estimated contract value or funding range for this requirement? This is not a construction requirement and therefore we do not have a project magnitude. The circuit breaker testing schedules for Option Year 1 (November 1, 2027 October 31, 2028) and Option Year 4 (November 1, 2030 October 31, 2031) appear to omit the quantity column shown in the other annual schedules. Could the Government provide revised schedules identifying the quantities for each listed circuit breaker in these two option years? Edited spreadsheet for breaker listing provided below. The SOW identifies working hours of 7:00 a.m. 11:30 p.m. Monday through Friday and 6:00 a.m. 6:00 p.m. Saturday and Sunday when maintenance requires an electrical power interruption. However, we could not locate an equipment schedule distinguishing Normal (Monday Friday) equipment from Critical (Saturday Sunday) equipment. Could the Government provide this classification or confirm how contractors should determine which equipment requires weekend work for pricing purposes? Any work that requires power to be interrupted will be completed on Sunday s, during daylight hours. Work that does not require power interruption, i.e. IR scan or transformer oil samples can be completed M-F during normal working hours. The section requires electrical contracting to be the primary specialty of the contractor's business and references properly trained and licensed permanent staff. Would the VA consider a qualified small-business prime contractor that provides contract management, coordination, quality assurance, and oversight while utilizing an experienced electrical testing subcontractor with the required NETA certifications, licensed personnel, equipment, and relevant past performance? This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations. Technician certification equivalence: the statement of work requires technicians certified to NETA standards or an equivalent certifying organization. Would NICET-certified technicians performing testing to the latest NETA MTS standards be accepted as equivalent for this requirement? NICET-certified technicians may be accepted as meeting the "equivalent certifying organization" requirement, provided the certification is in a relevant electrical testing, maintenance, or power-distribution-related subfield and the individual possesses the knowledge, training, and experience necessary to perform the testing, inspection, maintenance, and troubleshooting activities required under this contract. Consistent with the SOW requirements, personnel performing the work shall have a minimum of five (5) years of relevant documented experience and shall perform all testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Additionally, NICET Level III or higher in an applicable electrical power testing or power distribution discipline will be considered equivalent to the NETA certification requirement. Additionally, would the VA consider the subcontractor's technical qualifications and past performance when evaluating the prime contractor's technical capability? This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While subcontractors may be utilized as permitted by the solicitation, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Evaluation of technical capability and past performance will be conducted in accordance with the evaluation criteria specified in the solicitation. Finally, please confirm which limitation on subcontracting applies to this procurement under NAICS 238210. The NAICS for this requirement is 238210 Offer due date: The SAM.gov notice header lists a response date of October 19, 2026, but the solicitation text says quotes are due October 23, 2026 at 3:00 PM ET. Please confirm which date and time govern. SAM was corrected within 4 hours of the posting to reflect 10/23/2026 at 15:00 which matches the solicitation that was posted. Period of performance: The SOW lists a base year of November 1, 2026 through October 31, 2027, plus four option years. Please confirm the anticipated award date that supports a November 1 start. The current need is to start 11/1/2026. The period of performance will start as soon as possible if not on 11/1/2026. The SOW requires NETA-certified technicians "or equivalent." Please confirm whether the certification may be held by the subcontractor's technicians doing the testing, and which other certifications are acceptable as equivalent. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary testing, inspection, maintenance, and troubleshooting activities required under this contract. The use of qualified subcontractors is permitted; however, the prime contractor shall maintain an active onsite role and directly perform a substantial portion of the work with its own qualified personnel. The prime contractor's role shall not be limited solely to contract administration, project management, quality assurance, or oversight functions. For personnel qualification purposes, NETA-certified technicians are acceptable. As an equivalent certification, the Government will accept NICET Level III or higher certification in an applicable electrical power testing or power distribution discipline, provided the technician has a minimum of five (5) years of documented relevant experience and performs testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Limitations on subcontracting: The solicitation includes FAR 52.219-14. Please confirm that the services limit applies (no more than 50% of the amount paid may go to subcontractors that are not similarly situated). Yes the clause applies to this requirement. Payment: The solicitation includes clause 52.232-90 Fast Payment Procedure, which covers supply deliveries. Please confirm how invoicing will work for this service: after each testing event is completed and accepted, or monthly in arrears. Invoice upon completion, not more than Monthly. The evaluation weighs technical capability and requires references. Is there a prescribed format or minimum number of references quoters should submit, and should the references be healthcare or VA facility electrical testing work? The relevance of references, due to the complexity of performing electrical testing, maintenance, and outage activities within an operating healthcare environment, the Government recommends that offerors provide references demonstrating experience performing work of similar scope, complexity, and operational criticality whenever available. References involving healthcare facilities, VA medical facilities, or other mission-critical facilities are preferred but are not required. Please clarify whether the equipment quantities listed on Page 20 of 65 under Infra-Red Line Items for Inspection are also included in the testing and maintenance scope, or whether the listed equipment requires infrared inspection only. If testing and maintenance are required, please provide the equipment type and voltage level for each item. The equipment listed under "Infra-Red Line Items for Inspection" is included for infrared inspection purposes only under Section 5.4 and is not included in the testing and maintenance scope unless specifically identified elsewhere in the SOW. Accordingly, no additional equipment type or voltage information is required for these line items. Please confirm whether protective relay testing is required under this solicitation. If so, please provide the quantity, manufacturer, model, and voltage level for the protective relays to be serviced. Yes. Protective relay testing is included under this Statement of Work. Specifically, Section 5.5, "Medium Voltage Relay Testing," requires the contractor to inspect, clean, test, calibrate, and maintain adjustable protective relays. The protective relays to be serviced are associated with the facility's 11 kV switchgear and consist of approximately 37 relays. The manufacturer is Schweitzer Engineering Laboratories (SEL). Known relay models include: SEL-351 SEL-587A SEL-551 Voltage Level: 11 kV. Offerors should base their proposals on the testing, calibration, inspection, and maintenance of these protective relays as required by the SOW. Please clarify whether the cost of replacing or refilling transformer cooling liquid is the responsibility of the contractor or the VA. If it is the contractor s responsibility, please provide a cost allowance for this work. Yes. Replacement or refilling of transformer cooling liquid shall be the contractor's responsibility when testing indicates the liquid no longer meets the manufacturer's specifications, as required by the SOW. No separate cost allowance will be provided by the Government, and offerors shall include all costs associated with this requirement in their proposal. The facility currently has four (4) oil-filled transformers with approximate oil capacities as follows: Energy Center Transformer: 704 gallons Research Transformer: 292 gallons Penthouse Transformer #1: 151 gallons Penthouse Transformer #2: 151 gallons The most recent transformer oil sample testing did not recommend oil replacement for any of these transformers. Copies of recent oil sample reports may be provided upon request. Please confirm if the permitted working hours, including shutdown hours, for this contract will be after business hours or from Monday through Friday, 7:00 a.m. to 11:30 p.m. or Saturday and Sunday, 6:00 a.m. to 6:00 p.m. Work requiring electrical power interruptions and planned shutdowns is anticipated to occur on assigned Sundays during daylight hours. Specific outage dates and work schedules will be coordinated by the Government based on facility operational requirements and the impact of the outage on medical center operations. Work activities that do not require interruption of electrical service may be performed during the normal operating hours identified in the SOW. Please provide the quantity of battery systems requiring inspection, testing, and maintenance under this solicitation. The solicitation includes one (1) medium-voltage switchgear battery backup system and charger requiring inspection, testing, and maintenance. Battery system details are as follows: Quantity: One (1) battery system Application: Medium-voltage switchgear control power system Manufacturer: ALCAD Configuration: 96-cell battery bank Nominal Voltage: 129 VDC Battery Model: XHP130 The contractor shall perform inspection, testing, and maintenance of this battery system in accordance with the requirements of the Statement of Work. Please confirm whether Automatic Transfer Switches (ATSs) are included in the required testing and maintenance scope. If so, please provide the quantity, their rated power, and clarify whether testing is required annually or once every three years. Automatic Transfer Switches (ATSs) are included in the infrared inspection requirements of this contract. Infrared inspections, including ATS infrared inspections, shall be performed annually in accordance with Section 5.4 of the SOW. ATS testing, maintenance, and repair are not included in the scope of this SOW and are covered under a separate maintenance agreement. Therefore, ATS quantities, ratings, and testing frequencies for maintenance and testing purposes are not applicable to this solicitation. Can you provide the one-line diagram of the facility and the previous electrical study report? Facility power diagrams will not be shared outside of authorized staff. Is there a required format, page limit, or volume structure for the technical and price quotes? The solicitation states that failure to follow the document format will render a quote non-responsive. Submission must be complete and contain an appropriate level of detail to allow the evaluator to determine technical acceptability and Compliance with the RFQ. Please confirm that "tri-annual" means once every three years (triennial), with the equipment rotating per the Section 5.10 lists (Base/OY3, OY1/OY4, OY2). Correct. For the purposes of this SOW, "tri-annual" means once every three (3) years. Equipment identified in Section 5.10 is tested and maintained on a three-year rotational schedule as outlined in the Base Year/Option Year 3, Option Year 1/Option Year 4, and Option Year 2 equipment lists. Several items lack kVA ratings (Surgery transformers, Parking Garage oil transformer). Please provide kVA and voltage ratings. Please also confirm the EC1 MV switch quantity shown as "6-Jun" in the Option Year 3 list. EC1 MV switch quantity = 1 Surgery Sub 1,000 kVA Parking Garage 300 kVA What is the medium-voltage service level (e.g., 5 kV, 15 kV), and how many MV switches, relays, and battery systems are in scope? The medium-voltage distribution system covered under this solicitation operates at 11 kV. The equipment currently in scope includes: Medium-Voltage (MV) Switches: 33 Protective Relays: 37 Schweitzer Engineering Laboratories (SEL) protective relays Battery Systems: One (1) medium-voltage switchgear battery backup system Offerors should base their proposals on the inspection, testing, maintenance, and related services associated with the above equipment. Section 5.2 covers breakers 400A and above, but the lists include breakers below 400A (e.g., 100A 300A MCCBs). Are breakers under 400A in scope for testing? Circuit breakers rated below 400 amps are not included in the testing requirements of Section 5.2. Breakers rated below 400 amps that are listed and located within distribution equipment containing breakers rated 400 amps and above shall be manually exercised during the maintenance activity but are not required to undergo testing. The IR line item list skips items 157 163. Are these intentionally excluded or missing? Appears to be a numbering error where equipment has been added or removed during unrelated construction projects. Section 5.4 states problem connections shall be replaced or tightened. Is connector replacement included in the firm-fixed price, or handled as an out-of-scope repair? Please define "basic repair." Connector replacement required under Section 5.4 is included in the firm-fixed-price scope. "Basic repair" refers to minor corrective actions that can be completed without additional material costs beyond incidental consumables and without extending the scheduled work effort. Any repair involving replacement of equipment other than connectors, significant additional labor, or material costs not contemplated by the SOW will be considered out-of-scope work. For liquid-filled transformers, is fluid replacement and refill (and disposal of used oil) included in the fixed price or treated as additional work? Fluid replacement, refill, and disposal of used oil, when required based on testing results, are included within the firm-fixed-price scope of this contract and are the contractor's responsibility. As specified in the SOW, liquid-filled transformers shall have the cooling liquid tested and replaced when testing indicates the liquid no longer meets the manufacturer's specifications, and the transformer shall be refilled to the manufacturer's specified levels. ** Section 5.9 notes that if breaker or ATS settings are not available, the contractor may conduct a study. Is a coordination study in scope for pricing? Are current coordination and arc flash studies available? The most recent coordination study and arc flash study will not be shared outside of authorized staff. Offerors shall base their pricing on the information provided by the VA. Any additional coordination or arc flash studies performed by the contractor shall be at the contractor's expense and at no additional cost to the Government. Section 5.8 (4-hour outage test, 2029): please identify the local utility provider and confirm the services the contractor is expected to pay for. The planned outage is expected to occur between 7:30 a.m. and 11:30 a.m. on the assigned Sunday. The contractor shall include in its firm-fixed-price proposal onsite support from 7:00 a.m. to 3:00 p.m. to provide emergency response, troubleshooting, and technical support for power-distribution equipment covered by this SOW. A NETA-certified technician, qualified to troubleshoot and support the equipment included in this SOW, shall be onsite for the duration of the scheduled outage and restoration period. Should the outage extend beyond the planned 4-hour duration due to a malfunction of power-distribution equipment, the contractor shall continue to provide troubleshooting and technical support necessary to assist the Government in restoring electrical service. The Government will coordinate the outage with Cleveland Public Power and will be responsible for all utility-provider fees and outage-related costs. The contractor shall not be responsible for the cost of replacement parts, materials, or repairs that require work outside the scope of this contract. Any such work shall be handled in accordance with the contract provisions for additional work and shall require Government approval prior to execution. The Inspection and Acceptance section references "monthly inspection" and "response to service call." Neither appears elsewhere in the SOW. Are monthly inspections or emergency service calls required? If so, what are the response times? This requirement is not applicable to this solicitation. The references to "monthly inspection" and "response to service call" in the Inspection and Acceptance section were included in error and will be removed from the SOW. No monthly inspections or emergency service-call response requirements are included under this contract. The deliverables table lists ">30 days" and "14 days," while Section 6 requires reports within 7 days. Please clarify the required report turnaround times. The report turnaround times identified in the Deliverables table shall govern. The requirement in Section 6 stating that reports must be submitted within seven (7) days was included in error and will be corrected in the SOW. Contractors shall adhere to the report submission timelines specified in the Deliverables table. How many planned outages/shutdowns will be allowed per year, and will work requiring de-energization be limited to weekends (6 AM 6 PM)? Will VA perform switching and lockout, or is the contractor responsible? Planned outages will be scheduled as required to support the testing and maintenance activities identified in Section 5.10. Multiple pieces of equipment may be combined and tested during a single outage or testing day when determined to be beneficial to the Government. The exact outage schedule for each contract year will be determined by facility operational requirements, equipment availability, and the impact of the outage on medical center operations. When de-energization is required, outages are anticipated to occur on assigned Sundays during daylight hours. Specific dates and outage durations will be coordinated by the Government. The VA will perform all switching operations and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements. Will VA staff be available to support switching and load transfers during testing? VA staff will perform all switching operations, load transfer, and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements. Are there any background investigation, PIV badge, or TB/vaccination requirements for contractor personnel? Contractor will need to complete background investigation and be issued a contractor badge. Please confirm the contract type is firm-fixed-price. Yes this will be awarded as a firm fixed-price contract. Please provide the applicable Service Contract Act wage determination for Cuyahoga County, OH. Service Contract Act WD #: 2015-4727 Please confirm whether 52.219-9 (Small Business Subcontracting Plan) applies, given the 100% small business set-aside. After further review 52.219-9 will not apply to this requirement. Section 52.212-2 references past performance, but the listed evaluation factors are Technical Capability and Price. Will past performance be evaluated as a separate factor? CPARS will be reviewed for negative past performance. Qualifications and experience: Under SOW Sections 7(C) (F) and 14(B) (C), may the electrical-contracting specialty, permanent licensed technical staff, technician certifications, and required experience and references be demonstrated through the proposed performing subcontractor? Or must the prime contractor independently satisfy those requirements? We understand that all applicable limitations on subcontracting would still need to be met. This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations. Evaluation of offeror qualifications and experience will be conducted in accordance with the solicitation requirements and evaluation criteria. Are you able to provide the equipment list for the hospital? The equipment included in the scope of this contract is identified in Section 5.10 and other applicable sections of the SOW. No separate equipment list will be provided. Offerors should use the information contained within the SOW for proposal preparation. Are you able to provide the most recent inspection and/or maintenance report? Prior test reports will not be shared outside of authorized staff. Can the Government clarify what constitutes minor repairs included in the fixed-price requirement versus repairs requiring a separate contract modification? Minor repairs are those corrective actions that are incidental to the testing, inspection, and preventive maintenance services specifically identified in the SOW and that can be completed as part of the scheduled maintenance effort without requiring replacement of major equipment or components. Examples include tightening electrical connections, torquing hardware, cleaning, lubrication, adjustment, calibration, minor housekeeping activities, and similar corrective actions identified during testing and inspection. The SOW expressly includes "onsite testing, inspection, minor repair, and housekeeping" as part of the required services. Repairs that exceed basic or minor repair, including major component replacement, equipment refurbishment, or other work outside the defined maintenance and testing scope, shall not be performed under the fixed-price requirement. The contractor shall submit a cost estimate and scope of work to the COR for review and routing to the Contracting Officer (CO). Such work requires CO approval and may require a separate order/contract or contract modification and funding authorization before performance. As stated in the SOW, "In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation."
59%
Combined Synopsis10/30/2026

Additional Details

Solicitation Number

70ZH1526QCGA00009

Archive Date

Nov 27, 2026

Office Address

New London, CT, 06320