GovChime
Notice ID: 5abe08f711914d07bff43c0b105ec8c4Solicitation

USAID/Egypt Facility Operations, Custodial and Supply Management (FOCS)

Archived on June 15, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC+02:00
Posted
May 21, 2021
Notice type
Solicitation
NAICS
561210: Facilities Support Services
Agency
Agency for International Development

Notice details

Office
USAID/EGYPT
Place of performance
Cairo
Last updated
Dec 4, 2025

Identifiers

Solicitation number
72026321R00002
Notice ID
5abe08f711914d07bff43c0b105ec8c4

Description

The purpose of the amendment is to: 1. Add attachments J.8, J.9, J.10, J.11, J.12, J.13 and J.14 to section J of the RFP. 2. Answer questions received regarding this RFP No. 72026321R00002. 3. Provide a conformed version of the RFP where all additions and/or revisions are highlighted in orange. Please see the attached conformed version of the RFP for details The objective is to obtain services for the U.S. Agency for International Development Mission in Egypt as follows: Operational and maintenance services to USAID/Egypts office building which include: maintaining and servicing building operation systems including equipment and security caravans within the drop bar area, procurement of maintenance related supplies and on a limited basis, similar maintenance on Mission Directors Villa in Maadi. Oversight of utilities payment for the office building and residences, submitting all required requests/complains to the GOE including but not limited to utilities and other requests like trees cutting, removing the trees branches and following up on the requests, maintenance of facility equipment, furniture repositioning, and other related tasks as further defined in the performance work statement. Custodial and gardening services for USAID/Egypt office building. Small Scale Expendable Property (EXP) management, office mail delivery, document reproduction and records management.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:72026321R00002
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    SolicitationCurrentApr 22, 2021

    USAID/Egypt Facility Operations, Custodial and Supply Management (FOCS)

    Notice 5abe08f711914d07bff43c0b105ec8c4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
See attached. Limited Sources FAR GSAR 538.7104-3(b)(1)(ii) (and FAR 8.401(b) This justification is for the Consumer Product Safety Commission (CPSC), Office of Procurement Services. CPSC awarded 61320627F0007 to EMCOR Government Services, on a sole-source basis for specialized office renovations. CPSC requires specialized office renovations in the U.S. Government Accountability Office (GAO) building. The total estimated value of the award is $436,996.41 which includes the necessary renovations to prepare offices for employees. Only one source is capable of providing the supplies or services required, following procedures would result in unacceptable delays. EMCOR is the GSA contractor that provides renovations to the GAO building. They are contracted to complete renovations. The contracting officer has determined that the order represents the best value consistent with 538.7104-3(b)(1)(ii). The price is deemed fair and reasonable based on Federal Supply Schedule Contract: 47QSHA19D0044 In accordance with FAR 8.404(d), the General Services Administration (GSA) has already determined the prices of supplies and fixed-price services under Federal Supply Schedule contracts to be fair and reasonable. This justification will be posted to SAM.gov within 14 days of award. The requirement cannot be modified to enhance competition, because the proposed contractor is the only one who can provide the renovations. The contracting officer certifies that the justification is accurate and complete to the best of the contracting officer’s knowledge and belief. Technical personnel who provided supporting data, which forms the basis for this justification have certified that the information is complete and accurate. The contracting officer has determined that the circumstances at FAR 538.7104-3(b)(1)(ii) apply to this acquisition.
-Sole Source / J&AOpen
12 November 2026 - Amd 0002 - Extend due date (see attached files). --------------------------------------------------------------------------------------- 6 November 2026 - Amd 0001 - Q&As posted (see attached files). --------------------------------------------------------------------------------------- The 49th Contracting Squadron (49 CONS) at Holloman AFB is soliciting proposals for Vertical Transportation Equipment (VTE) Maintenance, Repair, and Inspection Services. The Contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect the real property VTE at Holloman AFB to ensure continuous and safe operation. Services are "full maintenance" as described in the Performance Work Statement (PWS) Paragraph 1.0, with the exception of the specific exclusions identified in Paragraph 2.0 (such as alterations, vandalism, and cosmetic interior cleaning), which will be handled as Over and Above (O&A) work. See PWS for full requirements. All services shall be performed on-site at Holloman Air Force Base, New Mexico (NM). DO NOT PRICE O&A Work Contract Line-Item Number (CLIN). This CLIN will be funded as needed and approved IAW PWS Para 2.0 and Appendix D & E. The contractor will be responsible for maintaining and inspecting fifteen (15) VTE units. The complete workload is detailed in PWS Appendix A. Contractor is not responsible for maintaining or inspecting decomissioned unit. IAW DoDI 1100.22 and R-DFARS Clause 252.237-7023, the Government has designated VTE services as essential. Offerors are required to submit a written Mission-Essential Contractor Service Plan with their proposals detailing how uninterrupted services will be maintained during a crisis. It is asked to review all attachments carefully and completely, to include entirety of SF1449. IAW RFO 5.101(d), Timing, the following information is provided to combine the Presolicitation Notice with this solicitation: Point of Contact (POC) / Contracting Officer (CO): Ms. Sally D. Roberts, at sally.roberts@us.af.mil or (575) 572-5293 AND Contract Specialist: Alex Coulombe, at alex.coulombe@us.af.mil or (575) 572-0183. Set-Aside: Total Small Business Codes: PSC: J039 NAICS: 561210 Description: Maintenance and repair of fifteen (15) VTE units at Holloman AFB, NM. See above description and attachments for more information. SUBMISSIONS: Evaluation: This award will be made based on Lowest-Priced Technically Acceptable (LPTA). See SF1449 for full evaluation criteria (see Evalutaton Factors for Award). Submission Channel: Send proposals to the Contracting Officer (CO), Ms. Sally D. Roberts, at sally.roberts@us.af.mil, Contract Specialist, SSgt Alex C. Coulombe, at alex.coulombe@us.af.mil, and Alternate Contract Specialist, SrA Raymond Arbouet-Banton, at raymond.arbouet-banton.ca@us.af.mil. Questions and Answers: All questions must be submitted in writing to the Contracting Officer and Contract Specialists, no later than 4 November 2026, 08:00 AM MST. Questions will be answered promptly (expected NLT COB (4:00 PM MST) 6 November 2026). Submission: Proposals must be submitted in writing, via email, to the Contracting Officer and Contract Specialists, no later than 12 November 2026, 11:11 AM MST. Site Visit: No site visit will be provided. Pre-award Conference (via TEAMS): November 24, 2026 Performance Start Date: December 01, 2026 Thank you for your interest in reviewing this solictation. We look forward to seeing your proposals.
-Combined Synopsis11/17/2026
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
-Solicitation11/30/2026
In preparation for the upcoming Ft. Leonard Wood Job Order Contract (JOC) solicitation—with an anticipated award date of December 2027—the Department of Public Works (DPW) and MICC-IRC invite estimating software vendors to present their capabilities. The objective of the presentation is to identify estimating software solutions for consideration in the follow-on JOC requirement. Presentation Guidelines & Parameters: - Presenations are capped at 30 minutes per company - Required Content: Live software demonstration, pricing/fee structures, and a candid overview of product strengths and limitations (Pros/Cons) - Target Presentation Window: Week of 16 November 2026 (prior to the Thanksgiving holiday) Next Steps & Coordination MICC-IRC will coordinate directly with interested vendors to schedule specific presentation dates and times. Please stand by for further scheduling instructions.
-Special NoticeOpen
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
-Pre-Solicitation12/14/2026

Additional Details

Solicitation Number

72026321R00002

Archive Date

Jun 15, 2021

Place of Performance Country

EGY

Office Address

CAIRO, EGY