WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Active, no response deadline listed. Full description on SAM.gov.
Overview
- Posted
- October 20, 2026
- Notice type
- Presolicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 690567 WESTERN FEDERAL LANDS DIV
- Place of performance
- Yellowstone National Park, Wyoming
- PSC
- Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 69056726R000020
- Notice ID
- 721b583f02e14e37abd36de2c32ce683
Description
Update 10/20/2026: QA_10-20-2026.pdf posted to attachments.
Update 10/5/2026: QA_10-05-2026.pdf posted to attachments.
PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
LOCATION: 0.4 miles SW of Mammoth, WY
WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details.
LENGTH: 0.7 miles and parking lot
TENTATIVE COMPLETION DATE: Fall 2028
CONTRACT TYPE: Firm-Fixed-Price Task Order Contract
ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 .
INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
NOTICE OF SUBCONTRACTING OPPORTUNITY
This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.
Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links)
This project is anticipated to be solicited Winter 2026/2027
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (5)
- Download
QA_10-20-2026.pdf
180 KBAdded in Presolicitation version 3Posted - Download
QA_10-05-2026.pdf
179 KBAdded in Presolicitation version 2Posted - Download
PROJECT DESCRIPTION_WY NP YELL 10(24).pdf
247 KBAdded in Presolicitation version 1Posted - Download
Prelim Letter_WY NP YELL 10(24).pdf
229 KBAdded in Presolicitation version 1Posted - Download
yell10-24_Preliminary Plans.pdf
67 MBAdded in Presolicitation version 1Posted
Links (1)
- Link to MATOC informationhighways.dot.govPosted
Lifecycle
- 1Version 1Presolicitation
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
- 2Version 2Presolicitation
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
- 3Version 3PresolicitationCurrent
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Similar Opportunities
Additional Details
Solicitation Number
69056726R000020
Archive Date
Sep 23, 2028
Office Address
VANCOUVER, WA, 98661