GovChime

Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

Overview

Response deadline
5:00 PM PST
Posted
November 10, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
113310: Logging
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Place of performance
Bly, Oregon, 97622
Last updated
Nov 10, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
12363N26Q4181
Notice ID
461987de9ca045bf80c95b270eed80d9

Description

Amendment 004: Posted 11/10/2026: See Attachment/Links for amended documents.

  1.  Extends the Quotes Due Date from 11/16/2026 to 11/20/2026.
  2. Amends C05_12363N26Q4181Corral G-Z IRSC IRSC Solicitation. Page 4: Revises submission of proposal instructions. Page 8: Includes additional information on awarding of Optional Items. Page 58: Amends Quotes Due date from 11/16/2026 to 11/20/2026.
  3.  Amends Appendix A page 5 technicalspecifications for Item 4 and 6. 
  4. Amends Appendix B page 23 to remove specifications.
  5. Amends Attachment 4 Prescriptions pages 3, 4 and 5 to remove specifications.
  6. Includes example of cruise card to be used during implementation of Item 8.

Amendment 003: Posted 11/4/2026: See Attachment/Links for amended documents.

  1. Includes C05_A003_12363N26Q4181_SF30 Amendment
  2. Amends Corral G-Z IRSC IRSC Solicitation pages 6, 8, 18, 19, 41, and 50. 
  3. Replaces Appendix A – Technical Specifications in its entirety. 
  4. Amends Appendix B – Timber Specifications pages 3, 23, 31, and 37. 
  5. Replaces Attachment 2 – Design Features in its entirety. 
  6. Replaces Attachment 4 – Prescriptions in its entirety.
  7. Replaces Corral Cruise in its entirety to reflect the revision to the log table to correct the top DIB to a 6” on all logs. This correction is reflected in the revised product volumes and Minimum Acceptable Quote. 
  8.  Include Site Visit question and answers plus attendees sign in sheet for Site Visit held on October 29th, 2026.

Amendment 002: Posted 10/14/2026 - Revises Pages 5 and 6 of the Solicitation Schedule of Items. Quanties for Item 14, 16 and 21 are revised. Adds Grizzly project area spatial data for "no treatment areas." Replaces Grizzly Treatment Area Map. See attachments for SF30 with amended solicitation pages 5 and 6, spatial data zip file and new Grizzly Project Area Map. 

Amendment 001: Posted 10/06/2026 - Changes Site Visit date from Thursday, October 22, 2026 to Thursday, October 29, 2026. Adds Project Spatial Data zip files. See attachments for SF30 with amended solicitation pages, and spatial data files.

This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.

Solicitation number 12363N26Q4181 is issued as a request for quotation (RFQ).  This project follows the G to Z Integrated Resource Stewardship Contract (IRSC) model which is a unique approach that takes projects from signed NEPA decision and reintroduction of fire on the landscape.

The Corral G-Z Integrated Resource Service Contract directly supports Executive Order 14225, the Immediate Expansion of American Timber Production, Secretary Rollins Memorandum 1078-006 and follows the direction put forth by Acting Associate Chief Chris French in producing timber volume, reducing hazardous fuels, providing wood fiber to struggling industries and supporting local economies surrounding the Fremont-Winema National Forest.

The objectives of this project are 1) to restore forest health and vigor by reverting stand density and species composition to their historical range of variability, while also 2) mitigating the threat of catastrophic wildfire by reducing hazardous fuels. These objectives will be accomplished through the following:

  1. Professional Forestry: Completion of harvest layout, timber marking, timber volume determination and acre determination of harvest unit boundaries, and DxP prescription monitoring.
  2. Logging and Fuels Reduction: Cut and remove an estimated 191,379 tons of commercial timber on approximately 7,000 acres, and fuels reduction on approximately 17,000 acres. Removal will include ground-based logging systems utilizing whole tree yarding, cutting, skidding and decking sub-merchantable trees in plantations, fuel breaks and general stands. Cut and pile encroaching conifers in meadow areas and release cuts in whitebark pine stands.

The associated North American Industrial Classification System (NAICS) code for this procurement is 113310 –logging, with a small business size standard of 500 employees. The product service code is F014. The government will award a Firm-Fixed Price (FFP) contract resulting from this combined synopsis/solicitation to the responsible quoter whose quote, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and shall be valid for 60 days after the date of receipt for the solicitation.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Kasandra Meyer, Acquisition Program Support Officer

Secondary Contact

Documents

Files (28)

  • C05_A004_12363N26Q4181_SF30.pdf

    760 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • C05_A004_12363N26Q4181Corral_G-Z_CruiseCard.pdf

    333 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • C05_A003_12363N26Q4181_SF30.pdf

    235 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181Corral G-Z IRSC IRSC Solicitation.pdf

    303 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181Corral_G-Z_Appendix A_TechSpecs.pdf

    360 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181Corral_G-Z_AppendixB_TimberSpecs.pdf

    161 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181Attachment2_Design Features.pdf

    218 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181Attachment4_Prescriptions.pdf

    271 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181_Corral_Cruise.PDF

    177 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A003_C05_12363N26Q4181Corral Site visit - QA.pdf

    870 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • A002_C05_12363N26Q4181Corral G-Z IRSC Solicitation_pgs5_6.pdf

    127 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • A002_C05_GrizzlyNoTreat.zip

    15 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • A002_C05_RevisedGrizzlyProjectAreaMap.pdf

    943 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • C05_A001_12363N26Q4181_SF30.pdf

    282 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • A001CorralGtoZ_IRSC_FinalUnitPool.zip

    75 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • A001GrizzlyPotentialUnitPool.zip

    218 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04_12363N26Q4181Corral G-Z IRSC IRSC Solicitation.pdf

    1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Corral_G-Z_AppendixB_TimberSpecs.pdf

    1.0 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Corral_G-Z_Appendix C_RoadMtc.pdf

    681 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Corral G-ZTrafficControlPlan.pdf

    184 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Corral_G-ZProjectAreaCAM.pdf

    20 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Corral_G-ZSiteVisitMap.pdf

    655 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181CorralG-Z_FirePlan.pdf

    169 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Attachment1_ForestProductAccountabilityActionPlan.pdf

    2.2 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Attachment3_Logging Plan Summary.pdf

    626 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Attachment5_Project Design Criteria.pdf

    470 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181Attachment6_FSH_FSM_Cruise_AreaDeter.pdf

    11 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04_12363N26Q4181_SCA_WD_1977-0079_83_08132026.pdf

    51 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

    Notice 6f605a456b3843829119ac11e6000264 on SAM.gov

  2. 2
    Version 2Combined Synopsis/Solicitation

    Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

    Notice 1ff21ce63e4843a9a16a21f30ae0530e on SAM.gov

  3. 3
    Version 3Combined Synopsis/Solicitation

    Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

    Notice 4b4ebf887cd14164b4cf549d65805ede on SAM.gov

  4. 4
    Version 4Combined Synopsis/Solicitation

    Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

    Notice e97641820c5e4746a349f42da62a32cd on SAM.gov

  5. 5
    Version 5Combined Synopsis/Solicitation

    Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

    Notice 8c7ce56de0ae4df8b175cc0aedfc9be2 on SAM.gov

  6. 6
    Version 6Combined Synopsis/SolicitationCurrent

    Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

    Notice 461987de9ca045bf80c95b270eed80d9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
26/11/02 Update site questions on October 1, 2026. see attachments: B14 and A15. Sources Sought (SS) / Request for Information (RFI) This Sources Sought / Request for Information (RFI) is issued solely for market research and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. The Government will not reimburse accompanying costs. Any answers or attachments provided are based upon the best information available at the time of the visit and are subject to change. 1. Background & Purpose USDA Forest Service seeks capability statements from qualified vendors able to conduct fuels reduction on steep and rugged terrain within Bozeman Municipal Watershed Project area for the anticipated Leverich Helio Stewardship IRSC. The purpose of this SS/RFI is to gather information on vendor capabilities, invite prospective vendors to an organized site visit on 10/01/2026, and to view the area before snow limits access. 2. Anticipated Scope of Work Cut and removal of approximately 290 CCF of Lodgepole pine sawtimber 2045 CCF of Douglas-fir and other Sawtimber on 151 acres. Whole-tree Helicopter yarding of included timber. Piling of slash at the landing area. Road Decommissioning of .59 miles of existing Temporary Road Use Permit (TRUP) roads post-hauling. 3. Place of Performance The Leverich Helio Stewardship IRSC project is located in the northern Gallatin Mountain Range, just south of Bozeman, MT. Helicopter units are located on the west side of FS Road #979, along Bozeman Creek and adjacent to City of Bozeman land. 4. Period of Performance Anticipated start date: Late Spring/Early Summer 2027. Period of performance is estimated to not exceed two operational seasons and is dependent on weather, access, and coordination. 5. Site Visit An organized site visit will occur on Thursday, October 1, 2026, at 10:00 a.m. MDT. Interested parties will meet at the Bozeman Ranger District located at 3710 Fallon St. Suite C. Bozeman, MT 59718. Interested parties should contact Nathan Motzko at nathan.motzko@usda.gov or 406-224-0323 by 12:00 p.m. MDT on September 30, 2026, if they intend to attend. 6. Requested Capability Statement Content Company information (UEI, address, email, POC, socio-economic status). Relevant experience, especially hazardous fuel reduction, helicopter yarding, steep slope timber operations. Safety program details and crew qualifications. Equipment lists and mobilization capabilities. Past performance references. 7. Response Instructions & Due Date Any information submitted by vendors to this this SS/RFI is voluntary. Responses should be submitted electronically to Jeanne Windle at norma.windle@usda.gov. All responses are due no later than October 15, 2026, at 4:00 p.m. MDT. 8. Points of Contact Direct all questions via email to Jeanne Windle, Contracting Officer at norma.windle@usda.gov.
77%
Market Research12/15/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26Q4160 is issued as a Request for Quotation (RFQ) for Promenade Park Stewardship IRSC (Integrated Resource Service Contract). Award shall be made under the R5 Pacific Southwest Stewardship Blanket Purchase Agreement. Only current BPA holders are eligible to submit quotes. Quotes received from vendors that have not been awarded an R5 Pacific Southwest Stewardship BPA will be rejected; no evaluation of submitted documents will be performed. The Forest Service is executing this procurement using stewardship contracting authority provided under 16 USC 6591c. The objectives of this project are to improve health and resiliency across the landscape in post-fire stands within recent wildfire footprints, to reduce fuels and snags to prepare the landscape for future fire, and limit excessive fuel accumulation, especially within and adjacent to communities, and increase the resilience of remnant green stands not effected by the Park Fire. The project will advance EO 14225, Immediate Expansion of American Timber Production, and the USDA's National Active Forest Management Strategy. Project activities include: 1. Cut, Skid and Deck Included Timber from the Contract Area, 2. Removal of Included Timber from the Contract Area, 3. Road Maintenance, 4. Road Reconstruction Work. This acquisition is total small business set-aside. The set-aside related to the business status of the vendors submitting quotes and does not limit where the wood products may be sold. The applicable North American Industry Classification Standard Code is 113310 – Logging. The small business size standard is 500 employees All responsible sources that have been awarded R5 Pacific Southwest Stewardship BPAs for work on the Lake Tahoe Basin Management Unit may submit quotations which will be considered by the agency. Solicitation was amended on 7/17/26 to add Attachment 11 - Site Visit Notes. Attachment 5b Contract Area Map was also struck and replaced with an amended version dated 7/14/26 that includes a newly approved water hole. Deadline for quote receipt is unchanged. BPA holders eligible to submit quotes must acknowledge receipt of this amendment.
77%
Combined Synopsis07/28/2026
This Sources Sought / Request for Information (RFI) is issued solely for market research and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. The Government will not reimburse accompanying costs. Any answers or attachments provided are based upon the best information available at the time of the site visit and are subject to change. 1. Background & Purpose USDA Forest Service seeks capability statements from qualified vendors able to conduct forest thinning and vegetation treatments in areas burned by the Caldor Fire. The goals of the project are to reduce hazardous fuels and create conditions appropriate for reestablishing forested landscapes. Stewardship Authority shall be utilized to award an Integrated Resource Service Contract. In accordance with the approved NEPA decision, Cut-to-Length harvesting is the required logging mechanism. CTL typically consists of a harvester cutting and processing trees at the stump and a forwarder transporting the material to a designated landing location over a slash mat. The purpose of this SS/RFI is to gather information on vendor capabilities, invite prospective vendors to an organized site visit on 11/3/2026 before snow limits access, and provide draft documents to so that vendors can assess whether the opportunity is one to follow and potentially quote. 2. Anticipated Scope of Work The project objectives shall be met by performing the following service work. Cut, process, and forward to landings or pile included biomass in 3 units across 205 acres. Within these units, cut standing dead conifer trees and forward to landings or pile. Treat fuels by mechanically masticating existing dead and down material, project-generated slash and brush. Remove slash and large dead and down to landings when necessary to meet the fuels treatment specification. Remove biomass and cull logs from landings to off-Forest disposal sites. Construct temporary road to facilitate thinning treatment and decommission the roads prior to demobilization. Perform road maintenance and erosion control on roads used for biomass removal or otherwise damaged by Contractor’s operations. Perform hand thinning and piling if awarded. 3. Place of Performance The project is located on the Lake Tahoe Basin Management Unit in portions of Township 11N Range 18E Section 5, and Township 12N Range 18E Sections 32 and 33; Mount Diablo Meridian, approximately 0.5 miles southeast of the intersection of California Highway 89 and US Highway 50. 4. Period of Performance Anticipated start date: Early Summer 2027. Performance deadline: 9/15/2027. This deadline is linked to grant funding expiration. 5. Site Visit An organized site visit will occur on Tuesday, November 3, 2026, at 10:00 a.m. local time. Interested parties will meet in South Lake Tahoe, CA at the east end of Oneidas Street at the Forest Service Gate: 38°51'53.0"N 119°59'40.7"W. This location is south of Lake Tahoe Airport off of Pioneer Trail Road. Interested parties should email Karen Ruklic at karen.ruklic@usda.gov by 1:00 p.m. PT on November 2, 2026, if they plan to attend. 6. Requested Capability Statement Content Company information (UEI, address, email, POC, business size and socio-economic status). Relevant experience focused on thinning via Cut-to-Length logging system and hazardous fuel reduction. Key personnel and crew qualifications. Equipment lists and mobilization capabilities. Past performance references. 7. Response Instructions & Due Date Any information submitted by vendors to this this SS/RFI is voluntary. Responses should be submitted electronically to Karen Ruklic at karen.ruklic@usda.gov. All responses are due no later than Monday, November 2, 2026, at 1:00 p.m. PT. Notice was updated on 11/17/2026 to provide Site Visit Notes to all interested vendors (see newly added attachment). Issuance of the combined synopsis/solicitation for this project is not planned to occur until the first quarter of 2027. The Site Visit notes will be included as an attachment in the final solicitation.
74%
Market Research11/02/2026
Request for Information: Chumstick to Lower Peshastin (LP), A-Z Stewardship Project, Okanogan-Wenatchee National Forest, Washington State The US Forest Service is beginning the planning process for a new stewardship project under the current title of Chumstick to Lower Peshastin (LP), A-to-Z Stewardship on the Okanogan-Wenatchee National Forest in Washington State. This would require the completion of an environmental analysis and presale activities at industry or interested parties expense (not as service items). The timber would be sold at advertised rates (no bid premium). Estimated volume: 60-100 MMBF. Project Boundary: 115,316 Acres. Forest Service Land in Boundary: 59,802 Acres More information on this project can be expected in the coming year, including a more detailed project proposal that would provide enough information for our government to government consultation with interested parties. We anticipate having a project proposal sent out in 2022. Interested parties are asked to respond to this RFI with the following information: Describe your company's capacity for completing a project of this size and complexity, including organizational experience in one or more of the scope elements described in the RFI. Discuss your recommendations / best practices or other factors that we should take into account when developing our project. Describe how you will obtain a third party to complete an environmental analysis to meet the requirements of the National Environmental Policy Act (NEPA), and ensure compliance with other required laws and policy. Emphasize meeting requirements of the Endangered Species Act (ESA) Biological Assessment (BA) preparation, and Northwest Forest Plan (NWFP) compliance, including Late Successional Reserve (LSR) assessments and report preparation. Describe how you will ensure completion of NEPA and pre-NEPA survey work, including heritage, botany, aquatics, and wildlife surveys (northern spotted owl). How would your company ensure there is no conflict of interest in performing services as a result of the NEPA decision? Describe how you would finance all NEPA costs and presale activities without any payment from the Federal Government. What risks would prevent you from submitting a proposal for this project? What overall ideas could increase interest in the Chumstick to LP, A-to-Z Stewardship Project? Do you have recommendations on ways to incentivize the overall project or provide opportunities to submit a proposal on specific aspects of implementation? What other contract strategy ideas do you have for a project of this scale? For example, what scope elements could be broken out by separate task orders to maximize performance outcomes? This is a Request for Information (RFI) ONLY. The information obtained from this notice will be used for market research purpose only to define and develop the Government’s requirement. This RFI is not a Request for Proposal (RFP) and is not to be construed as a commitment by the Government to issue a solicitation or ultimately award a contract. Responses will not be considered as proposals nor will any award be made as a result of this notice. All information contained in this RFI is preliminary and subject to change. It is in no way binding on the Government. FAR clause 52.215-3, “Request for Information or Solicitation for Planning Purposes” is incorporated by reference in this RFI. The Government does not intend to pay for information received in response to this RFI. Responders to this invitation are solely responsible for all expenses associated with responding to this RFI. This RFI will be the basis for collecting information on capabilities available. This RFI is issued solely for information and planning purposes. Proprietary information and trade secrets, if any, must be clearly marked on all materials. All information received in this RFI that is marked “Proprietary” will be handled accordingly. Please be advised that all submissions become Government property and will not be returned nor will receipt be confirmed. In accordance with FAR 15.201(e), responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. Please respond by August 27, 2021. Please do not respond with a cost or technical proposal. Send all questions regarding this RFI via email to Nate Standish nate.standish@usda.gov and Carl Ericksen carl.ericksen@usda.gov. Please indicate in email subject line: “RFI Questions: A-to-Z Stewardship, Chumstick to LP.” All questions will be routed to the appropriate individual for response.
62%
Special Notice08/27/2021
Chewelah A to Z Stewardship BPA. Phase 1 is the solicitation and BPA issuance and Calls for all NEPA and pre-sale related activates. Phase 2 is the BPA Calls for all Stewardship, restoration service activities.
61%
AwardedOpen

Additional Details

Solicitation Number

12363N26Q4181

Archive Date

Dec 5, 2026

Office Address

Washington, DC, 202501138