GovChime
Notice ID: 3a0595821b6f46b292dd89fe2510cabbSources Sought

ISO 50001 Certification Follow-On

Archived on March 4, 2026. Original response deadline: . Full description on SAM.gov.

Description

The Contractor shall provide personnel, equipment, tools, materials, supervision, and services to provide Strategic Energy Manager (SEM) expertise to support sustainment of certification of the most recent International Organization for Standardization (ISO) 50001 Energy Management System (EnMS) for the WR-ALC at Robins Air Force Base (AFB), GA. (See attached PWS for full details)

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:FA8571 MAINT CONTRACTING AFSC PZIM
Posted:February 11, 2026
NAICS:Not specified
Last Updated:Sep 25, 2026
PSC:Not specified
Set-Aside:Not specified
Type:Sources Sought
Place of Performance:Warner Robins, Georgia, 31098

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 2 of 2 items

Document
Source
Agency
Posted Date
File Size
Actions
Sources SoughtDEPT OF THE AIR FORCEFeb 11, 202634.63 KB
Sources SoughtDEPT OF THE AIR FORCEFeb 11, 2026268.74 KB

Lifecycle

Solicitation:78298
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. 2×
    Market ResearchCurrentFeb 11, 2026

    ISO 50001 Certification Follow-On

    Notice 3a0595821b6f46b292dd89fe2510cabb on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
This follow-on effort is planned for a nine-year Period of Performance (PoP) spanning 10 September 2029 through 9 September 2038. The initial forecasted repair requirements are detailed in the attached RFI_Master List of NSNs, though the government reserves the right to modify specific NSN requirements in future correspondence. The government does not possess nor have rights to the technical data for these items. Furthermore, the government has designated these systems as commercial items. Prospective sources are advised that physical samples of these items are not available for evaluation. The contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts Contractors/Institutions responding to this RFI are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.
Market Research334511No Set-Aside10/19/202611/03/2026Warner Robins, GA
This requirement is a Firm Fixed Price contract for the repair of the C-5 Automated Flight Control System Panel (AFCSP), NSN 5998015998134UC, PN 4V91084-101; and Communication/Navigation Panel (CNP), NSN 5998015999341UC, PN 4V91083-101A to provide all the necessary parts and labor to test and repair the AFCSP and CNP. The contract will include one (1) 12-month basic year and four (4) one-year ordering periods. This anticipated contract action is in support of the Air Force Sustainment Center (AFSC), 638th Supply Chain Management Group (SCMG), 409th Supply Chain Management Squadron (SCMS). The proposed contract action is for services for which the Government intends to solicit and negotiate using Other Than Full and Open Competition (OTF&OC) procedures in accordance with RFO Part 6.103-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The Government does not own any production level technical data or specialized test equipment in support of this requirement. As a result, Ducommun Labarge Technologies, Inc – CAGE 08719, is the only known source with adequate knowledge of the C-5’s Automated Flight Control System Panel (AFCSP) and Communication / Navigation Panel (CNP) performance requirements and possession of the required technical data and capabilities needed to repair this item and ensure compatibility of the equipment. The Government's required delivery schedule is 90 days after receipt of asset. The quantities shown below represent the Best Estimated Quantities for this effort. This is for a Firm Fixed Price, Requirements type contract.This solicitation will result in a supply contract for the following: NSN: 5998-01-599-8134UC Part Number: 4V91084-101A Noun: Automated Flight Control System Panel (AFCSP) RMC/ RMSC: R3/R Quantity: 100 EA NSN: 5998-01-599-9341UC Part Number: PN 4V91083-101A Noun: Communication/Navigation Panel (CNP) RMC/ RMSC: R3/R Quantity: 50 EA The solicitation issuance date is 09 October 2026, with a response date of 09 November 2026 16:00 EST. The RFP and attachments are included within the attachments area of this solicitation. Authority: 10 U.S.C, 3204(a)(1). Justification: the property or services needed by the agency are available from only one responsible source or only from a limited number of responsible sources and no other type of property or services will satisfy the needs of the agency
Solicitation336413No Set-Aside10/19/202610/09/2026-
The Contractor shall provide all the materials, parts, labor, tools, equipment, required to provide repair of VDATS component parts in support of the 402nd Software Engineering Group (SWEG)/581 St Software Engineering Squadron (581 St SWES), Robins Air Force Base, Georgia. This is a Sole source requirement do to proprietary data.
Combined Synopsis334515No Set-Aside10/19/202610/23/2026Warner Robins, GA
The Contractor shall provide personnel, equipment, tools, materials, supervision, and services to provide Strategic Energy Manager (SEM) expertise to support sustainment of certification of the most recent International Organization for Standardization (ISO) 50001 Energy Management System (EnMS) for the WR-ALC at Robins Air Force Base (AFB), GA.
Combined Synopsis541690No Set-Aside10/15/202610/20/2026Warner Robins, GA
This is a combined solicitation/synopsis notice of a sole source BPA to OEM due to proprietary data. Rohde & Schwarz, Inc (CAGE 82199) Due to the proprietary information, data and equipment, no offers are being solicited.
Combined Synopsis334515No Set-Aside10/15/202610/23/2026Warner Robins, GA

Additional Details

Solicitation Number

78298

Archive Date

Mar 4, 2026

Office Address

ROBINS AFB, GA, 31098-1672