1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM EDT
- Posted
- August 21, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- General Services AdministrationPUBLIC BUILDINGS SERVICE
Notice details
- Office
- PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH WEST
- Place of performance
- Washington, District of Columbia, 20405
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 47PB5426R0007
- Notice ID
- 7e5a5f9a39414ab4b5a33b614bba4071
Description
*****8/21/2026**** - Amendment 0002 issued to respond to RFI questions
****8/11/2026**** - Amendment 0001 Issued
8/5/2026 ** UPDATE -Please note the following updates regarding the upcoming pre-proposal meeting:
- Time: The meeting will run from 10:00 AM to 1:00 PM.
- Security: Attendees must arrive by 9:30 AM to allow sufficient time to clear security.
- Agenda: The session will include a presentation by GSA, a Q&A session, and a brief site tour.
Please note that a more formal tour will be conducted during Phase II for those who submit a proposal.
8/3/206 **UPDATED INFORMATION **Registration for the mandatory pre-proposal site visit must be completed by August 6th. The site visit is scheduled for Tuesday, August 11, 2026, at 1800 F St NW, Washington, DC. To register, please complete the registration form on SAM associated with the solicitation. A short tour of the work areas will be conducted during the visit, and your attendance is highly encouraged.**
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405.
The U.S. General Services Administration (GSA), Public Buildings Service (PBS), Acquisition Project Delivery – Capital Construction Division, is seeking construction services for the reanimation of the GSA Headquarters Building at 1800 F Street, NW, Washington. 1800F was listed on the National Register of Historic Places in 1986, recognizing its architectural and federal government significance.
The project seeks to transform the historic building from a series of incremental renovations into a long-term, adaptable federal asset that will provide the opportunity for two agencies, GSA and the U.S. Office of Personnel Management (OPM), to co-locate and reimagine what is possible in a shared headquarters. The primary objective is to complete the reimagination, enhance building performance, and ensure the space can adapt to future workforce and multi-tenant requirements. This project will set a new standard for a modern, adaptable federal workplace.
The project will focus on the renovation of Wings 0 and 3, which remain unrenovated and unoccupied due to their deteriorated condition, tenant improvement renovations in the modernized Wings 1, 2, & 4, building envelope repairs including masonry, windows and roofs, and reactivation of the building courtyards through the addition of raised courtyard plazas and canopy enclosures. The project aims to restore the building to full operational use and preserve the architectural integrity of this landmark historic facility.
The project will be delivered via the Construction Manager as Constructor (CMc) delivery method in which GSA contracts with a CMc during the design phase of the project to provide design input and constructability review and establishes a Final Construction Contract option to execute the construction portion of the project.
The design phase services shall be performed at a firm-fixed-price. Early construction services for core and shell are also expected to be awarded at a firm-fixed-price at time of initial contract award. The optional construction services for interiors and courtyards will be priced at a Final Construction Contract Price and may be exercised at a firm-fixed-price.
Cost Accounting Standards (CAS) are not anticipated to be required for this procurement.
This solicitation will be executed pursuant to the Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) 15. A “Best Value” tradeoff will be conducted in accordance with RFO FAR 15.103-1 Tradeoff approach. Pursuant to FAR Clause 52.215-1 (GSA Class Deviation RFO-2025-15) Instructions to Offerors-Competitive Acquisition, the Government intends to evaluate proposals and award contracts without discussions with offerors (except clarifications as described in RFO FAR 15.202, although it reserves the right to open discussions should it be determined to be in its best interests. It is the government’s intention to award a contract to the offeror whose proposal conforms to the RFP requirements and is considered to be the most advantageous to the government, price and technical factors considered. Competitive proposals shall be evaluated and assessed based on the factors specified in this solicitation. For this solicitation, the combined weight of the non-price factors is significantly more important than the Total Evaluated Price.
GSA anticipates using a “Paired Proposal Procedure” to satisfy the Project Labor Agreement (PLA) requirements in RFO FAR 22.5. The paired-proposal procedure requires each offeror to submit a PLA proposal, and permits each offeror to also submit a non-PLA proposal for the same scope of work.
One (1) award will be made from this two-step (2-Step) CMc solicitation.
This procurement will be solicited as full and open competition.
The North American Industry Classification System (NAICS) code for this acquisition is 236220 (Commercial and Institutional Building Construction). The small business size standard is $45 million average annual receipts.
Technical factors are listed in order of descending importance by phase. For the overall best value tradeoff evaluation, Factor 4 is significantly more important than Factors 1, 2, 3, and 5. The Project Price Proposal is not a technical factor but will be evaluated in Phase II.
Phase I – Request for Qualifications (RFQ)
Evaluation Factors:
- Factor 1: Key Personnel
- Factor 2: Past Performance
- Factor 3: Past Technical Experience
Phase II – Request for Proposals (RFP)
- Factor 4: Management and Technical Approach - Design Phase Services and Construction Phase Services
- Factor 5: Small Business Utilization Plan
- Factor 6: Project Price Proposal
Design phase and early core and shell construction services are anticipated to commence upon award of the contract estimated in January or February 2027. The optional construction phase work (Tenant Interiors & Courtyards) is anticipated later in 2027. The total period of performance from the early construction and design phase NTP through substantial completion is approximately 660 calendar days.
Prior notification of attendance to this conference is mandatory.
To ensure that you receive all information regarding this solicitation, please register to receive updates at www.SAM.gov, follow the procedures for notification registration.
Interested Parties/How to Offer: The Solicitation will only be available electronically. The Phase 1 solicitation will be available on or about 07/17/2026. The solicitation can only be obtained by accessing SAM.gov, a secure website designed to safeguard Controlled Unclassified Information (CUI). Potential offerors will be responsible for downloading the solicitation and for monitoring the website for possible amendments and/or additional information. Potential offerors must be registered in SAM.gov. Inquiries concerning the project should be directed to the following email address: robert.n.jackson@gsa.gov and reference the solicitation number in the subject line.
One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.
RFI- The request for information is due on 8/18/2026 at 11AM. Please submit questions on the 1800F CMc Request for Information (RFI) Intake Form (Phase I) in the Solicatation Notice Attachment
Pre-Proposal Conference - A in person pre-proposal conference will be held on 10 AM 8/11/2026 at 1800 F St NW Washington, DC 20405. Those attending must complete 1800 Forward CMc Pre-Proposal Conference Sign Up in the Soliciation Notice Attachment This form must be filled out by 5:00pm EST 08/06/2026.
Phase I proposals are due on 8/28/2026 at 11:00 EST
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (22)
- Download
Solicitation Amendment 47PB5426R0007_0002.pdf
601 KBAdded in Solicitation version 7Posted - Download
(RFI) 1800F CMc (Responses).pdf
34 KBAdded in Solicitation version 7Posted - Download
1800 F Phase 2 Modernization Feasibility Study_Final Hazmat Report 02-06-2026.pdf
24 MBAdded in Solicitation version 7Posted - Download
1800Forward CMc Preproposal Presentation.pdf
13 MBAdded in Solicitation version 6Posted - Download
Solicitation Amendment 47PB5426R0007_0001.pdf
605 KBAdded in Solicitation version 6Posted - Download
Pre-Proposal Conference Attendees.pdf
54 KBAdded in Solicitation version 6Posted - Download
47PB5426R0007 1800 Forward CMc .pdf
5.1 MBAdded in Solicitation version 4Posted - Download
1800 Forward CMc SOW (1).pdf
553 KBAdded in Solicitation version 4Posted - Download
Appendix C - 1800 Forward Firm PPQ.pdf
520 KBAdded in Solicitation version 4Posted - Download
Appendix B - 1800 F CMC SOW_Key Personnel .docx.pdf
135 KBAdded in Solicitation version 4Posted - Download
1800F Phase 2 Modernization Feasibility Study_Final Submission 04-03-2026.pdf
77 MBAdded in Solicitation version 4Posted - Download
GSA-113 Industry Day PPT - FINAL.pptx .pdf
8.4 MBAdded in Solicitation version 4Posted - Download
2025 Design Guide for Operational Excellence .pdf
6.2 MBAdded in Solicitation version 4Posted - Download
CBS Submittal Matrix 2025 with hyperlinks.pdf
5.4 MBAdded in Solicitation version 4Posted - Download
Proprietary Information Agreement - Template 120825.docx
1.6 MBAdded in Solicitation version 4Posted - Download
p120.pdf
974 KBAdded in Solicitation version 4Posted - Download
PBS_Core_Building_Standards_Memorandum 24FEB.25 .pdf
404 KBAdded in Solicitation version 4Posted - Download
National Operational Excellence Checklists (Public) .xlsx
311 KBAdded in Solicitation version 4Posted - Download
Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx
53 KBAdded in Solicitation version 4Posted - Download
FY25_Operational Excellence (OE) Narrative Matrix (Public) .xlsx
57 KBAdded in Solicitation version 4Posted - Download
1800Forward CMC Solicitation Notice.pdf
168 KBAdded in Solicitation version 4Posted - Download
1800Forward CMC 47PB5426R0007 Presolicitation Notice.pdf
108 KBAdded in Presolicitation version 3Posted
Links (1)
- 1800F CMc Request for Information (RFI) Intake Form (Phase I)docs.google.comPosted
Lifecycle
- 3Version 3PresolicitationArchived
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
- 4Version 4Solicitation
Type changed from Presolicitation to Solicitation
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
- 5Version 5Solicitation
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
- 6Version 6Solicitation
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
- 7Version 7SolicitationCurrent
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The subject building has an undersized, and improperly designed recirculating hot water system, resulting in excessive delay in hot water supply to relevant fixtures. The building was constructed in approximately 1998, and consists of a basement and 3 floors. The water heater and recirc pump are located in the basement, with all recirculating hot water piping in this project running through all floors. | 66% | Combined Synopsis | 08/10/2026 |
This project is to provide and install two new forced air electric heaters in the first floor mechanical rooms to maintain temperatures at acceptable levels and prevent damage to building systems. | 66% | Combined Synopsis | 08/13/2026 |
Caulk the perimeter of the building at the roof line, foundation and at the wainscoting line to limit infiltration. This project also involves insulating the water lines feeding the urinal and hose bib located in the public restroom. | 66% | Combined Synopsis | 07/21/2026 |
Amendment 3 - Ommit clauses, updated link and RFI responses. (See attachment) Amendment 2 - Extend the proposal and RFI's due dates. (See attachment) Amendment 1 - Extend the proposal due date. (See attachment) The Smithsonian Institution seeks interested Small Business contractors to establish multiple Small Business Indefinite Delivery / Indefinite Quantity (IDIQ) Contracts with construction firms to provide construction services between $1 million to $8 million per project. The NAICS code is 236220 for Commercial and Institutional Building Construction. This announcement is for the selection and award of one or more Contracts that will support construction needs in our facilities for the Washington, DC Metropolitan area and surrounding facilities such as the Smithsonian Conservation Biology Institute in Front Royal, VA and the Smithsonian Environmental Research Center, Edgewater, MD. REQUEST FOR CLARIFICATIONS It is desired that all questions/clarifications be sent in, sequentially numbered for example first questions 1,2,3, second set of questions 4,5,6, etc. in word format to ColemanSI@si.edu It is requested that all questions be sent in no later than October 12, 2026 at 3PM EST. No site visit has been arranged, if you feel a site visit is warranted, please send an email requesting one. Qualifications are to be submitted by 3:00PM ET November 9, 2026 to Dropbox Link: https://www.dropbox.com/request/gy0wr7le8oqp3rmm3o6x | 61% | Solicitation | 11/09/2026 |
Update 4 - September 29, 2026 The government is still working on RFI responses and proposal due date will be updated once the RFI responses are posted. --------------------------------------------------------------------------------------------------------- Update 3 - August 26, 2026 Please see amendment 1 attached. --------------------------------------------------------------------------------------------------------- Update 2 - August 7, 2026 Uploaded 2 specs documents to the attachments based on RFIs received. The government is working on answering RFIs and those will be posted at a later date. This order proposal request is only available to current MACBOA holders with NAICS 236220 Update 1 - July 28, 2026 RFIs are due by August 4th at 2pm from Prime contractors that attended the site visit. This posting is only available to current Tinker AFB MACBOA holders with NAICS 236220 ProjectSolicitation Number: FA813726R0021 Project Title: WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 Project Location: Tinker AFB, B3221 Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. After review of the attached project specific documents, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. You must attend the site visit to be eligible to submit a proposal. Your RSVP email must be received by 2:00pm CT on 23 July 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must send their names with the RSVP. The initial site visit will be held on Tuesday, 28 July, 2026, at 9 am. Everyone will meet at the main entrance of B3221. If you require base access, details will be coordinated with you at the time of RSVP. Proposal due date for Step-one is 1 September, 2026 at 2pm CT. As a reminder to the offeror(s) – 2-Step Sealed Bidding process is as follows: Step-One – conduct the initial site visit with prime contractors (offerors) and their subcontractors. After the initial site visit the offeror(s) are to submit RFIs for a government response. RFI government responses will be provided to the offeror(s), any questions or concerns of the responses should be addressed as a follow on RFI. Once the RFIs have been provided to the offeror(s), a request for technical proposal (RFTP) will be sent to the offeror(s) to submit the technical proposal to the government contracting office. Technical proposals are not to have any pricing, unit nor total, but does need to have all material and quantiles as required for any proposal. At this time, no additional RFIs are to be submitted. A technical evaluation of the technical proposal will be conducted and only the offeror(s) found to be technically acceptable will proceed to Step-Two. Step-Two – a request for price bid (RFPB) will be sent to all offerors that had Step-One found to be technically acceptable. And a date / time for submission of price bid will be stated. In Step-Two, a cover page of the total price and follow-on pages of full pricing break down to include material unit/total prices. During this step no additional RFIs are to be submitted, and no additional site visits are anticipated but can be requested to assist in developing pricing. After submission of price bids, a bid opening date will be advertised. During the bid opening, only the total submitted bid price from price bid cover page of each offeror will be verbalized. And an apparent low bid offeror will be announced at the bid opening. A more in-depth price evaluation will be conducted on the apparent low bid offeror’s proposal to determine full acceptability. If low bid offeror’s price bid is found to be unacceptable, the next lowest offeror’s price bid will be evaluated for acceptability. This order proposal request is only available to current MACBOA holders with NAICS 236220 | 60% | Solicitation | 12/30/2026 |
Additional Details
Solicitation Number
47PB5426R0007
Archive Date
Dec 31, 2026
Office Address
Washington, DC, 20405