GovChime
Notice ID: 7ea9be3697234cf19c8fdce434ef8cf0SolicitationArchived

Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

Archived on September 9, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
August 19, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
335312: Motor and Generator Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND
Place of performance
Ottawa, Illinois, 61350
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912EK26QA043
Notice ID
7ea9be3697234cf19c8fdce434ef8cf0

Description

The U.S. Army Corps of Engineers, Rock Island District, Illinois Waterway Project Office has a requirement for a 500kW generator and corresponding supplies. 

Technical inquiries are due no later than 2:00 PM CT 18 August 2026. Quotes are due by 2:00 PM CT 25 August 2026. 

See the solicitation for complete quote submission requirements and instructions. 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (3)

  • B08_Amendment_0001.pdf

    589 KBAdded in Solicitation version 4Posted
    Download
  • B08_Questions_and_Answers_Final.pdf

    23 MBAdded in Solicitation version 2Posted
    Download
  • B08_W912EK26QA043.pdf

    2.8 MBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

    Notice f125b2f12b0843e499ba621d985bda3f on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

    Notice 046e3ce6a36341b59dbe7278cad5cea9 on SAM.gov

  3. 4
    Version 4SolicitationArchivedCurrent

    Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

    Notice 7ea9be3697234cf19c8fdce434ef8cf0 on SAM.gov

  4. 7
    Version 7Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

    Notice d3e463121d5e4840abb1b9498b1ddb2b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The abstract for this requirement is uploaded. The contractor shall supply and install a new minimum 48 kW propane-fueled generator set, propane fuel tank, and automatic transfer switch (ATS).
86%
Solicitation03/04/2026
LOCK and DAM 24 and 25 MITER GATE MOTORS, ADJUSTABLE SPEED DRIVES, AND MACHINERY BRAKES REPLACEMENT SUPPLY CONTRACT, LOCKS 24 and 25, MISSISSIPPI RIVER BETWEEN MO. RIVER AND MINNEAPOLIS, MN.
86%
Combined Synopsis01/27/2026
GENERATORS - Stationary and Mobile; 1. Stationary - Mounted on less than 190 gal (plus or minus 5 gal) #2 Diesel fuel tank. (Must have hole for conduit access); Runs on #2 Diesel Fuel; 60kVA (plus or minus 10kVA); 120/208 3-phase, 60Hz; Controls compatible with Generac GTS Series Transfer Switch; Equipped with Main Breaker, Batteries, Block Heater, Battery charger 2. Mobile - 60kVA (plus or minus 10kVA); 120/208, 3-phase, 60Hz; Mounted on 150gal (plus or minus10gal) #2 Diesel Fuel Tank; Runs on #2 Diesel Fuel; Prepared for mobile use with temporary connection ports; 100 feet (plus or minus 10 feet) of cables for each phase, neutral, and ground; Cables must come equipped with all coupling/connector ends installed; Integrally secured to a Heavy Duty Steel Trailer with 2 inch Ball hitch; DOT Towing package with Electric Breaks
74%
Combined Synopsis09/04/2026
Reason for amendment 0002 is to update the not to exceed dimensions, part number, as well as slight update to the salient characteristics. Generators.
74%
Combined Synopsis03/28/2026
150 kW Generator Dual FuelStandby Generator120/2083 Phase Type of Enclosure is NEMA 3R Rated; No tank required, natural gas is available at the site; Receiving facility and forklift available, so no offloading required. Battery and Battery Charger required. Amendment 0001 - Due date change. Amendment 0002 - EPA requirement correction.
73%
Combined Synopsis09/18/2026

Additional Details

Solicitation Number

W912EK26QA043

Archive Date

Sep 9, 2026

Office Address

ROCK ISLAND, IL, 61299-5001