WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Active, responses due . Full description on SAM.gov.
Description
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
UDATE 01 - 15 October 2026
1) The site visit for this requirement was conducted on 15 October 2026
2) RFI's are due 22 October 2026 @ 1400 (2:00 pm) CST
3) Send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil
4) The site visit sign in sheet has been posted in the attachments
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In you RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, Initial Site Visit is set for Thursday, 15 October, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point.
You must attend the initial Site Vist for the project, to be considered eligible to propose.
Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil" and CC Tamra Torres at "tamra.torres@us.af.mil".
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (136)
- Download
WWYK250063 - Site Visit Sign In Sheet.jpg
96 KBAdded in Solicitation version 2Posted - Download
Solicitation - FA813727R0002.pdf
765 KBAdded in Solicitation version 1Posted - Download
Site Visit Meet Up Location.png
1.5 MBAdded in Solicitation version 1Posted - Download
250063_ATT 14_Prebid RFI Responses Round 2.pdf
290 KBAdded in Solicitation version 1Posted - Download
250063_ATT 13_Prebid RFI Responses Round 1.pdf
224 KBAdded in Solicitation version 1Posted - Download
250063_ATT 9_SOW.pdf
374 KBAdded in Solicitation version 1Posted - Download
250063_ATT 8_Liquidated Damages.pdf
82 KBAdded in Solicitation version 1Posted - Download
250063_ATT 6_OPSEC Review Memo.pdf
1.8 MBAdded in Solicitation version 1Posted - Download
250063_ATT 4_ODS.pdf
157 KBAdded in Solicitation version 1Posted - Download
2020 TAFB Facility Standard.pdf
5.8 MBAdded in Solicitation version 1Posted - Download
2026 TAFB Mechanical Standard_signed.pdf
1.2 MBAdded in Solicitation version 1Posted - Download
2026 TAFB Electrical Standard - Signed.pdf
523 KBAdded in Solicitation version 1Posted - Download
2026 TAFB FIRE PROTECTION STANDARD.pdf
341 KBAdded in Solicitation version 1Posted - Download
SOW Att 04_Automated Casting Cell.pdf
658 KBAdded in Solicitation version 1Posted - Download
SOW Att 02c_Controlled Area Training - Certificate.pdf
467 KBAdded in Solicitation version 1Posted - Download
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx
16 KBAdded in Solicitation version 1Posted - Download
SOW Att 02a_Controlled Area Training.pptx
651 KBAdded in Solicitation version 1Posted - Download
250063_SOW.pdf
374 KBAdded in Solicitation version 1Posted - Download
250063_ATT 10_Submittal Register.xlsx
70 KBAdded in Solicitation version 1Posted - Download
250063_ATT 10_Submittal Register.pdf
360 KBAdded in Solicitation version 1Posted - Download
250063_ATT 3_RMDF.pdf
265 KBAdded in Solicitation version 1Posted - Download
23 09 23.02.pdf
168 KBAdded in Solicitation version 1Posted - Download
22 00 00.pdf
359 KBAdded in Solicitation version 1Posted - Download
23 31 13.00 40.pdf
182 KBAdded in Solicitation version 1Posted - Download
23 08 00.pdf
163 KBAdded in Solicitation version 1Posted - Download
23 00 00.pdf
245 KBAdded in Solicitation version 1Posted - Download
21 13 13.pdf
103 KBAdded in Solicitation version 1Posted - Download
23 07 00.pdf
233 KBAdded in Solicitation version 1Posted - Download
23 05 48.00 40.pdf
49 KBAdded in Solicitation version 1Posted - Download
23 36 00.00 40.pdf
90 KBAdded in Solicitation version 1Posted - Download
23 05 15.pdf
151 KBAdded in Solicitation version 1Posted - Download
09 67 23.15.pdf
90 KBAdded in Solicitation version 1Posted - Download
23 09 13.pdf
171 KBAdded in Solicitation version 1Posted - Download
09 90 00.pdf
139 KBAdded in Solicitation version 1Posted - Download
26 20 00.pdf
187 KBAdded in Solicitation version 1Posted - Download
10 14 00.10.pdf
42 KBAdded in Solicitation version 1Posted - Download
08 81 00.pdf
57 KBAdded in Solicitation version 1Posted - Download
08 51 23.pdf
38 KBAdded in Solicitation version 1Posted - Download
08 11 13.pdf
39 KBAdded in Solicitation version 1Posted - Download
08 33 23.pdf
47 KBAdded in Solicitation version 1Posted - Download
07 92 00.pdf
43 KBAdded in Solicitation version 1Posted - Download
07 14 00.pdf
40 KBAdded in Solicitation version 1Posted - Download
08 71 00.pdf
59 KBAdded in Solicitation version 1Posted - Download
23 03 00.pdf
25 KBAdded in Solicitation version 1Posted - Download
23 05 93.pdf
57 KBAdded in Solicitation version 1Posted - Download
10 14 00.20.pdf
30 KBAdded in Solicitation version 1Posted - Download
10 22 13.pdf
22 KBAdded in Solicitation version 1Posted - Download
05 40 00.pdf
42 KBAdded in Solicitation version 1Posted - Download
07 84 00.pdf
32 KBAdded in Solicitation version 1Posted - Download
28 31 76.pdf
200 KBAdded in Solicitation version 1Posted - Download
10 44 16.pdf
14 KBAdded in Solicitation version 1Posted - Download
07 21 16.pdf
26 KBAdded in Solicitation version 1Posted - Download
03 01 00.pdf
148 KBAdded in Solicitation version 1Posted - Download
23 64 26.pdf
165 KBAdded in Solicitation version 1Posted - Download
05 05 23.16.pdf
34 KBAdded in Solicitation version 1Posted - Download
06 41 16.00 10.pdf
57 KBAdded in Solicitation version 1Posted - Download
00 72 00.pdf
5.3 MBAdded in Solicitation version 1Posted - Download
01 78 00.pdf
1.4 MBAdded in Solicitation version 1Posted - Download
00 71 00.pdf
1.5 MBAdded in Solicitation version 1Posted - Download
00 70 00.pdf
897 KBAdded in Solicitation version 1Posted - Download
01 33 00.pdf
856 KBAdded in Solicitation version 1Posted - Download
01 45 00.00 10.pdf
36 KBAdded in Solicitation version 1Posted - Download
01 78 23.pdf
34 KBAdded in Solicitation version 1Posted - Download
01 50 00.pdf
300 KBAdded in Solicitation version 1Posted - Download
01 32 16.00 20.pdf
28 KBAdded in Solicitation version 1Posted - Download
00 80 05.pdf
10 KBAdded in Solicitation version 1Posted - Download
01 42 00.pdf
10 KBAdded in Solicitation version 1Posted - Download
01 33 16.00 10.pdf
86 KBAdded in Solicitation version 1Posted - Download
00 80 00.pdf
8.2 KBAdded in Solicitation version 1Posted - Download
HAZMAT Reporting at Tinker AFB FEB 2025.pdf
23 KBAdded in Solicitation version 1Posted - Download
UMRL.pdf
686 KBAdded in Solicitation version 1Posted - Download
ERDCITL_TR12-1_r2.pdf
3.4 MBAdded in Solicitation version 1Posted - Download
ERDCITL_TR12-6_r6.pdf
1.5 MBAdded in Solicitation version 1Posted - Download
ufc_3_260_01_2019_c1.pdf
70 MBAdded in Solicitation version 1Posted - Download
ufc_3_535_01_2017_c4.pdf
20 MBAdded in Solicitation version 1Posted - Download
tinkerafb_INRMP.pdf
16 MBAdded in Solicitation version 1Posted - Download
EM_385-1-1.pdf
10 MBAdded in Solicitation version 1Posted - Download
ufc_3_600_01_2016_c6.pdf
9.9 MBAdded in Solicitation version 1Posted - Download
tinkerafb_INRMP_App G.pdf
4.6 MBAdded in Solicitation version 1Posted - Download
dafman91-203.pdf
3.8 MBAdded in Solicitation version 1Posted - Download
dafi21-101_afmcsup_afmcgm2023-01.pdf
2.8 MBAdded in Solicitation version 1Posted - Download
afi91-202_afmcsup.pdf
2.7 MBAdded in Solicitation version 1Posted - Download
dafi21-101.pdf
2.5 MBAdded in Solicitation version 1Posted - Download
ufc_3_260_04_2018.pdf
2.3 MBAdded in Solicitation version 1Posted - Download
ufc_3_601_02_2021.pdf
2.1 MBAdded in Solicitation version 1Posted - Download
dafi91-202.pdf
1.9 MBAdded in Solicitation version 1Posted - Download
tinkerafbi13-204.pdf
1.8 MBAdded in Solicitation version 1Posted - Download
afman32-7003.pdf
1.3 MBAdded in Solicitation version 1Posted - Download
dafi13-213.pdf
1.2 MBAdded in Solicitation version 1Posted - Download
afman40-201.pdf
1.1 MBAdded in Solicitation version 1Posted - Download
tinkerafb_HWMP.pdf
1016 KBAdded in Solicitation version 1Posted - Download
afman48-148.pdf
1.0 MBAdded in Solicitation version 1Posted - Download
dafi13-213_tinkerafbsup.pdf
687 KBAdded in Solicitation version 1Posted - Download
TAFB_SOP_outages_v2.pdf
473 KBAdded in Solicitation version 1Posted - Download
afman91-203_oc-alcsup.pdf
389 KBAdded in Solicitation version 1Posted - Download
afi48-104.pdf
317 KBAdded in Solicitation version 1Posted - Download
tinkerafb_INRMP_App E.pdf
225 KBAdded in Solicitation version 1Posted - Download
tinkerafbi21-100.pdf
213 KBAdded in Solicitation version 1Posted - Download
dodio-2000.16v1_afi10-245-o.pdf
37 KBAdded in Solicitation version 1Posted - Download
007200_Attch13_AF487.pdf
1.4 MBAdded in Solicitation version 1Posted - Download
013300_Attch1_TAFBF3000.pdf
234 KBAdded in Solicitation version 1Posted - Download
007100_Attch1_Airfield Construction Waiver.pdf
192 KBAdded in Solicitation version 1Posted - Download
007000_Attch1_TAFB Outage Request Form.pdf
186 KBAdded in Solicitation version 1Posted - Download
007200_Attch14_Information for New Boilers.pdf
144 KBAdded in Solicitation version 1Posted - Download
007200_Attch7b_Monthly Hazardous Usage Report.pdf
123 KBAdded in Solicitation version 1Posted - Download
017800_Attch1_DD1354.pdf
93 KBAdded in Solicitation version 1Posted - Download
007200_Attch9_EMS Awareness Training.pdf
86 KBAdded in Solicitation version 1Posted - Download
007200_Attch7a_AF3952.pdf
40 KBAdded in Solicitation version 1Posted - Download
017800_Attch2_DD1354 Checklist.docx
44 KBAdded in Solicitation version 1Posted - Download
250063_ATT 11_Drawings.pdf
14 MBAdded in Solicitation version 1Posted - Download
image.png
66 KBAdded in Solicitation version 1Posted - Download
HELICAL PILES NOTES.docx
15 KBAdded in Solicitation version 1Posted - Download
image (1).png
243 KBAdded in Solicitation version 1Posted - Download
Room finish schedule.xlsx
10 KBAdded in Solicitation version 1Posted - Download
Door_Window_Schedule.xlsx
21 KBAdded in Solicitation version 1Posted - Download
JOIST SPECIAL INSPECTIONS.xlsx
9.7 KBAdded in Solicitation version 1Posted - Download
PILE SCHEDULE.xlsx
11 KBAdded in Solicitation version 1Posted - Download
ELECTRICAL PANEL SCHEDULE U18L.xlsx
25 KBAdded in Solicitation version 1Posted - Download
250063_ Redline A-502.pdf
309 KBAdded in Solicitation version 1Posted - Download
esvperf_singledual_2023_V2.pdf
670 KBAdded in Solicitation version 1Posted - Download
DESV_Submittal.pdf
457 KBAdded in Solicitation version 1Posted - Download
HE05IN_Dimension_Drawing.pdf
194 KBAdded in Solicitation version 1Posted - Download
z415-bz1.pdf
286 KBAdded in Solicitation version 1Posted - Download
esvEH_singledual_2023_V2.pdf
267 KBAdded in Solicitation version 1Posted - Download
lrad331965pd_spec.pdf
384 KBAdded in Solicitation version 1Posted - Download
REACT VII SA-01.pdf
340 KBAdded in Solicitation version 1Posted - Download
lk406gn05t4_spec.pdf
220 KBAdded in Solicitation version 1Posted - Download
z400i.pdf_safe.pdf
121 KBAdded in Solicitation version 1Posted - Download
TAFB B9001 VAV Schedule.pdf
5.6 KBAdded in Solicitation version 1Posted - Download
ELECTRICAL COMBINED.pdf
53 MBAdded in Solicitation version 1Posted - Download
ARCH-COMBINED.pdf
41 MBAdded in Solicitation version 1Posted - Download
4500-S.pdf
14 MBAdded in Solicitation version 1Posted - Download
4500-CIVIL.pdf
14 MBAdded in Solicitation version 1Posted - Download
4500-MUG.pdf
14 MBAdded in Solicitation version 1Posted - Download
220042 As Built Drawings.pdf
12 MBAdded in Solicitation version 1Posted - Download
overall plan 04.15.2021.pdf
184 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1Solicitation
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- 2Version 2SolicitationCurrent
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
FA813727R0002
Archive Date
Dec 25, 2026
Office Address
TINKER AFB, OK, 73145-9125