Notice ID: 8018951b3b17459cbd5ec3ed8e6501f1Presolicitation

B-52J CERP Production Modification Kits & ICS

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
5:00 PM CDT
Posted
July 1, 2026
Notice type
Presolicitation
Set-aside
No Set aside used
NAICS
336411: Aircraft Manufacturing
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE LIFE CYCLE MANAGEMENT CENTER.BOMBER AIRCRAFT.FA8107 AFLCMC WWK
Place of performance
S Coffeyville, Oklahoma, 73145
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA810726RB001
Notice ID
8018951b3b17459cbd5ec3ed8e6501f1

Description

UPDATE 1 JULY 2026

Attached are the Questions and Answers from the Industry Day held on May 12, 2026. This document includes all questions asked during the event, including those from one-on-one sessions. Please see the attachment, "CUI-QA CERP Industry Day 12May2026." If the Government has inadvertently missed a question, please email the listed POCs, and the document will be updated accordingly with a response.

Please submit any additional questions to Mr. Jason Wycoff (Jason.wycoff@us.af.mil) and Ms. Kacie Cram (Kacie.cram@us.af.mil). 

______________________________________________________________________

UPDATE 12 MAY 2026

Attached are the briefing materials regarding B-52J Commercial Engine Replacement Program (CERP) Production Modification Kits & Interim Contract Support Inudstry Day briefing. Please see attachment, "CUI -B52 CERP Production Kit ICS Industry Day Brief 12May26." The Government will allow industry to submit additional questions in writing via email to the Contracting Officer, Ashley Brink at ashley.brink@us.af.mil.  When submitting questions, please cc the Contract Specialist, Kacie Cram at kacie.cram@us.af.mil.  Please submit any questions NLT COB 20 May, 2026. Any and all questions asked during the industry day event will be sanitized and posted to SAM.gov on a later date.

______________________________________________________________________

UPDATE 11 MAY 2026

The Government is seeking critical feedback from our industry partners to optimize our collaboration and better support mutual mission objectives. As part of our ongoing efforts to modernize operations and streamline mission, we are seeking targeted industry feedback. Your insights are essential to helping us identify potential operational or technical risks and refine our internal acquisition strategy to ensure a successful partnership.

The feedback you provide will directly inform the final operational requirements, streamline the solicitation process, and ensure our acquisition strategy aligns with industry best practices for this specific effort.

Please review and respond to the questions listed in “CUI-B52 CERP PRODUCTION MOD KIT_ICS Questions to Industry” to help us identify areas for improvement and finalize our acquisition approach. Due to the nature of the questions, this document will be restricted.  

To access Controlled Documents:

  1. Submit approved DD Form 2345 via email as noted above.

       2. Ensure your company is registered on the Joint Certification Program (JCP) website at https://www.dla.mil/Logistics-Operations/Services/JCP/. If assistance is needed with JCP, the Help phone number is 1-877-352-2255.

Once steps 1) and 2) above are completed, the DATA CUSTODIAN listed in DD Form 2345 Block 3 should request access to Controlled documents on www.SAM.gov. All other requesters will be rejected.

If interested, please provide responses no later than 22 May 2026 at COB to Ms. Brink and Ms. Cram.

Thank you for your candor, partnership, and dedication to supporting the mission.

Request for Information:

The Government has completed its review of all inquiries submitted prior to the 30 April 2026 deadline. The official responses are provided in the attached document titled "CUI -B52J CERP Production Mod Kit ICS RFI Responses 8 May 26". These clarifications are intended to assist in the final preparation of your submissions and ensure a clear understanding of the mission requirements. 

______________________________________________________________________

UPDATE 16 APRIL 2026:

The B-52 CERP Production Modification Kit & ICS acquisition team is hosting an Industry Days event to provide industry partners with information on the upcoming acquisition. The Government will provide an overview of the program, including technical requirements, solicitation requirements, and the anticipated acquisition schedule. This event is an opportunity for industry to ask questions, provide feedback on the draft Statement of Work (SOW), and for the Government to better understand the current market capabilities. The briefing and all materials presented during this event will be in-person only.    

When: Tuesday May 12 and Wednesday May 13, 2026 (0800 – 1700 CST)

Where: Rose State College 

6420 SE 15th Street

Midwest City, OK 73110

Building: Student Union 213B

Registration: If you are interested in participating in Industry Day, register by navigating the attached link: https://forms.osi.apps.mil/r/WSPCBhLhPg

Attendance is limited to a maximum of four (4) representatives per company. Due to limited seating capacity, registration is on a first-come, first-served basis. Early registration is strongly encouraged. The registration and question deadline is Monday, May 4, 2026.

Failure register by 4 May 2026 at COB will result in incomplete registration and your company will not be able to participate.

One-on-One Sessions: The Government will be holding one-on-one sessions with interested vendors. If you are interested in a one-on-one session, please indicate this in your registration.

Additional information regarding these opportunities will be posted as subsequent modifications to this notice on www.sam.gov.  

Note: The Government reserves the right to cancel these Industry Days up to 5 days before the event and will not be subject to reimburse participants for any travel costs.

__________________________________________________________________________

This draft solicitation is being posted in accordance with RFO 15.101(b). No proposals will be accepted at this time. The Government will allow industry to submit questions in writing via email to the Contracting Officer, Ashley Brink at ashley.brink@us.af.mil.  When submitting questions, please cc the Contract Specialist, Kacie Cram at kacie.cram@us.af.mil.  Please submit any questions NLT COB 30 April, 2026. All questions will be answered here on Sam.gov at a later date.

Notes:

The Governments intends to update Att8-SOW_Att7-BMU_Drawings at a later date to include additional DCU drawings

The Government intends to host an industry day and will post more information as it becomes available, as an update to this Sam.gov posting.

CONTROLLED DOCUMENT ACCESS:

This solicitation contains the DFARS clause 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls. In order to receive any technical data related to this acquisition, offerors must send an email request to the Contracting Officer, Ashley Brink at ashley.brink@us.af.mil. Please cc the Contract Specialist, Kacie Cram at kacie.cram@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO and/or drawing numbers), and a copy of the current, approved DD Form 2345.

The form, including instructions for completing the form, is available at:

https://www.esd.whs.mil/Directives/forms/ or https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf.

The Government is not responsible for incomplete, misdirected, or untimely requests.***

To access Controlled Documents:

  1. Submit approved DD Form 2345 via email as noted above.

       2. Ensure your company is registered on the Joint Certification Program (JCP) website at https://www.dla.mil/Logistics-Operations/Services/JCP/. If assistance is needed with JCP, the Help phone number is 1-877-352-2255.

Once steps 1) and 2) above are completed, the DATA CUSTODIAN listed in DD Form 2345 Block 3 should request access to Controlled documents on www.SAM.gov. All other requesters will be rejected.


If assistance is needed with www.SAM.gov, the Help phone number is 1-866-606-8220.
*Please allow 5 business days for processing of each request.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (28)

  • CUI-QA CERP Industry Day 12May2026.xlsx

    27 KBAdded in Presolicitation version 9Posted
    Requires SAM.gov sign-in
  • CUI -B52 CERP Production Kit ICS Industry Day Brief 12May26.pdf

    2.0 MBAdded in Presolicitation version 8Posted
    Requires SAM.gov sign-in
  • CUI -B52J CERP Production Mod Kit ICS RFI Responses 8 May 26.pdf

    46 KBAdded in Presolicitation version 7Posted
    Requires SAM.gov sign-in
  • CUI-B52 CERP PRODUCTION MOD KIT_ICS Questions to Industry.pdf

    48 KBAdded in Presolicitation version 7Posted
    Requires SAM.gov sign-in
  • DRAFT-Solicitation-FA810726RB001.pdf

    2.0 MBAdded in Presolicitation version 3Posted
    Download
  • Att1 Appendix_A SOW_CERP_Production_Kit_Contract 11Feb26 DRAFT.pdf

    546 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att2-SOW_Att1_Production_Schedule-11Feb26-DRAFT.pdf

    269 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att4-SOW_Att3-Component_Sourcing_and_Kitting_Matrix-DRAFT.pdf

    51 KBAdded in Presolicitation version 4Posted
    Requires SAM.gov sign-in
  • Att3-SOW_Att2-Requirement_Update_Process-11Feb26-DRAFT.pdf

    74 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att5-SOW_Att4-GFP_Sample-11Feb26-DRAFT.pdf

    49 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att8-SOW_Att7-BMU_Drawings.pdf

    38 MBAdded in Presolicitation version 6Posted
    Requires SAM.gov sign-in
  • Att6-SOW_Att5-B52_Configuration_Management_Plan-11Feb26.pdf

    749 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att7-SOW_Att6-Program_Risk_Mangement_Plan-11Feb26.pdf

    983 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att9 Appendix_B CDRL 11Feb26 DRAFT.pdf

    781 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att10-Appendix_C-DD_Form_254-DRAFT.pdf

    197 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att11-Appendix_D-Pricing Matrix_Production_31Mar26-DRAFT.xlsx

    53 KBAdded in Presolicitation version 3Posted
    Download
  • Att12-Appendix_E-B52_CERP_Production_Section_L_Instructions_to_Offer-DRAFT.pdf

    877 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att13-Appendix_F-B52_CERP_Production_Section_M_Evaluation_Factors-DRAFT.pdf

    154 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att14-Appendix_G-AFMC_Form_158-17Mar26-DRAFT.pdf

    188 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att15-Appendix_H-DD_Form_1653-11Mar26-DRAFT.pdf

    123 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att16-Appendix_J-AFMC_260_First_Article_Requirements-25Feb26-DRAFT.pdf

    213 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att17-Appendix_K-AFMC_807_Quality-11Mar26-DRAFT.pdf

    345 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att18-Appendix_L-Government_Rights_In_Data.pdf

    180 KBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • Att19-Appendix_M1-Bidders_Library1-Parts_Description_List-DRAFT.xlsx

    60 KBAdded in Presolicitation version 4Posted
    Requires SAM.gov sign-in
  • B-52J Kit Production SOW Draft_29May25.pdf

    872 KBAdded in Sources Sought version 8Posted
    Requires SAM.gov sign-in
  • Att20-Appendix_M2-B52_CAST.pdf

    55 MBAdded in Presolicitation version 3Posted
    Requires SAM.gov sign-in
  • CERP Production Planning Sources Sought Synopsis UPDATED_29May25.pdf

    190 KBAdded in Sources Sought version 8Posted
    Download
  • CERP Production Planning Sources Sought Synopsis Final_25 Feb 25_OEM.docx

    47 KBAdded in Sources Sought version 8Posted
    Download

Lifecycle

  1. 2
    Version 2Sources SoughtArchived

    B-52J Commercial Engine Replacement Program (CERP) Installation Kit Production and Interim Contractor Support

    Notice 8afd963799744742bbe2ba9040f5c209 on SAM.gov

  2. 3
    Version 3Presolicitation

    Type changed from Sources Sought to Presolicitation

    B-52J CERP Production Modification Kits & ICS

    Notice 536ec4e1fd6747129fd314d425cc125b on SAM.gov

  3. 4
    Version 4Presolicitation

    B-52J CERP Production Modification Kits & ICS

    Notice 56e378f1ada94023a5a1b28835396952 on SAM.gov

  4. 5
    Version 5Presolicitation

    B-52J CERP Production Modification Kits & ICS

    Notice 9fbcd2dc59fd421abcdce354e8082782 on SAM.gov

  5. 6
    Version 6Presolicitation

    B-52J CERP Production Modification Kits & ICS

    Notice bbb20e16119246f38bcda92fc9bf6cd3 on SAM.gov

  6. 7
    Version 7Presolicitation

    B-52J CERP Production Modification Kits & ICS

    Notice baa18eec942b40f78ee5cdee19557272 on SAM.gov

  7. 8
    Version 8Presolicitation

    B-52J CERP Production Modification Kits & ICS

    Notice e0e01ce8517f49f7bc2501c93ebc6dbe on SAM.gov

  8. 9
    Version 9PresolicitationCurrent

    B-52J CERP Production Modification Kits & ICS

    Notice 8018951b3b17459cbd5ec3ed8e6501f1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Request for Proposal Contract Field Teams (CFT) Labor Augmentation Support Requirements (LASR) Program Multiple Award IDIQ Funds are not presently available for this acquisition. No Task Order awards will be made until appropriated funds are available. Funds are anticipated to be available in FY25/FY26. The CFT LASR Program supports multiple customers by providing timely and high-quality maintenance augmentation for fielded active weapon systems worldwide. These CFTs can perform modification, organizational/ intermediate/depot maintenance, inspection, and repair of active systems in the US Government inventory, such as aircraft: fixed-wing, rotary-winged and drone; vehicles; aerospace equipment; missile systems; subsystems such as engines, communications, and cryptologic equipment; and ground support equipment. Efforts will include on-site Organizational level (O), Intermediate/Field (I), and Depot/Sustainment (D) level maintenance support at customer (government-owned or government-leased) facilities located both in the continental United States (CONUS) and outside the continental United States (OCONUS). All weapon systems supported under the CFT LASR contract will be non-commercial and must have Government-owned technical data. The objectives and requirements identified within the Attachment 1 - Performance Work Statement are described in general terms. Each task order (TO) will be tailored to address customer specified task order requirements, scheduling, task order options, and performance criteria. As with any contract, clearly understanding the task and defining the requirement is the most important step a customer can take to assure a successful outcome. The purpose of the CFT LASR contract is to provide government organizations with the ability to augment their organic maintenance capabilities with qualified contract maintenance personnel. The CFT LASR contract does not provide for and cannot fulfill organizational needs for Total System Performance Responsibility (TSPR), Turn-Key Operations, Government-Owned Contractor-Operated (GOCO) facilities, or logistics-only support operations. The CFT LASR contract cannot be utilized to fulfill organizational needs for personal services or inherently governmental functions. The Government is establishing a Multiple Award Indefinite-Delivery Indefinite-Quantity solicitation/contract as contemplated by FAR 16.504 and referenced in FAR 52.216-22 Indefinite Quantity. Task orders will be awarded using the procedures found in FAR 16.505(b)(1). The contract type is combination of Firm Fixed Price, Cost Reimbursement, and Time & Materials. The estimated period of performance includes one 5-year basic ordering period and one 5-year option period for a potential total of up to ten (10) years. Because the CFT LASR is a multiple award acquisition, the dollar amount issued under any CFT LASR contract/task order will count towards the total contract maximum of $7,009,592,463.00. The sum contract value of all CFT contracts/task orders shall not exceed the total program ceiling. The contract maximum is $7.009B for all task orders issued under the multiple CFT basic contracts. Awards will neither be based on the Lowest Price Technically Acceptable (LPTA) nor Tradeoffs. Within the best value continuum, FAR 15.101 defines best value as using any one or a combination of source selection approaches. For CFT LASR, the best value basis for award will be determined by utilizing the Highest Technically Rated Offerors (HTRO) Minimum Technical Threshold Rating (MTTR) approach. HTRO will best achieve the objective of awarding contracts to Offerors meeting the LASR program’s primary goals and objectives by providing rapid labor augmentation capability for all levels of maintenance. Solicitation instructions and information regarding evaluation criteria can be found in Attachment 4, Section L - Instructions to Offerors and Attachment 6, Section M - Evaluation Factors for Award. This solicitation is a Partial Set-Aside of task orders for small businesses and potentially other socioeconomic categories as defined in FAR 19.000(a)(3), that the Government estimates will require the contractor to provide less than 100 full-time equivalents (FTEs) of personnel per task order in the CONUS or less than 50 FTEs OCONUS. Only qualifying small businesses will be eligible to compete for set-aside task orders. Task orders larger than the partial set-aside will be available for competition among contractors (large or small) who successfully compete under the non-set-aside portion of this solicitation for the Full and Open Competition Pool. Small Business offerors shall clearly indicate the pool(s) in which they intend to compete on the front page of the RFP. Small businesses may elect to compete in either or both competition pool(s). If a small business elects to compete in the full and open pool, they must submit a separate proposal, to include all volumes, for the Full & Open Competition Pool and meet all the criteria for that pool to be eligible for award. Successfully performing small businesses may become eligible to expand into the full and open pool IAW FA8108.52.219-9ZH6 and FA8108.52.216-9ZH7 located in Attachment 2, H-Clause. Foreign participation is prohibited. The Contracting Officers listed in this posting are the sole points of contract for this solicitation. Updated proposals will not be accepted for Amendment 0004. Amendment 0001 - The proposal due date is extended to 5:00PM CST on August 26, 2024. Amendment 0002 - The purpose of this amendment is to provide Q&A answers and make administrative changes to the RFP and accompanying attachments. The Government's Q&A response can be found in the Attachments section of this posting. Amendment 0003 - The purpose of this amendment is to re-open competition, make administrative changes to the RFP and accompanying attachments that includes changes to submission requirements for Factor 1 AS9100D Certification. Please see the summary of changes within the posting on sam.gov. As a result of this amendment, all Offerors who submitted a timely proposal in response to the proposal due date of August 26, 2024 at 5:00PM CST shall be notified by the Contracting Officer via email that the solicitation has been amended. Offerors will be provided the opportunity to either submit a revised proposal in its entirety or choose to certify in writing that their original proposal submission(s) remain valid. Offerors are encouraged to review the latest solicitation amendment and attachments against their original proposal submission before choosing to certify in writing that their original proposal submission(s) remain valid. Offerors shall certify in writing stating that the Offeror will stand on their original proposal dated in accordance with their original proposal submission. If an Offeror chooses to keep their original proposal submission, the Offeror must still submit a signed SF30 for Amendment 0003. Additionally, the Offeror shall state the proposal is valid for 365 days from the date of issuance of Amendment 0003. Summary of Changes - Amendment 0003 - Please see attached Summary of Changes Questions for Amendment 0003 will be taken through 20 December 2024 at 12pm CST. Please send questions to BOTH Colton Kalivas (colton.kalivas@us.af.mil) and Jennifer Russ (jennifer.russ@us.af.mil). Amendment 0004 - The purpose of this amendment is to remove/update mandated Provisions and Clauses in accordance with Executive Orders 14173, 14168 and 14148; Class Deviation 2025-O0003 and 2025-O0004 and update the PWS and CDRLs/DIDs for A006 and A007. Please see the summary of changes within the posting on sam.gov. As a result of this amendment 0004, no updated proposals will be accepted; however, you must return a signed copy of the SF30 for Amendment 0004. Summary of Changes - Amendment 0004 - Please see attached Summary of Changes
-Solicitation01/22/2025
UPDATE as of 15 Dec 23. The Agency has posted a follow-up pre-solicitation draft RFP at the link below. Questions/Responses are due 22 Dec 2023. https://sam.gov/opp/2e70e62822b84d6abe81089d52e7c4c4/view UPDATE as of 2 Feb 23. This procurement is still being worked, however, it has been pushed back; therefore, we do not have an anticipated release date of the offiical RFP. If anything changes, I will post it here. Q&A are still being worked from the initial draft RFP as well. Please submit any feedback in regards to the attachments by 3pm on 5 Dec 22. The Governmnet is NOT looking for a proposal at this time. This is a DRAFT RFP. The Government is NOT looking for proposals at this time. FUNDS ARE NOT AVAILABLE at this time. Ths is being posted for informational purposes only. An amended RFP will be forthcoming and will contain more information along with a draft DD254 and Pricing Infomration.
-Pre-Solicitation12/05/2022
The United States Air Force through Air Force Sustainment Center (AFSC), Tinker AFB 73145 is contemplating the Remanufacture of Liquid Oxygen Tanks. The contractor shall provide all labor, facilities, equipment and all material to accomplish the remanufacturing. The remanufacture of Liquid Oxygen Tanks shall meet all requirements defined by the Statement of Work. This item has qualification requirements which a prospective vendor must satisfy. A firm fixed price, 5-year (3-year basic, 2-year option period) Requirements type contract is contemplated. The requirements set forth in this notice are defined per Purchase Request FD20302502454 as follows: Written response is required. Item 0001: 1660-00-079-4325BO - P/N 10C-0012-0057 - Cage 19062 - BEQ 120ea Item 0002: 1660-00-113-9094BO - P/N 10C-0016-0035 - Cage 19062 - BEQ 60ea Item 003: 1660-00-116-8334BO - P/N 10C-0001-0070- Cage 19062 - BEQ 150ea Item 0004: 1660-00-322-0847BO - P/N 10C-0020-0013 -Cage 19062 - BEQ 750ea Item 0005: 1660-00-788-7353BO - P/N 901914- Cage 19062 - BEQ 40ea Item 0006: 1660-00-874-2793BO - P/N 903480- Cage 19062 - BEQ 25ea Item 0007: 1660-00-908-8504BO - P/N 904515-1- Cage 19062 - BEQ 40ea Item 0008: 1660-00-924-6472BO - P/N 10C-0002-0001 - Cage 19062 - BEQ 75ea Item 0009: 1660-00-925-3198BO - P/N 10C-0005-0057 - Cage 19062 - BEQ 55ea Item 0010: 1660-01-060-2764BO - P/N 905274-1 - Cage 19062 - BEQ 20ea Item 0011: O&A Item 0012: DATA - IAW CDRLS Function: Sphere that contains liquid oxygen internal part of a lox converter. Dimensions: 24.00” l x 24.00” w x 24.00” h and weighs 20.00 lbs. Material: Metal Delivery schedules: Item 0001: 1660-00-079-4325BO - 6ea every 90 days Item 0002: 1660-00-113-9094BO - 5ea every 90 days Item 003: 1660-00-116-8334BO - 8ea every 90 days Item 0004: 1660-00-322-0847BO - 40ea every 90 days Item 0005: 1660-00-788-7353BO - 3ea every 120 days Item 0006: 1660-00-874-2793BO - 2ea every 120 days Item 0007: 1660-00-908-8504BO - 3ea every 120 days Item 0008: 1660-00-924-6472BO - 4ea every 90 days Item 0009: 1660-00-925-3198BO - 3ea every 90 days Item 0010: 1660-01-060-2764BO - 2ea every 120 days These delivery schedules are based on the current need and demands. Early delivery is acceptable. This will best meet the needs of the war fighter. Ship To: SW3211 Duration of Contract Period: 5-year basic (3-year basic, 2-year option period) Qualification Requirements: QUALIFICATION REQUIREMENTS APPLY. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office at 405-739-7243. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. Part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from approved sources. In order to receive any technical data related to this acquisition, offerors must send an email request to AFLCMC.LZP.PUBSALES@us.af.mil. Release of any data is subject to applicable data rights. The request shall be on company letterhead and include the applicable solicitation number, the specific data needed (including TO and/or drawing numbers), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.** Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond repairable limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor, prior to determination that such equipment is beyond repairable limits, shall be included in the unit price(s) of the listed item(s). Condemned units will not be counted as production Export Control: N/A This is a single source effort. Set-aside: N/A NAICS: 336413 PSC/FSC: 1660 The Government intends to issue solicitation on or about 1 December 2026 with a closing response date on or about 14 January 2027. This notice does not in itself represent the issuance of a formal request for proposal and is not intended to be taken as such. Based upon market research, the Government will not be using policies contained in Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested parties may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice. All questions regarding this notice are to be submitted in writing via E-mail. All questions submitted to this office are subject to be posted in this notice along with the appropriate response(s). Vendor identities will not be disclosed. Prospective offerors must comply with all the requirements of the solicitation and any attachments thereto to be considered responsive. All offerors are to specify in their response whether they are a large business, small business, small, disadvantaged business, 8(a) concern, women-owned small business, HUBZone small business, veteran-owned small business or service-disabled veteran-owned small business. Also, offerors must specify whether they are a U.S. or foreign-owned firm. OMBUDSMAN (AUG 2005) (An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition). The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to the source of concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process. Interested parties are invited to call the Ombudsman at 405-736-3273. DO NOT CALL THIS NUMBER FOR SOLICITATION REQUESTS. Electronic procedures will be used for this solicitation. No telephone requests. Only written or emailed requests received directly from the requestor are acceptable. Point of Contact: Nonika Allen, Contract Specialist, Nonika.allen.1@us.af.mil Amy Gil, Contracting Officer, Amy.gil@us.af.mil
-Pre-Solicitation11/24/2026
The US Air Force Life Cycle Management Center (AFLCMC) F100 Program intends to issue a sole source “C”-type contract (named F100 Engine Exchange) to Pratt & Whitney (P&W), a Division of RTX Corporation for a “no-cost” exchange of property whereby the Government will deliver 51 F100-PW-220 engines to the Contractor, in exchange for the Contractor delivering 13 F100-229 new engine augmentor modules to the Government. A Sources Sought Synopsis (SSS) FA8124-RFI-AUG-2026 was posted from 4 August 2026 through 3 September 2026. Results from the SSS did not indicate any source other than P&W could perform the work under this contract at the prime level without the government incurring unacceptable delays and substantial duplication of costs not recoverable through competition. The government is awarding this contract under the authority of RFO 6.103-1,"Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." A Justification and Approval (J&A) for using Other Than Full and Open Competition was approved on 23 October 2026. All responsible sources may submit a capability statement to the Contracting Officer by the date listed in this notice to be considered by the agency. Respondents shall specify status as a large business, small business, small disadvantaged business, 8(a) concern, women-owned small business, economically disadvantaged women-owned small business, HUBZone small business, veteran-owned small business, or service-disabled veteran-owned small business. This synopsis does not constitute an Invitation for Bids (IFB) or a Request for Proposals (RFP), nor does it restrict the Government to an ultimate acquisition approach. The government will not reimburse any costs associated with preparing or submitting a response to this notice. Due to security access requirements, foreign participation is not permitted at the prime contractor level. Contracting Activity: AFLCMC/LPK, 3001 Staff Dr, Tinker AFB, OK 73145.
-Pre-Solicitation11/17/2026
The USAF KC-46A Program Office is issuing this Request for Information (RFI) to identify sources capable of providing comprehensive Operations and Sustainment (O&S) for the KC-46A Systems Integration Laboratory (SIL), a high-fidelity testing center for the aircraft's software, avionics, and hardware. The government is seeking a contractor to act as a system integrator to provide integrated software sustainment and development for the KC-46 SIL, operating within a government facility at Tinker AFB, OK. Core services will include, but are not limited to: System integration for software maintenance, patching, integration, and lifecycle support. Operation and sustainment of complex Hardware-in-the-Loop (HIL) lab topologies and simulation environments. Management of federated multi-bus avionics integration (ARINC, MIL-STD-1553B), software partitioning (ARINC 653), and cybersecurity configurations. Execution of software verification and validation under FAA (DO-178B/C, DO-254) and military certification standards. Collaboration with government personnel in a Public-Private Partnership (P3) environment. This is a Request for Information (RFI) for market research and planning purposes ONLY. This does not constitute a Request for Proposal (RFP). The Government will not award a contract on the basis of this RFI.
-Market Research12/11/2026

Additional Details

Solicitation Number

FA810726RB001

Archive Date

Jul 15, 2027

Office Address

TINKER AFB, OK, 73145-3303