16292 Steam Boiler Replacement
Active, responses due . Full description on SAM.gov.
Description
Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (26)
- Download
questions.docx
16 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Phase 3 and 4 as-built electrical.pdf
21 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Phase 2 - as-built electrical.pdf
21 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Phase 1 as-built electrical.pdf
1.9 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
16292 Solicitation Boiler Replacement Amd 1.pdf
286 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf
56 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
A005 - System Safety Program Plan DI-SAFT-81626.pdf
56 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
A006 - Accident-Incident Report DI-SAFT-81563.pdf
56 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
A004 - As Built Configuration List DI-SESS-81830.pdf
56 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf
56 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf
56 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Phase 2 as-built mechanical.pdf
15 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Phase 1 as-built mechanical.pdf
2.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Pages from FY06 FY07 As-Builts Vol 2.pdf
1.8 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
G14_Hill_AFB_IFS_Electrical.pdf
400 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf
208 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf
465 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B1515 phases 3 and 4 gas lines.png
298 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B1515 phase 2 gas line.png
254 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B1515 phase 1 gas line.png
174 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
3-inch gas line at B1515.png
1013 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
RFIs for Bldg 1515.xlsx
32 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
16292 Boiler Replacement SOW (9-4-26) Final.pdf
647 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf
291 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
16292_Wage Determinations.pdf
61 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
16292 Solicitation Boiler Replacement.pdf
287 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
16292 Steam Boiler Replacement
- 2Version 2Combined Synopsis/Solicitation
16292 Steam Boiler Replacement
- 3Version 3Combined Synopsis/Solicitation
16292 Steam Boiler Replacement
- 4Version 4Combined Synopsis/Solicitation
16292 Steam Boiler Replacement
- 5Version 5Combined Synopsis/Solicitation
16292 Steam Boiler Replacement
- 6Version 6Combined Synopsis/Solicitation
16292 Steam Boiler Replacement
- 7Version 7Combined Synopsis/SolicitationCurrent
16292 Steam Boiler Replacement
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
FA822226Q3345
Archive Date
Nov 14, 2026
Office Address
HILL AFB, UT, 84056-5805