INDUSTRIAL PROCESS WASTE (IPW) CLEANING
Archived on March 24, 2026. Original response deadline: . Full description on SAM.gov.
Description
Equipment to be cleaned is used for aircraft programmed depot maintenance operations. It includes paint facilities (booths and bays), plating and rinse tanks, degreasers, sanding booths, robotic equipment and room, metal band saw, trench drains, paint stripping booth, storm drains, floor recovery systems, vacuum systems, grit blast system, parts cleaner, air flow tunnels and vent plenum drain screens, stripping bay, water wash grinding booths and dust collectors.
Many of the industrial equipment processes produce hazardous residue and waste. We have sanding booths, grinding booths, and paint booths that need filter change-outs that may be contaminated with heavy metals, plating tanks that require charging with new chemicals, extraction of chemicals, cleaning, and wiping free of residues, industrial waste trench drains and air tunnels that need to be cleaned, and equipment that needs cleaning and wiping down. The plating tanks we have are for chemical mill, etching, chrome, various acids, stripping, degreasing, and rinse. These equipment cleaning services require proper containment (packaging and labeling) and transportation of hazardous waste to the Hazardous Waste Processing Facility on Robins AFB, GA. (See attached PWS for full details)
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 3 of 3 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | DEPT OF THE AIR FORCE | Feb 10, 2026 | 29.4 KB | |||
| Sources Sought | DEPT OF THE AIR FORCE | Feb 10, 2026 | 126.01 KB | |||
| Sources Sought | DEPT OF THE AIR FORCE | Feb 10, 2026 | 401.83 KB |
Lifecycle
80574- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 2×Market ResearchCurrentFeb 8, 2026
INDUSTRIAL PROCESS WASTE (IPW) CLEANING
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
80574
Archive Date
Mar 24, 2026
Office Address
ROBINS AFB, GA, 31098-1672