Notice ID: 48d29af7048e4e2086bf8cf31c411414Solicitation
Glenn Logistics and Metrology (GLAM) Final Request for Proposal (RFP)
Archived on November 23, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−05:00
- Posted
- November 2, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541614: Process, Physical Distribution, and Logistics Consulting Services
- Agency
- National Aeronautics and Space Administration
Notice details
- Office
- NASA GLENN RESEARCH CENTER
- Place of performance
- Cleveland, OH, 44135
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 80GRC023R0023
- Notice ID
- 48d29af7048e4e2086bf8cf31c411414
Description
Glenn Logistics and Metrology (GLAM) Amendment 3 - Clarification to Box Submission & Extension to Proposal Submission Deadline to 5:00pm Eastern Time, Wednesday, November 8, 2023 Please note that any offeror wishing to submit a proposal must email the RFP Government points of contact the email address(es) used to make a box account or for an existing account no later than 11:59pm Eastern Time, Sunday, November 5, 2023. If an offeror does not send the email addresses used to create or use an existing Box account before the time above, a proposal will not be accepted. Please see the updated language in Provision L.24 and Attachment J.2.8 for full details. Please see the updated attachments included with Amendment 3: 80GRC023R0023 GLAM RFP Amendment 3_Final (New) GLAM Request for Proposal T&Cs_Amendment 3 (Updated) Attachment J.2.8 - Instructions for Setting up a Box Account_Amendment 3 (Updated) Amendment 2 - Questions & Answers and New/Edited Attachments Please see all the new/edited attachments included with Amendment 2: Amendment 2 Cover Page (New) Amendment 2 GLAM Questions and Answers (New) GLAM Terms & Conditions (Updated) Attachment J.1.12 - Labor Category Qualifications (Updated) Attachment J.2.10 - Historical Priority Code and Work Center Data (New) Attachment J.2.11 - Representative GFE and Customer Data (New) Attachment J.2.12 - GLWI-CO-8730.001D Glenn Instrument Pool Operating Instructions (New) Amendment 1 - Extension of proposal submission due date to 5:00pm Eastern Time, Monday, November 6, 2023. Please see the attached, signed Amendment 1 80GRC023R0023 Amendment 1_Final Posting of Final Request for Proposal (RFP) Please see the attached documents for all RFP information. Documents posted on SAM.gov include: GLAM Final Request for Proposal (RFP) Cover Letter_Final Glenn Logistics and Metrology Request for Proposal Attachment J.1.1 Acronym List and Glossary Attachment J.1.2 Applicable Regulations and Procedures Attachment J.1.3 Collective Bargaining Agreement Attachment J.1.5 GRC Installation Accountable Government Property (IAGP) Attachment J.1.6 Government Furnished Vehicles and Equipment Maintained by the Contractor Attachment J.1.8 Computer Applications Attachment J.1.10 Performance Standards Attachment J.1.11 Quality Assurance Surveillance Plan (QASP) Attachment J.1.12 Labor Category Qualifications Attachment J.1.13 Surveillance Plan Attachment J.1.14 Wage Determination No. 2015-4727 Attachment J.1.16 - Requirements for Annual Self-Evaluation of the Organizations Safety and Health Management System (SHMS) Attachment J.2.1 Cognizant Audit Office Template (CAOT) Attachment J.2.2 Contract Monthly Safety Summary Sample Form Attachment J.2.3 Metrology and Calibration Laboratory Capabilities Listing Attachment J.2.4 Past Performance Questionnaire Attachment J.2.5 Price Template Attachment J.2.6 Sample Metrics Report and Historical Data Attachment J.2.7 Sample NASA Form 533M & 5333Q Attachment J.2.8 - Instructions for Setting up a Box Account Attachment J.2.9 Standard Form 1408 Preaward Survey of Prospective Contractor All interested parties should follow the communication instructions found within the RFP.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
80GRC023R0023- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Market ResearchNov 10, 2022
Glenn Logistics And Metrology (GLAM)
- Special NoticeMar 31, 2023
Glenn Logistics And Metrology (GLAM)
- 3×Pre-SolicitationMay 26, 2023
Glenn Logistics and Metrology (GLAM) Presolicitation Synopsis & Industry Day Invitation
- 4×SolicitationCurrentSep 29, 2023
Glenn Logistics and Metrology (GLAM) Final Request for Proposal (RFP)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Contractor answers to questions 1. Contractor experience and technical qualifications Question: May a newly established small business satisfy the minimum requirement of three years of wall-to-wall pharmacy inventory experience and experience at three pharmacies through the qualifications of proposed key personnel, subcontractors, or teaming partners? Will general retail, grocery, military inventory, or equipment-accountability experience qualify instead of pharmacy inventory experience? Government Response: No. 2. Historical inventory quantities, values, and workload Question: Can the Government provide historical inventory line-item counts, SKU quantities, replacement values, pharmacy sections, inventory areas, and prior inventory durations for each of the six facilities, separated by inpatient and outpatient pharmacies? Can the Government also provide historical staffing levels and facility square footage or shelving quantities? Government Response: Available historical inventory information will be provided in the attachment referenced by the Government. FY2026 inventory information is being compiled. Historical staffing levels are unknown, and facility square footage or shelving quantities are not available. 3. Physical inventory completion deadline Question: The solicitation contains references to both January 31 and February 28 for completing physical inventories. Which deadline governs? Government Response: All physical inventories at the six VA facilities shall be completed no later than January 31 of the applicable contract year. All final reports, validations, corrections, and required closeout documentation shall be completed and submitted no later than February 28 of that year. 4. Inventory scheduling and completion requirements Question: May the six facilities be inventoried sequentially by one crew, or must multiple facilities be inventoried concurrently? Are weekend or after-hours inventories permitted, and must each facility's inventory begin at 8:00 a.m. and be completed within one business day? Government Response: The six facilities may be inventoried sequentially between January 1 and January 31, provided that each facility's physical inventory is completed within one business day. Inventories shall ordinarily begin at 8:00 a.m. local time. Weekend work, after-hours access, and inventory dates must be coordinated with each individual VA Medical Center. One original response suggested concurrent scheduling, while several others expressly permitted sequential scheduling. This draft follows the repeated sequential-scheduling responses and should be confirmed. 5. Automated dispensing systems and controlled substances Question: Is the Contractor required to physically count medications contained in automated dispensing cabinets and packaging systems, or will the Government provide system-generated inventory reports? Who is responsible for counting controlled substances? Government Response: The VA Medical Center Pharmacy will generate inventory reports from applicable automated dispensing and packaging systems for incorporation into the Contractor's final reports. Controlled substances will be physically counted by authorized VA Pharmacy personnel, and the Contractor shall incorporate the Government-provided results into the final inventory reports. 6. Government-furnished data and pricing information Question: Will the Government provide product master files, McKesson Prime Vendor pricing information, direct-purchase costing information, and automated-system inventory extracts? What information must the Contractor obtain independently? Government Response: No. No, Vendor should get this from McKesson, Yes, Must meet the requirements of the SOW. 7. Final inventory report format and submission Question: What electronic format and data elements are required for final inventory reports? Will the Government provide a sample report template, and may reports be submitted after February 28 if the physical inventory was completed by January 31? Government Response: A separate electronic inventory report shall be submitted for each facility within seven calendar days after completion of its physical inventory. The report shall include facility, pharmacy/section, item name and strength, package description, applicable NDC/UPC/UPN, McKesson item number where applicable, quantity, current package price, extended replacement cost, section/location, and total inventory replacement cost. Please email mario.russell@va.gov for VISN 09 Spreadsheets. Reports shall be compatible with Microsoft Excel or an equivalent Government-approved spreadsheet application. The Government will not provide a sample report template. All final reports and required corrections must be completed by February 28. Reports submitted after that deadline will not meet the stated requirement. 8. Contractor equipment, software, and access Question: May the Contractor use its own handheld scanners and inventory software? Are specific scanning devices, software platforms, or VA network integrations required? What security and access requirements apply? Government Response: The Contractor may use its own scanners and inventory software, provided they meet the SOW requirements. 9. Pharmacy inventory scope and storage locations Question: Does outpatient inventory include satellite pharmacies and other pharmacy-controlled storage locations? Are medications stored in specialized or low-temperature refrigerators included? Government Response: The number and type of outpatient and satellite pharmacy locations vary by facility. All applicable medications under pharmacy control, including medications stored in specialized refrigeration units, shall be included unless specifically excluded by the SOW. The Contractor shall coordinate the inventory areas with each facility. 10. Incumbent contractor and historical contract information Question: Is this a new requirement or a recompete? If there is an incumbent contractor, what is the previous contract number, awarded contract value, and total price? Government Response: Professional Inventory Control Systems INC, 36C24926P0139, $19,200.00, $19,200.00. 11. Subcontractor participation and on-site staffing Question: May a small business prime contractor use a subcontractor to perform physical inventories under the prime's management and quality control? Must the prime contractor provide its own personnel on-site during each inventory? Government Response: No 12. Past performance evaluation Question: Will an offeror without directly relevant past performance receive a Neutral rating rather than an Unacceptable rating? Government Response: Neutral as this is based of LTPA. 13. Insurance and bonding Question: What insurance coverage and bonding requirements apply, including minimum limits, when evidence must be submitted, and whether a subcontractor's insurance may satisfy any part of the requirement? Government Response: Please reference the SOW. 14. Service Contract Labor Standards wage determination Question: The SOW references an applicable Department of Labor wage determination, but none is attached. Which wage determination applies to this requirement? Government Response: No Wage Determination applies. 15. Implementation plan submission Question: Is the implementation plan required with the technical quotation, or may it be submitted after contract award? Government Response: No. This is based off LTPA 16. Solicitation status and amendments Question: Are the posted SOW and evaluation criteria final for quotation purposes, or does the Government anticipate issuing an amendment to clarify or revise the requirements? Government Response: Final. | - | Special Notice | 11/15/2026 |
1. Contractor experience and technical qualifications Question: May a newly established small business satisfy the minimum requirement of three years of wall-to-wall pharmacy inventory experience and experience at three pharmacies through the qualifications of proposed key personnel, subcontractors, or teaming partners? Will general retail, grocery, military inventory, or equipment-accountability experience qualify instead of pharmacy inventory experience? Government Response: No. 2. Historical inventory quantities, values, and workload Question: Can the Government provide historical inventory line-item counts, SKU quantities, replacement values, pharmacy sections, inventory areas, and prior inventory durations for each of the six facilities, separated by inpatient and outpatient pharmacies? Can the Government also provide historical staffing levels and facility square footage or shelving quantities? Government Response: Available historical inventory information will be provided in the attachment referenced by the Government. FY2026 inventory information is being compiled. Historical staffing levels are unknown, and facility square footage or shelving quantities are not available. 3. Physical inventory completion deadline Question: The solicitation contains references to both January 31 and February 28 for completing physical inventories. Which deadline governs? Government Response: All physical inventories at the six VA facilities shall be completed no later than January 31 of the applicable contract year. All final reports, validations, corrections, and required closeout documentation shall be completed and submitted no later than February 28 of that year. 4. Inventory scheduling and completion requirements Question: May the six facilities be inventoried sequentially by one crew, or must multiple facilities be inventoried concurrently? Are weekend or after-hours inventories permitted, and must each facility's inventory begin at 8:00 a.m. and be completed within one business day? Government Response: The six facilities may be inventoried sequentially between January 1 and January 31, provided that each facility's physical inventory is completed within one business day. Inventories shall ordinarily begin at 8:00 a.m. local time. Weekend work, after-hours access, and inventory dates must be coordinated with each individual VA Medical Center. One original response suggested concurrent scheduling, while several others expressly permitted sequential scheduling. This draft follows the repeated sequential-scheduling responses and should be confirmed. 5. Automated dispensing systems and controlled substances Question: Is the Contractor required to physically count medications contained in automated dispensing cabinets and packaging systems, or will the Government provide system-generated inventory reports? Who is responsible for counting controlled substances? Government Response: The VA Medical Center Pharmacy will generate inventory reports from applicable automated dispensing and packaging systems for incorporation into the Contractor's final reports. Controlled substances will be physically counted by authorized VA Pharmacy personnel, and the Contractor shall incorporate the Government-provided results into the final inventory reports. 6. Government-furnished data and pricing information Question: Will the Government provide product master files, McKesson Prime Vendor pricing information, direct-purchase costing information, and automated-system inventory extracts? What information must the Contractor obtain independently? Government Response: No. No, Vendor should get this from McKesson, Yes, Must meet the requirements of the SOW. 7. Final inventory report format and submission Question: What electronic format and data elements are required for final inventory reports? Will the Government provide a sample report template, and may reports be submitted after February 28 if the physical inventory was completed by January 31? Government Response: A separate electronic inventory report shall be submitted for each facility within seven calendar days after completion of its physical inventory. The report shall include facility, pharmacy/section, item name and strength, package description, applicable NDC/UPC/UPN, McKesson item number where applicable, quantity, current package price, extended replacement cost, section/location, and total inventory replacement cost. Reports shall be compatible with Microsoft Excel or an equivalent Government-approved spreadsheet application. The Government will not provide a sample report template. All final reports and required corrections must be completed by February 28. Reports submitted after that deadline will not meet the stated requirement. 8. Contractor equipment, software, and access Question: May the Contractor use its own handheld scanners and inventory software? Are specific scanning devices, software platforms, or VA network integrations required? What security and access requirements apply? Government Response: The Contractor may use its own scanners and inventory software, provided they meet the SOW requirements. 9. Pharmacy inventory scope and storage locations Question: Does outpatient inventory include satellite pharmacies and other pharmacy-controlled storage locations? Are medications stored in specialized or low-temperature refrigerators included? Government Response: The number and type of outpatient and satellite pharmacy locations vary by facility. All applicable medications under pharmacy control, including medications stored in specialized refrigeration units, shall be included unless specifically excluded by the SOW. The Contractor shall coordinate the inventory areas with each facility. 10. Incumbent contractor and historical contract information Question: Is this a new requirement or a recompete? If there is an incumbent contractor, what is the previous contract number, awarded contract value, and total price? Government Response: Professional Inventory Control Systems INC, 36C24926P0139, $19,200.00, $19,200.00. 11. Subcontractor participation and on-site staffing Question: May a small business prime contractor use a subcontractor to perform physical inventories under the prime's management and quality control? Must the prime contractor provide its own personnel on-site during each inventory? Government Response: No 12. Past performance evaluation Question: Will an offeror without directly relevant past performance receive a Neutral rating rather than an Unacceptable rating? Government Response: Neutral 13. Insurance and bonding Question: What insurance coverage and bonding requirements apply, including minimum limits, when evidence must be submitted, and whether a subcontractor's insurance may satisfy any part of the requirement? Government Response: Please reference the SOW. 14. Service Contract Labor Standards wage determination Question: The SOW references an applicable Department of Labor wage determination, but none is attached. Which wage determination applies to this requirement? Government Response: No Wage Determination applies. 15. Implementation plan submission Question: Is the implementation plan required with the technical quotation, or may it be submitted after contract award? Government Response: No 16. Solicitation status and amendments Question: Are the posted SOW and evaluation criteria final for quotation purposes, or does the Government anticipate issuing an amendment to clarify or revise the requirements? Government Response: Final. | - | Combined Synopsis | 11/15/2026 |
Department of Veterans Affairs Veterans Health Administration Program Contracting Activity Central (PCAC) November 4, 2026 PRESOLICITATION NOTICE Initial Outfitting, Transition, and Activation Services in support of the North Kansas OPC 100% SDVOSB SET ASIDE This is a Pre-Solicitation Notice that the Veterans Health Administration (VHA) intends to solicit quotes to provide non-personal Initial Outfitting, Transition, and Activation (IOT&A) services for the North Kansas Outpatient Clinic (OPC). This requirement supports VHA's mission by providing contractor support services to help bring the hospital into full planned operations that will provide health care services to Veterans. This will be a firm-fixed-price contract with an estimated Period of Performance of 38-months. This project proposes to lease an approximately 102,736 NUSF replacement and expanded Outpatient Clinic in the vicinity of Kansas City, MO, including 700 parking spaces. The new facility allows for decompression of the Kansas City VAMC. The lease would allow VA to enhance outpatient services by closing space gaps identified in the SCIP process. The new lease would expand the current Primary Care space, allowing for the full implementation of the PACT model of care delivery, improving operational efficiencies and the Veteran experience. The newly leased right-sized, state-of-the-art, energy-efficient health care facility would provide Primary Care, Mental Health, Specialty Care, Outpatient Surgery and Ancillary services to Veterans in the Kansas City area. The scope includes project support for planning, activating, outfitting, and transitioning the staff and Veterans/patients associated with the project. The scope of services includes Comprehensive Project Management, Comprehensive Interior Design, FF&E, and Space Planning Support; CONOPS and Transitioning Planning; Acquisition Support Services to include package development, Activation, Delivery, Relocation and Installation, Training, and Turnover and Post Occupancy Support for the identified project. This requirement will be set-aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) using FAR Part 12 and 37. To be eligible for an SDVOSB set aside under VA s Veterans First Contracting Program, SDVOSBs must: be verified by the Department of Veterans Affairs (VA) as SDVOSB (see https://search.certifications.sba.gov/ for details) and meet the small business size standard for NAICS 541614. The solicitation is anticipated to be posted on Contract Opportunities for download on or about 19 November 2026. Potential offerors are advised that there may be truncated response time on the solicitation that will follow this Pre-Solicitation notice. Anticipated closing date of the solicitation will be 18 December 2026. Solicitation initial posting date and the closing date are subject to change as necessary. Any questions for this Pre-solicitation notice should be sent via e-mail to both Katherine.Johnson6@va.gov and Kathleen.Klotzbach@va.gov. No telephone requests/questions will be accepted. This Pre-Solicitation notice does not constitute a request for proposals. P.O.C: Katherine.Johnson6@va.gov, Contract Specialist and Kathleen.Klotzbach@va.gov, Contracting Officer | - | Pre-Solicitation | 12/18/2026 |
| - | Awarded | Open | |
Please see attached documents. | - | Solicitation | 12/15/2026 |
Additional Details
Solicitation Number
80GRC023R0023
Archive Date
Nov 23, 2023
Office Address
CLEVELAND, OH, 44135