Notice ID: 030219c9b8754506bff22ff6560f049cSolicitation
GEO-XO Sounder (GXS) Instrument
Archived on September 30, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC−04:00
- Posted
- May 20, 2021
- Notice type
- Solicitation
Notice details
- Office
- NASA GODDARD SPACE FLIGHT CENTER
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 80GSFC21R0027
- Notice ID
- 030219c9b8754506bff22ff6560f049c
Description
Amendment 3 (three) to this soicitation is issued to post Questions and Answers and update Attachment A, Statement of Work and Attachment B, Performance Operations Requirements Document.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
80GSFC21R0027- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationMar 30, 2021
GeoXO Sounder (GXS) Instrument
- 4×SolicitationCurrentApr 30, 2021
GEO-XO Sounder (GXS) Instrument
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This justification provides the rationale for awarding a sole-source follow-on contract (number 80JSC026D0026) valued at $95,000,000 to The Charles Stark Draper Laboratory, Inc. The contract covers development, maintenance, and application of Guidance, Navigation, and Control (GN&C) products and services for the Aeroscience and Flight Mechanics Division (AFMD) within JSC's Engineering Directorate. In accordance with FAR Subpart 5, NASA conducted market research to identify potential sources capable of meeting agency requirements: Sources Sought Notice: Posted August 25, 2025; closed September 10, 2025 Intent to Sole Source Notice: Posted February 26, 2026; closed March 13, 2026 Both notices were published on the Government Point of Entry website (sam.gov) to gauge industry interest and capability to perform the required effort. Based on responses received, the Government determined that only one responsible source exists capable of satisfying agency requirements. No other supplies or services will meet the technical and operational needs of this program. For additional information regarding the decision to contract by other than full and open competition, please refer to the attached Justification for Other than Full and Open Competition (JOFOC) document. | 68% | Sole Source / J&A | Open |
This justification provides the rationale for contracting by other than full and open competition to increase the ceiling value by $18,000,000 of a sole-source contract, number 80JSC021DA005, with The Charles Stark Draper Laboratory, Inc. (Draper) for additional development, maintenance, and application of Guidance, Navigation, and Control (GN&C) products and services for JSC’s Engineering Directorate’s Aeroscience and Flight Mechanics Division (AFMD). A notice of NASA’s intent to award this sole-source action was synopsized on the GPE website (sam.gov) per FAR Subpart 5. An intent to issue a sole-source work order was posted on February 25, 2026 and closed on March 12, 2026. The intent of the notice was to determine any interest and ability of industry to perform the effort. No responses were received from industry regarding this action. See attached JOFOC for further information. | 68% | Sole Source / J&A | Open |
This requirement is to conduct a comprehensive engineering study of the current microearthquake (MEQ) network. The contractor shall perform a complete site survey and analysis of the existing network, which includes approximately 15 permanent seismic monitoring stations, 1 temporary seismic monitoring station, the Joshua Ridge repeater site, and the central data acquisition and processing site at the Navy Geothermal Program Office (GPO) office building at NAWSCL. The primary deliverable is a final Network Upgrade Plan and Cost Analysis Report. This report must provide a detailed plan, including a Plan of Action and Milestones (POAM), and a corresponding Rough Order of Magnitude (ROM) cost estimate for the full modernization of the network hardware, software, and communications infrastructure. The analysis must be objective, impartial, and vendor-agnostic. | 59% | Combined Synopsis | 07/31/2026 |
The Contractor shall provide Analytical Services. BSA has need of chemical, microbiological and/or radiochemical analytical services. BSA is procuring these services to cover objectives, such as environmental monitoring, environmental sampling, or waste characterization to cover three separate areas; (1) Limited Radiological Contract requiring New York State Department of Health (NYSDOH) Environmental Laboratory Approval Program (ELAP) certification; (2) Limited Non-Radiological Contract requiring NYSDOH ELAP certification; and (3) Full-Service Contract, which will cover the analysis of all samples including waste samples and requires NYSDOH ELAP certifications. | 46% | Solicitation | 12/14/2026 |
U.S. Army Reserve, 88th RD has an objective to reduce energy consumption, reduce energy cost, and increase energy resiliency of multiple facilities located in Minnesota and Wisconsin. The 88th RD is seeking to identify additional Energy Conservation Measures (ECMs) that provide measurable energy and cost savings. Potential energy and water saving projects may include but are not limited to: envelope improvements, insulation upgrades, window upgrades, LED upgrades, geothermal heat pumps, lighting, controls, renewable energy generation including photovoltaic solar arrays, retro-commissioning, water conservation measures, heating, ventilation, air conditioning (HVAC) upgrades including boilers, furnaces, split systems, and chillers, battery energy storage systems (BESS), and Hydrogen Fuel Cells and microgrids. Additional ECMs of interest include re-tuning; retro-commissioning and re-commissioning; building automation and control systems; window replacement; minor building-envelope improvements; domestic hot-water system replacement; plug-load analysis and reduction, including refrigerators and freezers; water-leak detection; and other water-efficiency upgrades. The project will evaluate these and other cost-effective opportunities to modernize facilities, improve energy and water resilience, and support the 88th RD long-term energy, water conservation, and resiliency goals (as determined by 88th RD and ARIMD). These efforts align with statutory requirements under 10 U.S.C. § 2911 for energy security and resilience, and 42 U.S.C. § 8287 through the Department of Energy’s (DOE) Fourth-Generation Energy Savings Performance Contract (ESPC) Indefinite Delivery Indefinite Quantity (IDIQ) contract. Responses to this NOO must be received no later than 02 November, 3:00 p.m. (Ft. Belvoir, VA local time). Responses must be completed and submitted to the following email mailbox: DLAEnergy-ESPC@dla.mil | 45% | Solicitation | 11/09/2026 |
Additional Details
Solicitation Number
80GSFC21R0027
Archive Date
Sep 30, 2021
Office Address
GREENBELT, MD, 20771