GovChime
Notice ID: 8f54656c6e014a548b070b8d4d5d0ca6Solicitation

Wallops Airfield Repair Project, Field Carrier Landing Practice (FCLP) Phase 9

Archived on September 17, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−04:00
Posted
August 24, 2022
Notice type
Solicitation
NAICS
237310: Highway, Street, and Bridge Construction
Agency
National Aeronautics and Space Administration

Notice details

Office
NASA GODDARD SPACE FLIGHT CENTER
Place of performance
Wallops Island, 23337
Last updated
Sep 25, 2026

Identifiers

Solicitation number
80GSFC22B0004
Notice ID
8f54656c6e014a548b070b8d4d5d0ca6

Description

NASA intends to award a Firm Fixed Price (FFP) contract to an interested bidder. This procurement will be conducted in accordance with FAR Part 14 (SEALED BIDDING) and Part 36 (CONSTRUCTION) and will be evaluated in accordance with the procedures therein. Offerors shallcomplete blocks 14 thru 20c of the attached Standard Form 1442 and submit with their bid. For this project, in accordance with the Statement of Work, Attachment A, Specifications, Attachment B, and Drawings, Attachment C, referenced in Section J.1, the scope of work including base bid and options shall include but is not limited to: Portland cement concrete (PCC) spall repairs, full depth repairs, full slab replacements, crack sealing, joint sealing, and asphalt concrete (AC) seal coating. Wallops Airfield Repairs, FCLP Phase 9, focuses on performing routine maintenance per the recommendation from Site Specific Report – Airfield Pavement Condition Survey, Wallops Flight Facility dated September 2018. Various PCC and AC repairs to pavements associated with the Runway 28 approach, the taxiways supporting Runway 10-28, and the east B. D-001 ramp. The work to be completed shall include furnishing, as applicable or may be required, all Contractor’s plant, equipment, safety devices, labor, tools, materials, supplies, and services; and performing all operations necessary to a complete project in conformity with the scope of work. This competitive procurement is anticipated to result in a Firm Fixed Price construction contract, under a full and open competition. Site Visit 52.236-27 Site Visit (Construction), Alt I. (FEB 1995). An organized site visit has been scheduled for August 11, 2022, at 10:00 am (EST). Participants will meet outside of the Wallops Flight Facility Badging Office N-001,at 34200 Fulton Street, Wallops Island, VA 23337, to receive their visitor badge. Site Visit Instructions All site visit attendees must be submitted by the Prime Contractor, including legal first name, middle initial, last names, company, citizenship, and phone number via e-mail, to Contract Specialist Tiera Greene at Tiera.M.Greene@nasa.gov and cc’ Contracting Officer Maikeyza Brown at Maikeyza.Brown-1@nasa.gov no later than (NLT) 2:00 p.m. (EST), on August 5, 2022. Please ensure names of attendees submitted for badge access match EXACTLY as indicated on identification to ensure badge access to the site. Please limit site visit attendees to no more than three (5) people including any/all subcontractors. Attendees shall travel to each site location using their own personal vehicle. The Contracting Officer Representative will lead the convoy to each site location. Bid Opening Electronic bid packages must be received by Maikeyza Brown 12:00 p.m. (EST) on September 2, 2022. The bidding opening will take place September 2, 2022, at 2:00 p.m. (EST) via Microsoft Teams. If you have any questions, you may contact the undersigned by email at Maikeyza.Brown-1@nasa.gov. Anyone joining via Microsoft Teams after 2:00 p.m. local time will not be allowed to attend the bid opening. All site visit questions and IFB questions MUST be submitted in writing, electronically to Tiera.M.Greene@nasa.gov and cc’ Maikeyza.Brown-1@nasa.gov on or before August 12, 2022 local time, 2:00 p.m. (EST). Bidders are encouraged to submit questions as soon as possible for consideration. It is the Bidders responsibility to monitor Sam.gov for the release of solicitation amendments (if any). Potential Bidders will be responsible for downloading their own copy of this solicitation and amendments (if any).

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Sep 30, 2023

NAICS

237310

Agency

National Aeronautics and Space Administration

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:80GSFC22B0004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationJun 24, 2022

    Wallops Airfield Repair Project, Field Carrier Landing Practice (FCLP) Phase 9

    Notice 90af61265a5b4f75ad6eaac1e2f896c3 on SAM.gov

  2. 3×
    SolicitationCurrentJul 29, 2022

    Wallops Airfield Repair Project, Field Carrier Landing Practice (FCLP) Phase 9

    Notice 8f54656c6e014a548b070b8d4d5d0ca6 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 001 (4 Nov) The purpose of this amendment is to: (a) Incorporate JB Lindsey Graham Offeror Question and Answer Form. Questions are due back to the Government on or before 10 November at 1200. (b) Incorporate NAAF Repair Taxiway Alpha and Bravo SV - List of Contractors. (c) Incorporate NAAF Site Visit Sign In Sheet 20261104. (d) All other terms and conditions remain unchanged.
69%
Solicitation12/02/2026
64%
AwardedOpen
64%
AwardedOpen
64%
AwardedOpen
This acquisition is for the construction (design-bid-build (DBB)) of aircraft pavements to support multiple airframes including aircraft parking apron and adjoining taxiway. Construction includes concrete aircraft parking and taxi area. Project will provide adequate concrete aircraft access apron and expansion and improvement of existing taxiway, including provision of all required pavement markings in compliance with Air Force Instruction 32-1042 and Engineering Technical Letter 04-02. Project will provide an access road and vehicle parking area to the rear of the aircraft apron. The work will include one (1) pre-priced option to construct; Option No. 1 is for bulk formation under future hangar zone. In accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item, the Government may exercise the option by written notice to the Contractor within 365 days of contract award. The magnitude of this project is estimated between $25,000,000 and $50,000,000. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 237310 AND AVERAGE ANNUAL RECEIPTS OF $45 MILLION OVER THE PAST THREE YEARS. THIS PROCUREMENT IS UNRESTRICTED. The contract completion period is anticipated to be 615 calendar days. This is a source selection procurement requiring the submission of both technical and price proposals. Proposals submitted in response to this solicitation shall be in the English language and in U.S. dollars. The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.202(a)(2)). Therefore, the initial proposal shall conform to the solicitation requirements and should contain the best offer from a technical and price standpoint. Only the three (3) lowest-priced proposals will be evaluated for fair and reasonable pricing and technical acceptability. If none of the three (3) lowest-priced proposals are found to be technically acceptable, then all remaining proposals will be evaluated for fair and reasonable pricing and technical acceptability. The contract resulting from this solicitation will be awarded to that responsible Offeror whose offer, conforming to the solicitation, is determined to be the lowest evaluated price of proposals (within the funds available) meeting the acceptability standards for the technical evaluation factors. The following evaluation factors shall be used to evaluate the technical proposals. FACTOR 1: EXPERIENCE FACTOR 2: PAST PERFORMANCE FACTOR 3: SAFETY FACTOR 4: MANAGEMENT PLAN For Factor 1 Experience, a relevant construction project is defined as new construction of Airfield that includes at least one (1) of the following individual feature: New construction of Airfield Portland Cement Concrete (PCC) Pavement: New airfield (aircraft runway, taxiway, or apron) PCC pavement of at least 10,000 square meters with a minimum concrete thickness of 300 mm. Flexible pavement construction will not be considered when evaluating experience in Airfield PCC Pavements. Only pavement of aircraft runways, taxiways, or aprons will be considered. Projects submitted to demonstrate Airfield PCC Pavements will only be considered if the work was performed by the specific entity proposed for Airfield PCC pavements. Construction shall be completed or substantially completed no earlier than last fifteen (15) years from the date of issuance of this RFP. Substantially complete means at least 90% physically complete. New construction of Airfield Asphalt Concrete (AC) Pavement: New airfield (aircraft apron, taxiway, or runway) AC pavement of at least 10,000 square meters with a minimum asphalt concrete thickness of 50 mm. Airfield PCC pavement construction will not be considered when evaluating experience in Airfield AC Pavements. Only pavement of aircraft apron, taxiway, or runway will be considered. Projects submitted to demonstrate Airfield AC Pavements will only be considered if the work was performed by the specific entity proposed for Airfield AC Pavements. Construction shall be completed or substantially completed no earlier than fifteen (15) years from the date of issuance of this RFP. Substantially complete means at least 90% physically complete. Projects submitted shall collectively demonstrate experience in both individual features: (1) Airfield PCC Pavement and (2) Airfield AC Pavement. Individual features do not have to be within any single project scope. The Request for Proposal (RFP) is anticipated to be available on or around 13 October 2026. Please note that these dates (RFP issuance and response date) are estimates only and will be as shown in the RFP. Printed copies or CDs will not be issued. The RFP will be available on the SAM website. Amendments will be posted to the SAM website. It is the responsibility of the offeror to check the SAM website periodically for any amendments to the solicitation.
57%
Pre-Solicitation12/17/2026

Additional Details

Solicitation Number

80GSFC22B0004

Archive Date

Sep 17, 2022

Office Address

GREENBELT, MD, 20771