Overview

Posted
March 20, 2018
Notice type
Award Notice
NAICS
336411: Aircraft Manufacturing
Agency
National Aeronautics and Space Administration

Notice details

Place of performance
Contractor's Facility
PSC
15: AEROSPACE CRAFT AND STRUCTURAL COMPONENTS
Last updated
Dec 6, 2025
Award date
Mar 8, 2018
Award amount (SAM.gov award notice)
$3.9M

Identifiers

Solicitation number
80JSC018R0008
Notice ID
30824e5fbd612413a7d3d43be8b10ec8
Award number (PIID)
80JSC018C0011

Description

This is modification 3 to the synopsis entitled Gulfstream V Nadir Viewport Installation (GVNVI), 80JSC018R008, which was posted on 12/11/2017. You are notified that the following changes are made to the synopsis: questions and answers are provided below and amendment 1 to the RFP is attached. The following changes have been made to the RFP: 1. the proposal submission due date has been extended from Friday, January 19, 2018, to Thursday, January 25, 2018, and 2. Statement of Work section 5.9 has been updated. Documents related to this procurement will be available over the Internet. These documents will reside on a World Wide Web (WWW) server, which may be accessed using a WWW browser application. Potential offerors are responsible for downloading their own copy of the solicitation and amendments (if any). Q20: Since this is commercial items contract, will the government be providing quality assurance from the Defense Contract Management Agency (DCMA)? A20: NASA does not intend to solicit DCMA quality assurance help for this project. NASA does intend to provide contractor surveillance activities per SOW Section 4.3 and Inspection clauses outlined in the Terms and Conditions sections of the RFP. Q21: Will NASA provide the optical viewport pressure plugs for flight testing? A21: No. Per SOW 5.1.4, the Contractor is responsible for providing optical viewport pressure plugs. Also, note that the Contractor provided pressure plugs are the FAA certificated configuration. SOW Section 5.9 has been updated to clarify ground and flight test requirements. Q22: Are the optical viewport windows acrylic? A22: No, per SOW 5.1.3, the optical viewport windows are glass. Q23: What is driving the optical window fuselage stations of FS 290.5 & FS 339.5? A23: NASA based the locations on existing GV aircraft with similar optical viewport modifications. Q24: It is understood NASA is leveraging a previous modification on another GV aircraft. Is NASA willing to consider alternative Nadir window solutions? A24: NASA has already completed a significant amount of work (e.g. floor modification design and window pack assembly design) based on the design requirements presented in the SOW. Although NASA is interested in creative solutions, the Contractor's proposed solution must meet SOW requirements. Q25: Does NASA need to keep the existing oxygen bottle size, i.e. could a smaller oxygen bottle be installed? A25: No, a smaller oxygen bottle may not be installed. Per SOW Section 5.2.1, the existing oxygen bottle will need to be relocated. Q26: In the Statement of Work, page 9 of 24, Footnote 1, states that NASA will modify the floor structure prior to aircraft delivery. Will the technical data package be made available to the GV Nadir Port contractor in the event it is relevant to the design approach? A26: Yes, NASA will provide the Contractor all modification drawings for the floor structure. Q27: In the Statement of Work, page 10 of 24, Footnote 3, states NASA will provide a window pack assembly with a single and double pane configuration. Must the contractor proposed solution accommodate both solutions or is one intended for FWD and the other for AFT configurations. A27: The Contractor's solution must accommodate both a single and double pane configuration. NASA does not intend for the window pack assemblies to be port specific. The window pack structural interface to the aircraft will be the same for both viewports and the window packs may be installed in either viewport. See drawings 25-0000054 and 25-0000055 in the solicitation technical library. Although not currently shown in drawings 25-0000054 and 25-0000055, NASA plans to design the window pack to support both a single and dual window configuration by revising the design of the window stack structure. Q28: In the Terms and Conditions Document, section 52.212-1, paragraph (c) (page 2 of 60), states prices must be held for 30 days. However Section 52.212-1 paragraph (m) (page 6 of 60) states prices must be held for 120 days. Can you please clarify how long the offer must hold prices with the proposal submission? A28: In accordance with 52.212-1(c), the offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. Therefore, in accordance with paragraph (m) of the addendum to 52.212-1, the offeror shall agree to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers. Q29: We request a 5 day extension to the proposal due date in order to review OEM manuals, mature our design approach and better identify potential risk items, considering this to be a FFP contract. A29: Based on industry feedback, NASA has extended the proposal due date from Friday, January 19, to Thursday, January 25, 2018. Q30: Can you please clarify Terms and Conditions, Section 52.216-90, page 45 of 60? It states the maximum ordering limit is $1,000,000. Does this mean the contract value cannot exceed $1,000,000 or that no single item (labor or ODC) may exceed $1,000,000? A30: Clause 52.216-90, IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (AUG 2013) (JSC PROCUREMENT INSTRUCTION), will only apply to Time-and-Material (T&M) task orders issued under the resulting contract. The cumulative value of all T&M task orders issued shall not exceed $1,000,000. Q31: Regarding the RFP to install Nadir portals in a GV aircraft, is access to Gulfstream specific data a requirement? If Gulfstream data is not available to the Contractor, will it be acceptable to do a detailed survey of the aircraft to obtain all necessary geometry and configuration data to begin the project? A31: NASA does not require that the Contractor have access to original GV technical data such as drawings as long as the Contractor has a feasible engineering plan to obtain the necessary technical data required for the modification. The Contractor will need to have access to some Gulfstream data such maintenance manuals for aircraft disassembly, reassembly, calibration, and system checkout. See SOW Section 5.8.1.

Full description on SAM.gov

Award Overview

Award Number

80JSC018C0011

Award Amount (SAM.gov award notice)

$3.9M

Award Date

Mar 8, 2018

Awardee

Awardee UEI

DCBJZ7CGV7Q1

Original Solicitation

Notice ID: 30824e5fbd612413a7d3d43be8b10ec8

Posted Date: Mar 20, 2018

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

4
  • 80AFRC26P0004
    AVENGER AEROSPACE SOLUTIONS INC
    National Aeronautics and Space AdministrationNAICS 336411
    $3.3MSigned Jul 17, 2026
  • 80AFRC26P0004
    AVENGER AEROSPACE SOLUTIONS INC
    National Aeronautics and Space AdministrationNAICS 336411
    $3.3MSigned Jul 17, 2026
  • 80AFRC26P0004
    AVENGER AEROSPACE SOLUTIONS INC
    National Aeronautics and Space AdministrationNAICS 336411
    $2.8MSigned Jun 26, 2026
  • 80AFRC26P0004
    AVENGER AEROSPACE SOLUTIONS INC
    National Aeronautics and Space AdministrationNAICS 336411
    $2.8MSigned Apr 15, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:80JSC018R0008
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationDec 11, 2017

    Gulfstream Nadir Viewport Installation (GVNVI)

    Notice 9690a5fbc03b2212d8ed4cf71b6215a4 on SAM.gov

  2. SolicitationJan 11, 2018

    Gulfstream Nadir Viewport Installation (GVNVI)

    Notice d6bc35724ca867db951a979200e6f049 on SAM.gov

  3. AwardedCurrentMar 20, 2018

    Gulfstream Nadir Viewport Installation (GVNVI)

    Notice 30824e5fbd612413a7d3d43be8b10ec8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Proposed procurement for NSN 1560011662501 RIB,AIRFOIL: Line 0001 Qty 24 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0468 DAYS ADO Approved sources are 06DM5 5-83978-502; 0C7H8 5-83978-502; 0P657 5-83978-502; 1P642 5-83978-502; 1QJK4 5-83978-502; 29957 5-83978-502; 2V045 5-83978-502; 32821 5-83978-502; 59213 5-83978-502; 6E451 5-83978-502; 82918 5-83978-502. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
63%
Combined Synopsis11/17/2026
Proposed procurement for NSN 1560011244890 STRINGER,AIRCRAFT: Line 0001 Qty 58 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0197 DAYS ADO Approved sources are 06DM5 35-10704-528; 0C7H8 35-10704-528; 0P657 35-10704-528; 1P642 35-10704-528; 1QJK4 35-10704-528; 29957 35-10704-528; 2V045 35-10704-528; 32821 35-10704-528; 3H339 35-10704-528; 3T761 35-10704-528; 59213 35-10704-528; 81205 35-10704-528. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
63%
Combined Synopsis11/13/2026
Proposed procurement for NSN 1560007021472 DUCT ASSEMBLY,BLEED AI: Line 0001 Qty 2 UI EA Deliver To: DLA DISTRIBUTION WARNER ROBINS By: 0258 DAYS ADO This is a source controlled drawing item. Approved source is 70628 12541-105A. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
63%
Combined Synopsis11/13/2026
Proposed procurement for NSN 1560011244885 STRINGER,AIRCRAFT: Line 0001 Qty 45 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0093 DAYS ADO Approved sources are 06DM5 35-10703-527; 0C7H8 35-10703-527; 0P657 35-10703-527; 1P642 35-10703-527; 1QJK4 35-10703-527; 29957 35-10703-527; 2V045 35-10703-527; 32821 35-10703-527; 59213 35-10703-527; 6AUZ3 35-10703-527; 81205 35-10703-527. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
63%
Combined Synopsis11/09/2026
Proposed procurement for NSN 1560013438941 WINDOW PANEL,AIRCRAFT: Line 0001 Qty 1 UI EA Deliver To: DLA DISTRIBUTION JACKSONVILLE By: 0171 DAYS ADO Approved source is 78286 70207-22202-048. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
63%
Combined Synopsis10/30/2026

Additional Details

Solicitation Number

80JSC018R0008

Archive Date

Jan 17, 2019