Notice ID: 67bfaa89ea8e4a0189d0f304f4a7acd1Solicitation

Modifications to the Converter Compressor Facility for SLS Block 1B, Phase 1, John F. Kennedy Space Center, Florida

Archived on March 12, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
February 20, 2020
Notice type
Solicitation
NAICS
236210: Industrial Building Construction
Agency
National Aeronautics and Space Administration

Notice details

Office
NASA KENNEDY SPACE CENTER
Place of performance
Orlando, 32899
Last updated
Sep 25, 2026

Identifiers

Solicitation number
80KSC020R0001
Notice ID
67bfaa89ea8e4a0189d0f304f4a7acd1

Description

The Contractor shall furnish all management, supervision, labor, transportation, facilities, materials, tools, equipment, disposal, and documentation (except any property, including utilities, specified in the Schedule to be Government-Furnished) to perform all work for the Tasks named below, and defined in the contract drawings, maps, specifications, and/or statements of work. The work includes, but is not limited to, the following: 1. General renovation of the existing CCF including removal and replacement of facility roofing system, removal and replacement of an acoustic ceiling tile system, architectural modifications to existing shop and office areas, civil site work for new utilities installation, structural modifications for an expanded safe room, potable water and plumbing modifications, modifications to medium and low voltage electrical power systems, removal and replacement of lighting systems, addition of a lightning protection system, replacement of HVAC equipment and duct work throughout the facility, installation of a new fire suppression system, and removal and replacement of a fire alarm system. 2. Modifications and upgrades to the existing Liquid Helium (LHe) Transfer Area and Valve Yard including removal and relocation of gas bag trailers, removal and reinstallation of existing LHe dewars (includes temporary storage), removal of LHe transfer cryogenic process piping, removal of Gaseous He (GHe) process piping, civil and structural modifications to existing concrete pads, installation of an exterior covered walkway and canopy system over LHe pumps provided by others, procurement and installation of large LHe vaporizers, installation of new LHe cryogenic process piping, and installation of new GHe process piping to new and existing equipment/supply lines. Systems must comply with applicable ASME Code references specified. 3. Installation of a new Ground Support Pneumatics (GSPN) console including installation of control console computers and monitors in the new control room portion of the facility safe area, installation of PLCs at locations around the CCF, installation of equipment racks at locations around the CCF, installation of control and power wiring, installation of gas analyzer equipment, installation of sensing devices, connection to PLCs for the LHe pumps provided by others, and programming, GUI development, and testing of the GSPN console and all field equipment prior to implementation in production service. The existing GSPN console equipment must remain in service, connected to end item equipment, powered, air conditioned, accessible, and protected from the construction environment (i.e. dust, noise, etc.). 4. Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities. This project includes working in a fully operational facility that cannot have any significant duration of downtime without substantial coordination around launch and launch vehicle processing schedules. The CCF must remain operational with operations personnel able to perform work related to the existing GSPN console, existing GHe compressors and scavenger compressors, and existing LHe pump and vaporizer (temporary installation by others) as required to perform launch and launch vehicle processing operations at locations it supplies with GHe. Phasing of work around daily operations of the CCF is critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the CCF operational and perform the work specified. NOTE: Contract Attachment J-F, Drawings, have been split into 3 files under this announcement due to the file size limitations.

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Nov 5, 2022

NAICS

236210

Agency

National Aeronautics and Space Administration

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Anthony M. Caruvana
Fax: 321 867-1141

Secondary Contact

C. M. Julius Williams
Fax: 321 867-1141

Documents

No documents available.

Lifecycle

Solicitation:80KSC020R0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationNov 18, 2019

    Modifications to the Converter Compressor Facility for SLS Block 1B, Phase 1, John F. Kennedy Space Center, Florida

    Notice de670e7161a044c5a62199619e2dc8b9 on SAM.gov

  2. 10×
    SolicitationCurrentJan 13, 2020

    Modifications to the Converter Compressor Facility for SLS Block 1B, Phase 1, John F. Kennedy Space Center, Florida

    Notice 67bfaa89ea8e4a0189d0f304f4a7acd1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Concrete spalling repair work at Space Launch Complex (LC) LC-39B. To ensure proper access to complete the work, approximately 20 high pressure gas (HPG) battery vessels will have to be removed. After the concrete spalling repair work is completed, the HPG battery vessels will have to be reinstalled. Associated testing, commissioning, and documentation are also required. These batteries provide extra gas storage capacity at LC-39B, supporting NASA’s Space Launch System (SLS) and NASA’s mission.
-Sole Source / J&AOpen
DESCRIPTION OF ACQUISITION1. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) construction.2. The intent of the project is to construct a new Powertrain Facility (Engines Assembly) CorpusChristi Army Depot at NAS Corpus Christi, Texas to house rotary wing component rebuild activities. Primaryfacilities include an Aircraft Component Repair Shop (ACRS) (140,083 SF building) with open Flex Spaceto house rotary wing component rebuild and maintenance processes and space to house supervision, latrine,and miscellaneous support space; an Administrative Support Facility (65,840 SF building) to includeadministrative space and depot command headquarters; Central Energy Plant (10,260 SF building), specialfoundations, mass notification systems, fire protection, and alarm systems, Energy Monitoring and ControlSystem connection, Antiterrorism Measures, Post Construction Contract Award Services (PCAS), andBuilding Information Systems.Supporting facilities include utilities (electrical service, water, sewer, and natural gas), paving,walks, curbs and gutters, storm drainage, site improvements (to include relocation of playing fields andjogging track), landscaping, low impact development measures, and information systems.3. The contract completion schedule for the entire project is a total of 900 calendar days from dateof contract award. The total project magnitude is between $25,000,000 and $100,000,000.4. The Government intends to award a contract resulting from this solicitation to the responsibleOfferor whose proposal represents the best value after evaluation in accordance with the factors and theirrelative importance in the solicitation.5. This acquisition will be solicited on an unrestricted basis with full and open competition.
-Solicitation07/28/2023
P1360: Joint Maritime Facility, Newfoundland, Canada Please see Solicitation, Amendments 0001- 0005 and attachments. ***SEE SIGNED AMENDMENT 0005 SF30***.
-Solicitation05/04/2026
FX74 Strategic Airlift Hangar, Naval Station Rota, Spain. Please see Solicitation Amendment 0006 SF30, AMENDMENT 0006 PDF, Attachment M - Lorax Plan Tree List, Attachment N - NAVSTA Rota Landscaping Guidelines and AMENDMENT 0006 Specifications.
-Solicitation04/16/2026
-Special Notice11/30/2026

Additional Details

Solicitation Number

80KSC020R0001

Archive Date

Mar 12, 2020

Office Address

KENNEDY SPACE CENTER, FL, 32899