GovChime
Notice ID: 23be7aba18da4a35bbc9fd75b7dd72cbSolicitation

Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.

Archived on June 8, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
May 20, 2021
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
National Aeronautics and Space Administration

Notice details

Office
NASA KENNEDY SPACE CENTER
Place of performance
Orlando, 32899
Last updated
Sep 25, 2026

Identifiers

Solicitation number
80KSC021R0023
Notice ID
23be7aba18da4a35bbc9fd75b7dd72cb

Description

Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4. Project Control Number (PCN): 98966. INTRODUCTION The National Aeronautics and Space Administration (NASA) at the John F. Kennedy Space Center (KSC) is issuing Request for Proposal 80KSC021R0023, a construction requirement for Safety and Reliability Upgrades, KSC Institutional Power Systems, Phase 4. The North American Industry Classification System (NAICS) code for this procurement is 237130, Power and Communication Line and Related Structures Construction with a small business size standard of $39.5 million. The project period of performance is 730 calendar days. The award amount is anticipated to be between $1,000,000 and $5,000,000. This is a small business set-aside. SCOPE OF WORK Replacement of 5 (five) existing 15KV Load Break Switches (LBS-736, VFI-777, LBS-735, LBS-46 and LBS-36) located at various locations in KSC with brand new 15KV Vacuum Fault Interrupters. The replacement of existing Operations Support Building 1 (OSB1) (Building K6-1096) substations “SS-1127A/B” and “1128A/B”. Both substations, are indoor double-ended M-T-M configuration supplied by four (4) 1500 KVA pad mounted transformers. The original building substations are approximately 29 years old and are obsolete. The two (2) new substations will be customized as a M-T-M configuration and will be customized to match the dimensions of the existing layout. The new substations will share a separate control panel that will have PLC controls integrated in. Where used below, “removal” means selective demolition and potential storage of items removed, “replacement” means installation of new components/systems, and “reinstallation” means reuse of existing equipment removed in a new configuration. The work includes, but is not limited to, the following: Removal of existing electrical equipment and installation of new substation switchgears, associated transformers, Load Break Switches (LBS), and Vacuum Fault Interrupters (VFI) including installation of PLCs at locations in the new substations, installation of equipment racks at locations in the substations, installation of control and power wiring, installation of sensing devices, connection to PLCs for the circuit, and LBSs, and VFIs Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled are known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities. This project includes working in a fully operational facility that cannot have any significant duration of downtime due to launch and launch vehicle processing schedules. The facilities and buildings must remain operational. Phasing of work around daily operations of the OSB1 and other facilities is critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the OSB-1 and other facilities operational and perform the work specified. NOTE: The Specifications and Drawings for this project have an Export Determination of EAR 99 – EAR Controlled – ITAR Controlled - and are considered controlled documents. Therefore, download of documents won’t be permitted until requesters have been cleared through the Defense Logistics Agency (DLA).

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Sep 30, 2018

NAICS

237130

Agency

National Aeronautics and Space Administration

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Anthony M. Caruvana
Fax: 3218671141

Secondary Contact

C. M. Julius Williams
Fax: 3218671141

Documents

No documents available.

Lifecycle

Solicitation:80KSC021R0023
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 10, 2021

    Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.

    Notice 1f8906e5a24e451594067c6c28090255 on SAM.gov

  2. 7×
    SolicitationCurrentApr 22, 2021

    Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.

    Notice 23be7aba18da4a35bbc9fd75b7dd72cb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
***AMENDMENT 0006: The purpose of this amendment is to remove Greenland from the geographic scope and place of performance of the Power Construction and Services II MATOC. Attachment 2 is revised to remove the Greenland labor coefficient, and Attachment 7 is revised accordingly. The proposal due date remains unchanged. To view the amendment and revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below.******AMENDMENT 0005: The purpose of this amendment is to incorporate DFARS provision 252.225-7966 and DFARS clause 252.225-7967 into the solicitation and revise the proposal due date from 03 November 2026 at 4:30 P.M. EDT to 03 November 2026 at 4:30 P.M. EST due to daylight savings. To view the amendment access the PIEE Solicitation Module Link for W912BU26RA032 below.******AMENDMENT 0004: The purpose of this amendment is to: (1) Respond to contractor RFIs. (2) Update solicitation attachments. (3) Add FAR 52.222-56, Certification Regarding Trafficking in Persons Compliance Plan (Deviation 2026-O0038). (4) Incorporate disclosures in accordance with Department of Army policy on the Use of Artificial Intelligence in Source Selection and Acquisition Evaluations. (5) Extend the proposal due date to 03 November 2026 at 4:30 P.M. ET. To view the amendment and all revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below******AMENDMENT 0003: The purpose of this amendment is to extend the proposal submission due date to 27 October 2026 4:30 PM ET and provide an update on Requests for Information (RFIs). To view the amendment access the PIEE Solicitation Module Link for W912BU26RA032 below******AMENDMENT 0002: The purpose of this amendment is to provide the Governments consolidated responses to contractor Requests for Information (RFIs), and to distribute the presentation slides and attendee list from the Industry Day held on September 17, 2026. Additionally, Attachment 2 - PCS II MATOC Bid Schedule is revised under the EUCOM Labor Coefficients tab to replace Denmark with Kosovo, as Denmark was previously included in error. To view the amendment and revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below******AMENDMENT 0001: The purpose of this amendment is to incorporate Attachment 10 - 00 74 00 Supplemental Conditions to establish Host Nation compliance requirements for individual orders performed within Turkey, Romania, and Poland. Attachment 7 and Attachment 8 are revised accordingly. Additionally, this amendment corrects various administrative errors and inconsistencies throughout the solicitation. To view the amendment and revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below*** The US Army Corps of Engineers, Philadelphia District (NAP) has issued a Request for Proposal (RFP) for one firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) contract to provide power construction and services in contingency or austere environments in support of temporary or enduring requirements of the United States Government (USG); USG Coalition Forces/Organizations; and Host-Nation Governments/Forces/Organizations within the United States Central Command Area of Responsibility (CENTCOM AOR) and select United States European Command (EUCOM) countries to include Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. A target of three (3) to seven (7) contracts will be awarded to a pool of contractors that will subsequently compete for individual task orders. This Power Construction and Services II Multiple-Award Task Order Contract (PCS II MATOC) will have total shared contract capacity of $249,000,000.00. A virtual industry day will be hosted by the USACE Philadelphia District on 17 September 2026 at 1000 hrs ET. In order to receive a meeting invitation link, offerors must submit a request in writing to the Points of Contact (POC) listed under Requests for Information (RFI) found in Attachment 8 - 00 22 16 PCS II MATOC Proposal Submission and Evaluation Factors AMD 0001 no later than 24 hours prior to the industry day, 16 September 2026 at 1000 hrs ET. Please access the below PIEE Solicitation Module Link for W912BU26RA032 for the solicitation and all attachments.
62%
Solicitation11/03/2026
This is a Pre-solicitation Notice (Synopsis) and is for informational purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. The US Army Corps of Engineers, Philadelphia District (NAP) intends to issue a Request for Proposal (RFP) for one firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) contract to provide power construction and services in contingency or austere environments in support of temporary or enduring requirements of the United States Government (USG); USG Coalition Forces/Organizations; and Host-Nation Governments/Forces/Organizations within the United States Central Command Area of Responsibility (CENTCOM AOR) and select United States European Command (EUCOM) countries to include Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. A target of three (3) to seven (7) contracts will be awarded to a pool of contractors that will subsequently compete for individual task orders. This Power Construction and Services II Multiple-Award Task Order Contract (PCS II MATOC) will have total shared contract capacity of $249,000,000.00. Please access the below PIEE Solicitation Module Link for W912BU26RA032 for more information.
62%
Pre-Solicitation09/08/2026
ACTION: Pre-Solicitation Notice PRE-SOLICITATION NUMBER: 140P2024R0130 CLASSIFICATION CODE: Y1NZ - Construction of other utilities. CONTRACTING OFFICER: Tim Burger CONTRACT SPECIALIST: Brian Baugh DSC-CS Contracting Services Division National Park Service P.O. Box 25287 Denver, CO 80225 POINT OF CONTACT: CONTRACTING OFFICER: tim_burger@nps.gov CONTRACT SPECIALIST: brian_baugh@contractor.nps.gov PLACE OF PERFORMANCE: Voyageurs National Park, Minnesota. PLACE OF PERFORMANCE COUNTRY: USA Title of Project: Replace Power Distribution line. GENERAL: The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a full and open basis from all interested businesses having the capability to perform the work described below. The solicitation will be issued electronically on the Federal Business Opportunities website at www.fedbizopps.gov . Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format; and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available. Vendors can search for opportunities and award history on www.fbo.gov without registering. The Federal Business Opportunities (www.fbo.gov) website has an Interested Vendors List and a Watchlist where you can add your company¿s interest. Registering provides the opportunity to receive notifications; this is a tool of convenience only and does not serve as a guarantee of notification. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents. Prospective offerors desiring to conduct business with the DOI are required to have an active registration in the Systems for Awards Management (SAM) at www.sam.gov. You are also required to have a DUNS number in order to conduct business with the Federal Government. This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below. Proposed Solicitation Issue Date: Estimated on/about September 3, 2024 This is currently an unfunded requirement with a high expectation that funds will be available. When and if funds become available a contract will be awarded at that time. The NAICS Code for this requirement is 237130 with a size standard of $45 million. Description: This project will replace the main underwater high voltage cable and multiple transformer boxes that run from the mainland to the Kettle Falls district. Pad-mounted switchgear, sectionalizing enclosures, elbow terminations, as well as individual and other associated components will be replaced as needed. An improved level of emergency backup generation for critical loads at Kettle Falls Area will be installed. Due to the compromised neutral wire, this poses a serious safety risk to visitors as well as employees. The neutral serves as a ground for the cable, and as more lightning strikes occur the chances of someone being struck increase. Secondly when power goes out facilities are forced to be closed such as restrooms, showers, and the restaurant. There is also a food safety factor at the restaurant due to the freezers and coolers loss of power. This has potential for food to develop bacteria that could lead to sickness of visitors. The Fire suppression system pumps are run by electricity; therefore, if there is no power then there is no fire protection for the Historic hotel. This jeopardizes the visitor's safety as well as the historic building. The new backup generator would allow the concession to continue to stay operational in the event of a power outage. Estimated Price Range: Over $10,000,000 Estimated Period of Performance: 730 calendar days Proposal receipt date is not known at this time. The actual date will be established in the solicitation documents A pre-proposal meeting may be posted and date/location will be noted in the solicitation or a forthcoming amendment. This procurement will be competed via full and open. All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov .
62%
Pre-Solicitation10/03/2024
Amendment 8- Extend proposal due date to 03/05/2027- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project
60%
Solicitation03/05/2027
5 AUGUST 2026 UPDATE TO AMENDMENT 0007: Please note bid inquiries through 8 July 2026 have been posted to PIEE Solicitation (link below) due to known accessibility issues. $1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
58%
Solicitation09/03/2026

Additional Details

Solicitation Number

80KSC021R0023

Archive Date

Jun 8, 2021

Office Address

KENNEDY SPACE CENTER, FL, 32899