Notice ID: 320412ec35704255aceddc907e52fd5dSolicitation
Replace Overhead Power Line B - Phase 2 at Kennedy Space Center
Archived on August 6, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- June 20, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- National Aeronautics and Space Administration
Notice details
- Office
- NASA KENNEDY SPACE CENTER
- Place of performance
- 32899
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 80KSC024R0017
- Notice ID
- 320412ec35704255aceddc907e52fd5d
Description
This is Phase 2, Request for Proposal, of a Two-Phase Design/Build project to Replace Overhead Power Line B along Static Road at Kennedy Space Center, Florida. **For refernece purposes, Phase 1 of the project is solicitation number 80KSC024R0003.** Note: Only the Down Selected Firms are allowed to submit a proposal to this Phase 2 Request for Proposal announcement.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Dec 18, 2026
NAICS
237130
Agency
National Aeronautics and Space Administration
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
80KSC024R0017- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- SolicitationCurrentJun 20, 2024
Replace Overhead Power Line B - Phase 2 at Kennedy Space Center
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
COMBINED SYNOPSIS / SOLICITATION NOTICE Commercial Products and Commercial Services / Simplified Acquisition Procedures (In accordance with FAR Subpart 12.6 and FAR Part 13 / FAR Subpart 36.2 as applicable) GENERAL INFORMATION • Action Code: Combined Synopsis/Solicitation • Document Type: Combined Synopsis/Solicitation Notice • Solicitation Number: 30321PR270000001 • Notice Date: 10/29/2026 • Set-Aside Status: Total Small Business Set-Aside • Primary NAICS Code: 237120 – Oil and Gas Pipeline and Related Structures Construction • Small Business Size Standard: $45.0 Million (for NAICS 237120) • Product Service Code (PSC): Z2PZ – Repair or Alteration of Other Utilities POINTS OF CONTACT Contracting Officer’s Representative: MKC Zachery Little Email: Zachery.T.Little@uscg.mil Phone: (417) 612-3258 SECTION 1: SYNOPSIS & DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. The Department of Homeland Security, United States Coast Guard (USCG), has a requirement for repair, remediation, testing, and coating of fuel lines, storage tanks, and associated fuel system infrastructure located at USCG Station Sand Key, Clearwater, Florida. The Government intends to award a single, Firm-Fixed-Price (FFP) contract resulting from this request for quotation (RFQ). SECTION 2: PLACE OF PERFORMANCE & OPERATIONAL HOURS • Location: United States Coast Guard Station Sand Key 1375 Gulf Boulevard Clearwater, FL 33767 • Operating Hours: Normal base operating hours are 0700 to 1700 (7:00 AM – 5:00 PM), Monday through Friday, excluding federal holidays. Any work required outside these hours must receive prior written coordination and approval from the Contracting Officer’s Representative (COR). • Continuity of Operations: Station Sand Key is an active, operational military facility. The contractor shall coordinate all operations with the unit to ensure the station does not lose the capability to fuel operational vessels during the execution of repairs. SECTION 3: SUMMARY SCOPE OF WORK (SOW) DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD STATION SAND KEY SPECIFICATIONS FOR Repair Fuel Lines & Tank General: United States Coast Guard Station Sand Key requesting repair work to be completed on various fuel lines and fuel related systems. Location: United States Coast Guard Station Sand Key. 1375 Gulf Boulevard Clearwater, FL 33767 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 0700 to 1700 Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC Zachery Little Zachery.T.Little@uscg.mil 417-612-3258 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in Station dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor. VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense. VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification. IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government. X: Regulations while onboard Coast Guard Station Sand Key: 1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flag pole & maintain silence and all vehicles & equipment will halt during these brief events. 2. The construction site shall be maintained in a clean condition at all times. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate. 3. There is one smoking area on base, SE corner next to dumpsters. 4. Traffic Regulations: a) 15 mph speed limit b) No use of cell phones is permitted while driving vehicles or operating heavy machinery c) All personnel shall obey all marked traffic signals including stop signs & stop lights. 5. Absolutely no firearms or weapons of any kind are allowed onboard Station Sand Key 6. Only American citizens and permanent resident aliens are allowed onboard Station Sand Key. Absolutely no foreign nationals are permitted on the premises. 7. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, and sewage or lighting outages. 8. The contractor shall provide a consolidated list of all contracted personnel, including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on Station Sand Key Facilities either the day of or prior to the notice to proceed date. 9. Contractors are welcome to utilize the restrooms on the 1st decks of the building. Providing they are clean and do not track mud, dirt or any other debris into the restrooms. 10. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work. 11. No personnel other than the contracting officer have the authority to alter the terms of any contract or to issue any change orders. 12. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors is subject to orders to evacuate the property at any time. VIII: SCOPE OF WORK: Contractor shall provide all labor, materials, and equipment necessary to complete the following noted below: 1. All work in this contract shall be completed in USCG STA Sand Key 1375 Gulf Blvd Clearwater, FL 33767 2. Both SCU’s (spill containment unit) have corrosion on the outside of the SCU’S. Treat/remove corrosion on DSL (Diesel) and RUL (Regular Unleaded) spill containment units. 3. Label and calibrate DSL and RUL clock gauge so that a high level 90% warning alarm will sound if tank is filled past capacity. Additionally, provide testing once repairs are made and submit to unit for record keeping. 4. Treat/remove corrosion both DSL and RUL tanks and all associated piping, apply environmentally safe paint to the entirety of both tanks and associated piping additionally attach appropriate markings on both tanks IAW local, state, and county regulations (capacity, description, ect.) 5. Investigate and make repairs to both DSL and RUL dispensers to correct flow rate. 6. Investigate and make repairs to both DSL and RUL UDC’s (under dispenser containment) complete integrity test once repairs are made and submit to unit for records keeping. 7. Complete integrity test for 03 transition sumps, make any necessary repairs and provide testing records to unit after any repairs are made for records keeping. 8. Investigate and make repairs to or replace leak detection panel and sensors, to ensure system operates correctly, additionally label monitoring panel for each leak detector location. 9. Conduct Line leak detection on all fuel lines, and make any repairs that are needed, provide test results to unit for records keeping. 10. Replace non-compliant section of copper fuel piping and components that supply emergency generator tank. 11. Contractor will work with unit to ensure the units does not lose the ability to fuel vessels while repairs are taking place. 12. Contractor will test run system after all repairs are made to ensure system operation. 13. Contractor shall provide dumpster AS NEEDED and shall be responsible for all cleanup of the project area. 14. Contractor shall be responsible for the removal of the dumpster once the project is complete. 15. Contractor shall protect all equipment and merchandise in work locations. 16. All work must be approved by the Contracting Officer’s Representative SECTION 4: SITE-SPECIFIC REGULATIONS & SECURITY REQUIREMENTS 1. Security & Personnel Screening: a. Only U.S. citizens and lawful permanent resident aliens are permitted on the installation. Foreign nationals are strictly prohibited. b. The contractor must submit a roster of all personnel (including subcontractors) containing full legal names and driver’s license numbers (or valid government ID) prior to or on the Notice to Proceed (NTP) date. c. All personnel, vehicles, equipment, and packages are subject to search at any time by Coast Guard security. 2. Military Customs & Flag Etiquette: a. Morning Colors (0800) and Evening Colors (Sunset): All personnel on base must halt vehicles/equipment, face the national ensign/flagpole, and observe silence during the playing of the National Anthem or bugle calls. 3. Traffic & Safety Rules: a. Installation speed limit is 15 MPH. b. Cellular phone use while driving or operating equipment on base is prohibited. c. Smoking is restricted to the designated smoking area (southeast corner near dumpsters). d. Firearms and weapons are strictly forbidden. 4. Safety & Environmental Compliance: a. Contractor shall comply with OSHA Construction Standards (29 CFR Part 1926). b. A written Site Safety Plan must be submitted prior to commencement of work per FAR 52.236-13, naming the designated site safety supervisor. c. Notify the COR immediately of any lost-time accidents, followed by copies of accident reports by 1200 the following business day. 5. Utility Verification & Weather Contingencies: a. The contractor is responsible for locating and protecting all existing underground and aboveground utilities prior to disturbing surfaces. b. In the event of tropical storm/gale force wind warnings, the contractor must immediately secure all scaffolding, equipment, loose materials, and containers. SECTION 5: SITE VISIT • Pre-Proposal Site Visit: o An organized site visit is scheduled for: NOV 04, 2026 at 10am EST. o Location: USCG Station Sand Key, 1375 Gulf Blvd, Clearwater, FL 33767. SECTION 6: EVALUATION CRITERIA (FAR 52.212-2) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made based on: • Evaluation Basis: Best Value Tradeoff o Technical Capability: Compliance with all SOW requirements and demonstrated ability to maintain fuel availability. o Past Performance: Record of satisfactory past performance on similar commercial or government fuel infrastructure projects. o Price: Price reasonableness. SECTION 7: APPLICABLE CLAUSES & PROVISIONS The following Federal Acquisition Regulation (FAR) and Homeland Security Acquisition Regulation (HSAR) provisions and clauses apply: • FAR 52.204-7, System for Award Management • FAR 52.204-13, System for Award Management Maintenance • FAR 52.204-24 / 25 / 26, Representation Regarding Certain Telecommunications • FAR 52.212-1, Instructions to Offerors – Commercial Products and Commercial Services • FAR 52.212-2, Evaluation – Commercial Products and Commercial Services • FAR 52.212-3, Offeror Representations and Certifications – Commercial Products and Commercial Services • FAR 52.212-4, Contract Terms and Conditions – Commercial Products and Commercial Services • FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Products and Commercial Services • FAR 52.236-12, Cleaning Up • FAR 52.236-13, Accident Prevention • HSAR clauses as applicable to DHS acquisitions. | - | Combined Synopsis | 11/13/2026 |
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR part 12 in conjunction with FAR Part 36. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 15BBNF26Q40900001 is issued as a request for quotation (RFQ), for: The Federal Bureau of Prisons, FCI Marion, intends to issue a solicitation for the following requirement: The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Marion located at 4500 Prison Road Marion, IL 62959 intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to repair damage to the 3-phase overhead primary distribution line and two (2) transformers. See the Statement of Work attachment included with the solicitation posting for the complete requirements of the work. The performance period for the project will be 90 Calendar Days from issuance of the notice to proceed. The NAICS code for this requirement is 237130 (Power and Communication Line and Related Structures Construction) with a corresponding small business size standard of $45 million. The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions. The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access. If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above. Each offeror's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information. This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business for the applicable NAICS code (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration). Quotation Deadline: The anticipated closing date for receipt of quotations is December 03, 2026, at 12:00 pm Eastern Time. Payment Terms: Payment will be processed via Electronic Funds Transfer (EFT) in accordance with 52.232-33 Payment by Electronic Funds Transfer- System for Award Management Additional Requirements: Offerors must include a specification sheet and any submittal information about the products offered in their quotation. Faxed and hand-delivered quotes will not be accepted. Site Visit: A site visit will be held at FCI Marion to allow interested vendors the opportunity to examine existing conditions and the work area. Attendance is encouraged but not mandatory. Vendors wishing to attend must submit NCIC background check forms for all proposed attendees by the deadline stated in the solicitation. Only individuals who have received prior approval will be permitted to enter the facility. Specific instructions regarding the date, time, meeting location, required identification, and security procedures will be provided in the solicitation. Questions will not be answered during the site visit; all questions must be submitted in writing to the Contracting Officer in accordance with the solicitation instructions. Solicitation Post Date: estimated Monday, October 5, 2026. NCIC forms due: Friday, October 23, 2026 by 12 pm Central Site Visit: Wednesday, October 28, 2026 at 9 am Central Questions Due: Monday, November 02, 2026 by 12pm EST Offer Due Date: Thursday, December 03, 2026 at 12:00pm EST Any questions regarding the solicitation may be submitted in writing via email to csmart@bop.gov. | - | Combined Synopsis | 12/03/2026 |
| - | Awarded | Open | |
Amendment 0004 and RFI Set #4 Posted July 27, 2026***************************Amendment 0003 and RFI Set #3 has been uploaded on July 17, 2026*****************************************************************************The purpose of Amendment 2 is to extend the proposal due date to July 31, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of Amendment 0002. Responses to RFI - Set #2 has been posted. ***********************************The purpose of Amendment 0001 is to extend the proposal due date to July 13, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of the attached amendment. Due to the number of RFIs received, the USACE is still preparing responses and responses will be posted as soon as they are available. A select number of RFIs have been posted with this Amendment. ***************************************************************************************************************************************************************************************************This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE. SEE FAR CLAUSE 52.232-18 AVAILABILITY OF FUNDS. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. All proposals will be due on June 29, 2026, at 12:00PM PDT. The specific date and time is identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | - | Solicitation | 07/31/2026 |
This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. The solicitation will be available on/about April 15, 2026, for viewing/downloading. All proposals will be due on/about May 15, 2026, at 12:00PM PDT. The specific date and time will be identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | - | Pre-Solicitation | Open |
Additional Details
Solicitation Number
80KSC024R0017
Archive Date
Aug 6, 2024
Office Address
KENNEDY SPACE CENTER, FL, 32899