JOFOC Multiple Award Construction Contract II (MACC-II) Extension
Awarded on October 20, 2025. Justification posted by NATIONAL AERONAUTICS AND SPACE ADMINISTRATION on October 23, 2025. Solicitation 80SSC025K0002.
NAICS 236210 (Industrial Building Construction). Place of performance: Stennis Space Center, Mississippi. Full description on SAM.gov.
Description
The Multiple Award Construction Contract Two (MACC-II), North American Industry Classification System (NAICS) 236210, provides a critical in-place contractual mechanism through a regionalized Multiple Award, Indefinite Delivery, Indefinite Quantity (IDIQ) Contract to support general construction, alteration, modification, maintenance and repair, demolition, design-build, Leadership in Energy and Environmental Design (LEED), Building Information Modelling (BIM), and new construction of buildings, facilities, and real property at John C. Stennis Space Center (SSC), Johnson Space Center (JSC) including White Sands Test Facility (WSTF), Kennedy Space Center (KSC), and Marshall Space Flight Center (MSFC) including Michoud Assembly Facility (MAF). MACC-II will also support emergency response to natural disasters and emergencies.
NASA/NSSC intends to issue a modification to extend the ordering period for the current MACC-II contracts (80SSC018D0001 through 80SSC018D0024) for one year with two, six-month option periods under the authority of FAR 6.103. The current MACC-II contract period of performance is from October 24, 2017, to October 23, 2025. The maximum value of all task order awards will remain at $3B. No other changes are anticipated. The extension will enable NASA sufficient time to align MACC-III requirements in accordance with the Administration’s objectives and budgetary requirements. The MACC-II extension is necessary to provide coverage of important MACC-II support, which will be crucial to carryout various infrastructure and improvement projects across the NASA Centers identified in PL 119-21, while the MACC-III requirements are identified, and the procurement is realigned with the Administration’s objectives.
A list of the MACC-II contracts to be extended if extension criteria are met are as follows:
80SSC018D0001 E.L.C.I. Construction Group, Inc. Woman Owned Small Business, HUBZone, 8(a)
80SSC018D0002 Baker Klein-Foresight JV, LLC Woman Owned Small Business, 8(a)
80SSC018D0003 Odyssey International Woman Owned Small Business
80SSC018D0004 Diversified Construction of Oklahoma, Inc. Woman Owned Small Business
80SSC018D0005 Healtheon, Inc. HUBZone
80SSC018D0006 Weldin Construction, LLC HUBZone
80SSC018D0007 Pontchartrain Partners, LLC HUBZone, Service Disabled Veteran Owned Small Business, 8(a)
80SSC018D0008 Civil Works Contracting HUBZone
80SSC018D0009 ESA South, Inc. Service Disabled Veteran Owned Small Business
80SSC018D0010 Advon Corporation Service Disabled Veteran Owned Small Business
80SSC018D0011 Birmingham Industrial Construction Service Disabled Veteran Owned Small Business, 8(a)
80SSC018D0012 Firewatch Contracting of FL, LLC Service Disabled Veteran Owned Small Business
80SSC018D0013 Silver Mountain Construction, LLC 8(a)
80SSC018D0014 Drace Construction Corp. 8(a)
80SSC018D0015 Orocon Construction, LLC 8(a)
80SSC018D0016 CCI Energy and Construction Services, LLC 8(a)
80SSC018D0017 A&H-Ambica JV, LLC Small Business
80SSC018D0018 MOWA Barlovento JV-2 Small Business
80SSC018D0019 Southeast Cherokee Construction, Inc. Woman Owned Small Business
80SSC018D0020 SES Construction and Fuel Services, LLC Small Business
80SSC018D0021 Brasfield & Gorrie Full and Open
80SSC018D0022 B.L. Herbert International, LLC Full and Open
80SSC018D0023 Caddell Construction Co. (DE), LLC Full and Open
80SSC018D0024 W.G. Yates & Sons Construction Company Full and Open
Fulfilling these requirements under separate contracts, rather than via the extension provided for herein, the result would lead to substantial duplication of costs to the Government which competition could not mitigate. Specifically, those costs include work performed by the requirements development teams (RDT) and source evaluation boards, phase-in/transition from one contractor to another, and contract administration costs associated with restructuring contracts awarded under the existing Federal acquisition regulatory system to align with the new regulatory system. The current vehicles are already in place where the incumbent contractors have the infrastructure, knowledge and bonding capacity to continue the current anticipated future work without delays. The contractors are positioned to provide any anticipated construction needs amongst the Centers while the Agency stabilizes its budget and planning for future competitions.
In anticipation of the expiration of MACC-II contract on October 23, 2025, NASA began planning to compete the follow-on MACC-III contract on September 11, 2024, when the NSSC procurement office issued an appointment letter for the RDT. The goal was to award the follow on, MACC-III, prior to the expiration of MACC-II. On June 5, 2025, the RDT was disbanded for a period of approximately 9-12 months in light of budgetary concerns, the loss of key procurement and technical staff resulting from the Deferred Resignation Program (DRP 1.0), and to ascertain the potential scope of work the MACC-III contract in the event any part of the MACC-III work scope is determined to be performed by a separate Federal Agency pursuant to Executive Order 14240, Eliminating Waste and Saving Taxpayer Dollars by Consolidating Procurement.
Interested organizations may submit their capabilities and qualifications to perform the effort electronically via email to Sheldon Murphy, Sheldon.l.murphy@nasa.gov and Adrianne Ragan, Adrianne.peyton.ragan@nasa.gov no later than 12:00 PM Central Time (CT) on Monday, September 29, 2025.
NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf.
Overview
Award Overview
Award Number
80SSC018D0001-80SSC018D0024
Award Amount (SAM.gov award notice)
Not specified
Award Date
Oct 20, 2025
Awardee
Not specified
Original Solicitation
Notice ID: 7f7032a1994f47a9ac8a127b84f3db31
Posted Date: Oct 23, 2025
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
80SSC025K0002- Awarded
This opportunity has been awarded.
- Special NoticeSep 12, 2025
Multiple Award Construction Contract II (MACC-II) Extension
- Sole Source / J&ACurrentOct 23, 2025
JOFOC Multiple Award Construction Contract II (MACC-II) Extension
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
This action will procure design-build construction services necessary to execute the next phase of modifications at the Converter Compressor Facility (K7‑0468), including the integration of the planned helium recovery system for Phase 3. These design-build construction modifications support NASA mission operations that rely on continuous supply of essential commodities provided by the facility, which also supports commercial partners such as SpaceX, Blue Origin, and ULA. | Sole Source / J&A | 236210 | No Set-Aside | 10/06/2026 | Open | Orlando, FL | |
Task Order Modification to Install systems furniture for the first and second floors of the Booster Fabrication Facility. | Sole Source / J&A | 236210 | No Set-Aside | 10/06/2026 | Open | Orlando, FL | |
Modification to existing Contract. Excavation of existing soil to produce a pit 45' wide x 90' long x 4' deep, not including sloped side walls inside the IPEx relocatable building M7-1062. Includes install of liner with landfill-grade impervious 60 Mil HDPE Text Liner system; Backfill with W12 granite screenings at 2% moisture content or less; and cover remaining top surface (60' wide x 110' long) with at least 18” of W12 granite screenings at 2% moisture content or less. | Sole Source / J&A | 236210 | No Set-Aside | 10/06/2026 | Open | Orlando, FL | |
The general purpose of the contracts is to obtain craft labor and corrosion control services here at Kennedy Space Center. Craft labor and corrosion control includes, but is not limited to, all tasks and resources necessary to install, field fabricate and modify ground support equipment systems/subsystems to execute repairs and configuration change activities in support of Spaceport customer project. Met-Con has historically provided this service, as a subcontractor, most recently to Amentum under the Consolidated Operations, Management, Engineering and Test (COMET) contract, providing personnel who have specialized experience at KSC for over 20 years. They possess a knowledge that is critical to the execution of the Artemis mission that no other company can provide to a schedule that supports mission success. KSC's craft labor and corrosion control operations are reactive, requiring rapid adaptation as maintenance needs emerge during performance. Onboarding a new contractor would introduce schedule delays due to the learning curve and unfamiliarity with KSC-specific requirements. Met-Con is already established and integrated with the Kennedy Space Center team, making them the optimal choice for continuity. A one year, sole-source, award to Met-Con will maintain operational momentum while freeing Government resources to develop a competitive, long-term solution in support of the Administrator's direction. This requirement is critical to NASA’s Artemis campaign and its overall mission to safely land humans on the lunar surface. The Artemis campaign’s timeline, and its included mission dates, are a vital component of the government’s need. For reasons discussed below, delays to mission execution as a result of developmental challenges are likely to result in mission failure. These contracts are necessary to ensure that development of a lunar landing capability is complete in time to support NASA’s Artemis missions. | Sole Source / J&A | 236210 | No Set-Aside | 09/29/2026 | Open | Orlando, FL | |
This is a Sources Sought notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to obtain information regarding the availability and capability of qualified small business sources; other than small businesses should not respond to this notice. Your responses to the information requested will assist the Government in determining the appropriate acquisition method, including whether a set-aside is possible. The NAICS code for this Sources Sought Notice is: 236210 - Industrial Building Construction (SBA Size Standard: $45 million). | Solicitation | 236210 | No Set-Aside | 09/23/2026 | 10/29/2026 | - |
Additional Details
Solicitation Number
80SSC025K0002
Archive Date
Nov 22, 2025
Office Address
STENNIS SPACE CENTER, MS, 39529