Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
Archived on August 30, 2026. Original response deadline: . Full description on SAM.gov.
Description
Amendment 2 Change the Solicitation Closeout Date from 07/22/2026 to 07/27/2026.
Amendment 1 Change of Period of Performance from 08/28/2026 through 04/30/2027 to 08/15/2026 through 10/15/2026. See Amednment Attachment.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR
Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate
written solicitation will not be issued.
Solicitation number 1240LU26Q0068 is issued as a Request for Quotation (RFQ) for Seed Orchard
Disconnect and Electrical Life Safety Rehab. This project is to relocate the overhead power to underground
power, install a new electrical disconnect, and replace pump controls at the Salmon River Seed Orchard Pump
Station. The project will correct several electrical deficiencies at the Salmon River Seed Orchard Pump
Station, that have resulted in hazardous conditions and equipment failures. The project would include
removing existing overhead power, weather head, and pole and replacing it with new underground service to
new Type 4, 400A, 480V, 3 phased disconnect switch and post. Removing existing electrical backboard and
replacing with new pumpstation mounting assembly suitable for three NEMA Type4 Motor Control Centers.
This acquisition is set-aside for small business concerns. The applicable North American Industry
Classification Standard Code is 237130 Power and Communication Line and Related Structures Construction
The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside.
All responsible sources may submit a quotation which will be considered by the agency.
Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract
price if value in excess of $150,000, due 10 days after award. Only payment protections are required
for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment
bond allowed per FAR 52.228-13, due within 10 days of contract award.
Provide quote by: No later than 22 July 2026 by 12:00 P.M. (Mountain Time).
DOCUMENTS TO RETURN:
The following documents shall be submitted by the quoter for evaluation to be considered responsive:
• 1- Combined Synopsis Solicitation Commercial Construction (SF 1442 Page 2 filled out).
• Schedule of Items
• Attachment 7 - Experience Questionnaire
• Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable.
Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9
Attn: Daniel Franco
E-mail: Daniel.franco@usda.gov
Organized Site Visit
Site visit will be performed on 07/07/2026 at 11:00 AM MST. Per FAR Part 52.236-3 “Site Investigation
and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. Ensure you are
familiar with inclement weather as this may hinder access to certain roads.
For solicitation questions email daniel.franco@usda.gov. Questions are due no later than 13
July 2026 by 12:00 P.M. (Mountain Time). This will ensure enough time to respond before the
solicitation period ends. Please include the solicitation name and number (Seed Orchard Disconnect and
Electrical Life Safety Rehab, 1240LU26Q0068) as the subject line of the email.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Files (15)
- Download
Attachment 9 - Questions and Answers 2.pdf
51 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
1- 1240LU26Q0068 Amendment 2.pdf
83 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Site Visit Attendance Sheet.docx
15 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
1- 1240LU26Q0068 Amendment 1.pdf
87 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
1- Combined Synopsis Solicitation Commercial Construction.pdf
1.6 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Appendix 1 Map.pdf
316 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Appendix 2 Photos.pdf
5.0 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 1 - Schedule of Items.pdf
180 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 2 - Statement of Work.pdf
184 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 3- Electrical Drawings.pdf
3.5 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 4 - Specifications.pdf
463 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 5- SRSO Submittal Checklist.pdf
68 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 6- WD ID20260024 05182026.pdf
40 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 8 - Questions and Answers after Site Visit.docx
24 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 7 - Experience Questionnaire.docx
38 KBAdded in Combined Synopsis/Solicitation version 2Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
- 2Version 2Combined Synopsis/SolicitationArchived
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
- 3Version 3Combined Synopsis/SolicitationArchived
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
- 4Version 4Combined Synopsis/SolicitationArchived
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
- 7Version 7Combined Synopsis/SolicitationArchivedCurrent
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
- 6Version 6Award Notice
Type changed from Combined Synopsis/Solicitation to Award Notice
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
1240LU26Q0068
Archive Date
Aug 30, 2026
Office Address
Ogden, UT, 844012310