Safety Shower and Eyewash Corrections Phase 1
Archived on August 21, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM MDT
- Posted
- July 22, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of CommerceNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
Notice details
- Office
- DEPT OF COMMERCE NIST
- Place of performance
- Boulder, Colorado, 80305
- PSC
- Z1JZ: MAINTENANCE OF MISCELLANEOUS BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1333ND26RNB190015
- Notice ID
- 860021384fd14caca55631ad6ec4dad3
Description
July 22, 2026 - Published AMD0004, schedule a second site visit
July 21, 2026 - Published AMD0003, incorporated extended due date due to typographical problem in AMD0002 text.
July 15, 2026 - Published amd0002, incorporated extended due date, rfi due date, and revised sow
June 12, 2026 - added attachment for site visit attendance
REFER TO ATTACHMENTS FOR DETAILED INFORMATION REGARDING SOLICITATION: 1. 1333ND26RNB190015 Eyewash Phase 1 NIST Boulder CO.pdf, and 2. OFPM Site Standards.zip
Background Information
The Department of Commerce (DOC) campus is a research and development complex located at 325 Broadway in Boulder, Colorado. The National Institute of Standards and Technology (NIST) is the primary occupant, National Oceanic Atmospheric Administration (NOAA) and National Telecommunications and Information Administration (NTIA) also have a presence on campus. NIST’s Office of Facilities and Property Management (OFPM) is responsible for maintaining and renovation of spaces which consist of laboratories, office space and facilities maintenance areas throughout the campus.
Annual testing of safety showers and eyewashes across campus have shown a significant number of fixtures failing to meet the ANSI Z358.1-2014 (Emergency Eyewash & Shower Standard), mostly shower/eyewash combination fixtures that fail during simultaneous operation. OFPM conducted a study which identified deficient fixtures, determined the cause of failure, and recommended necessary actions to bring the fixtures into compliance.
Purpose
Many of the deficiencies identified have been remedied by NIST OFPM employees completing the recommended corrective actions. However, the scope in some buildings/areas is large enough to warrant contracted construction: Building 22 (B22), Building 25 (B25), Building 42 (B42/Central Utility Plant – CUP), Building 1 (B1), and Building 2 (B2) all have emergency fixtures needing attention. The intent of this project is to remedy the remaining deficiencies such that all emergency fixtures are compliant with ANSI Z358.1-2014. This Design-Build project is structured with B22 as the base scope and four option CLINs for the other abovementioned areas. Recommendations presented in this SOW and supporting documents are intended to be an optional starting point. Additional design and coordination will be necessary to proceed with any of the recommendations. It is the responsibility of the contractor to evaluate and confirm the viability of the recommendations, provide an engineered design, and execute the construction to successfully bring all fixtures within project scope into compliance.
PLACE OF PERFORMANCE: NIST Boulder Campus, Boulder, CO
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (8)
- Download
1333ND26RNB190015 AMD0004 Second Site Visit.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 9Posted - Download
1333ND26RNB190015 AMD0003 Correct Proposal Due Date.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 7Posted - Download
1333ND26RNB190015 AMD0002 Revise SOW.pdf
1.4 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
1333ND26RNB190015 AMD0001 RFI Responses.pdf
1.2 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Attachment 02.zip
211 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Site Visit Sign-In.pdf
201 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
OFPM Site Standards.zip
3.2 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
1333ND26RNB190015 Eyewash Phase 1 NIST Boulder CO.pdf
7.0 MBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 2Version 2Sources SoughtArchived
Safety Shower and Eyewash Corrections Phase 1
- 3Version 3Combined Synopsis/SolicitationArchived
Type changed from Sources Sought to Combined Synopsis/Solicitation
Safety Shower and Eyewash Corrections Phase 1
- 4Version 4Combined Synopsis/SolicitationArchived
Safety Shower and Eyewash Corrections Phase 1
- 5Version 5Combined Synopsis/SolicitationArchived
Safety Shower and Eyewash Corrections Phase 1
- 6Version 6Combined Synopsis/SolicitationArchived
Safety Shower and Eyewash Corrections Phase 1
- 7Version 7Combined Synopsis/SolicitationArchived
Safety Shower and Eyewash Corrections Phase 1
- 9Version 9Combined Synopsis/SolicitationArchivedCurrent
Safety Shower and Eyewash Corrections Phase 1
- 12Version 12Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Safety Shower and Eyewash Corrections Phase 1
Similar Opportunities
Additional Details
Solicitation Number
1333ND26RNB190015
Archive Date
Aug 21, 2026
Office Address
GAITHERSBURG, MD, 20899