C--Design/Build AOEC Relocation Shipping and Receiving Facility, OST

Awarded on August 27, 2024. Full description on SAM.gov.

Awarded tounder 89233124CNA000378 (source: SAM.gov award notice)• $1.6M

Overview

Posted
August 27, 2024
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Energy

Notice details

Last updated
Sep 9, 2025
Award date
Aug 27, 2024
Award amount (SAM.gov award notice)
$1.6M

Identifiers

Solicitation number
89233124RNA000223
Notice ID
2cbac85f163a4d68977904be2002dc52
Award number (PIID)
89233124CNA000378

Description

Design-Build construction of a shipping and receiving facility at the Agent Operations Eastern Command Headquarters in Oak Ridge, Tennessee

Full description on SAM.gov

Award Overview

Award Number

89233124CNA000378

Award Amount (SAM.gov award notice)

$1.6M

Award Date

Aug 27, 2024

Awardee

Awardee UEI

EGKHPDKJ2411

Original Solicitation

Notice ID: 2cbac85f163a4d68977904be2002dc52

Posted Date: Aug 27, 2024

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

3

Contacts

Documents

No documents available.

Lifecycle

Solicitation:89233124RNA000223
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentAug 27, 2024

    C--Design/Build AOEC Relocation Shipping and Receiving Facility, OST

    Notice 2cbac85f163a4d68977904be2002dc52 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
TYAD DESIGN BID BUILD CONSTRUCTION PROJECTPROJECT TITLE: LARGE ASSET INTEGRATION FACILITY PROJECT LOCATION: TYAD DESIGN BID BUILD IN ORDER TO CONSTRUCT A COMPLETE AND USABLE LARGE ASSET INTEGRATION FACILITY IN ACCORDANCE WITH THE STATEMENT OF WORK. PERIOD OF PERFORMANCE IS EXPECTED TO BE 457. THIS SOLICITATION IS 100% SET ASIDE FOR SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES WITH NAICS CODE 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. THE SOLICITATION IS EXTENDED TO 08 SEPTEMBER 2026 AT 3PM EDT.
63%
Solicitation09/08/2026
The U.S. Army Corps of Engineers (USACE) is issuing this solicitation for the design and construction of PN 110205 using Progressive Design-Build under 10 USC 2808a Other Transaction for Construction. See attachments for additional information. ***AMENDMENT 0004 PROVIDES REVISED Draft_PDB-OTA Agreement Articles TO UPDATE DPAS RATING AND PROGRAM LANGUAGE***
56%
Solicitation11/11/2026
This is a Pre-solicitation Notice (Synopsis) and is for informational purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. The Army Corps of Engineers, Philadelphia District, intends to issue a Request for Proposal (RFP) for one (1) Firm Fixed Price Contract Design build construction for the Large Asset Integration Facility project. Total Set Aside 100% for Small Business NAICS 236220 Commercial and Institutional Building Construction. SMALL BUSINESS SIZE STANDARD: $45 MILLION. PSC Code is C1EA - ARCHITECT AND ENGINEERING-CONSTRUCITON: AMMUNITIION FACILIITIES. This requirement is for the design and construction of a new Large Asset Integration Facility at Tobyhanna Army Depot, PA. Key features include floor flush with the adjacent ground level, large overhead doors, and an unobstructed clear open area. The contractor will be responsible for providing all necessary facilities and utilities, including electrical, lighting, heating, ventilation, water, sewer, gas, drainage, pavement, and information systems. The facility must be designed for a minimum life of 40 years in accordance with DoD Unified Facilities Criteria (UFC 1-200-02). Construction range is $5,000,000 to $10,000,000.
54%
Pre-Solicitation07/07/2026
SPECIAL NOTICE The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for a design and construction solicitation for the US Space Force Integration Facility, F/10852 using Progressive Design-Build under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY USACE intends to conduct an Industry Day on 03 December 2026 at 0900 Eastern Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed PDB under an OT (non-FAR-based) framework. A notional acquisition schedule will be shared. Interested parties are encouraged to ask questions and provide input. General questions will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ. Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. II. LOCATION Industry Day Presentation location: Hope Hotel, 10823 Chidlaw Rd # A, Dayton, OH 45433 III. PROJECT OVERVIEW Project Title: US Space Force Integration Facility, F/10852 Location: Wright-Patterson Air Force Base (WPAFB), OH NAICS Code: 236220 Total Program Funding: $394,000,000.00 IV. PROJECT DESCRIPTION The USSF Integration Facility is a newly programmed mission at Wright-Patterson Air Force WPAFB, Ohio. It serves as a highly classified and secured contiguous operations area to enable Director for National Intelligence (DNI) and United States Space Force (USSF) directed and endorsed missions in areas of the highest national security, housing intelligence analysis and production for new and expanded all-source means that enable near-real-time capabilities. The facility supports the intelligence needs of the Defense Intelligence Enterprise, USSF, joint warfighters, policymakers, and acquisition professionals, driving intelligence, surveillance, and reconnaissance (ISR) for space domain operations including detection, characterization, and targeting of adversary space capabilities. The adjacent existing facility, Building F/10854, will remain fully occupied and uninterrupted, maintaining 24/7 business operations and ICD 705 security accreditation throughout construction, requiring strict utility, access, physical security, and logistical phasing constraints. Construction is broken into distinct agreement phases under the Progressive Design-Build (PDB) framework. Phase 1 (Design & Pre-Construction): This Phase is structured to collaboratively advance the facility design from initial concepts to 65% design maturity, perform detailed constructability reviews, conduct transparent open-book cost estimating, identify and mitigate complex interface risks, and validate the overall space programming. Pre-construction services will establish a baseline cost and allow for early design and potential separate authorization of long-lead procurement items. Phase 2 (Final Design and Construction): This Phase will include the completion of final design documents (95% and 100% Certified Final), fast-tracking capabilities, and all physical construction activities, including structural, interior finishes, specialized secure Sensitive Compartmented Information Facility (SCIF) fit-out, redundant systems commissioning, and final security accreditation. Phase 2 will also include comprehensive site work, utility distribution integration, and connection into the active Building F/10854. Phase 2 covers construction of the multi-floor, approximately 333,700 SF secure USSF Integration Facility, including the physical connection to active Building F/10854, the integration of high-efficiency HVAC networks, a backup generator facility, high-security electrical switchgear, and the buildout of specialized SCIF and SAP compartments. The Government will use available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate the baseline and may recommend refinements; any material deviation from the Government’s baseline will require Government review and approval. The scope generally encompasses the following critical lines of effort: Critical Infrastructure and Utilities: Installation of high-efficiency mechanical, electrical, plumbing (MEP), heating, ventilation, and air conditioning (HVAC) systems designed for 24/7 continuous operation, electrical tie-ins to centralized utilities, backup generator integration (7,500 KW), Lightning Protection Systems (LPS), and addressable fire protection networks. Secure Facilities: Turnkey design, construction, and Defense Intelligence Agency (DIA) accreditation of highly classified Special Access Program (SAP) SCIF spaces built to stringent ICD 705, IC Tech Spec, and Telecommunictaions Electronics Material Protected from Emanating Spurious Tranmission (TEMPEST) shielding standards to ensure complete physical, visual, and acoustic isolation. New Construction, Envelope, and Physical Connection: Construction of a new structural frame with metal panels and pre-cast exterior walls, establishing a secure thermal wall envelope, executing the physical and utility connection to adjacent operational Building F/10854, and conducting all associated site work, paving, and access control infrastructure. V. ACQUISITION STRATEGY - PRE-AWARD The USACE will use a streamlined competitive selection process: Step 1 –RFQ: Interested parties will submit a Statement of Qualifications (SOQ). Following evaluation of the qualification packages, the Government intends to short-list a target of three (3) of the highest qualified Design-Builders to proceed to Step 2. Step 2 – Pitches: Selected Companies will participate in pitch presentations. One company will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award. Step 3 – Exclusive Negotiation: Based on pitch evaluations, the Government will select one Design-Builder to enter exclusive negotiations. VI. ACQUSITION STRATEGY – AWARD The agreement will be awarded to the most qualified Progressive Design-Build Entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes Design and Pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds are available. VII. VIRTUAL PARTICIPATION OPPORTUNITY: For those who are unable to attend the Industry Day event in person, the Louisville District will also make the event available via Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams Meeting Join: https://dod.teams.microsoft.us/meet/993610255621?p=yaQ28DL3lmCC9Nap5C Meeting ID: 993 610 255 621 Passcode: Y6sB764r VIII. KEY SECURITY REQUIREMENTS This project will require the selected contractor and its subcontractor(s) to process, store, or transmit CUI and Federal Contract Information (FCI). In accordance with the CMMC program (32 CFR part 170) and USACE policy (including Alert 26-HQ-010, Rev1), CMMC Level 2 (Self) will be a mandatory prerequisite prior to award. Offerors must have an active SAM registration and a current, verified BASIC confidence level assessment (or higher) posted in the Supplier Performance Risk System (SPRS) in accordance with NIST SP 800-171. NOTE: An offeror will not be eligible for award if they do not possess the required CMMC status posted in SPRS prior to award. IX. CLOSING STATEMENT All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal solicitation. NOTE: This will be a combined Industry for both the US Space Force Integration Facility (USSF) and the Air Force Material Command (AFMC) Headquarters Renovation projects, both located at Wright Patterson Air Force Base, Ohio.
49%
Special Notice11/30/2026
* Government released Amendment 01 on 29 October 2026 for Challenge Statement with updates throughout. Additional document titled "RFI to Industry" is also attached for Contractor review and response. * "RFI to Industry" document is due back to the Government no later than end of day on Friday, 13 November 2026. Responses are to be submitted through the GoColosseum Marketplace as a submission to this Challenge, not via email." AFCEC and USSPACECOM require a qualified Design-Build Contractor (DBC) to provide architectural, engineering, secure facility design, civil/structural construction, FF&E, electronic security, construction site and surveillance system, integration of C4IT infrastructure delivery, and integrated commissioning for the ~800,000 GSF USSPACECOM C2F weapon system at Redstone Arsenal, AL. The design and construction will result in a state-of-the-art facility that meets or exceeds the Operational Framework and considers potential future needs and uses of the facility. Please see link below on ONI Marketplace for additional details and submission regarding this Challenge. https://marketplace.gocolosseum.org/public/challenges/c3df0d41-753d-4399-a6e3-12b580d1bfa2
46%
Special Notice10/15/2026

Additional Details

Solicitation Number

89233124RNA000223

Archive Date

Sep 11, 2024

Office Address

ALBUQUERQUE, NM, 87185