GovChime
Notice ID: a65a31a00a7645edad1da8165593ee55Award NoticeAwardedArchived

Z--WAPA DSW Southeast Wing Reconfiguration

Awarded on April 17, 2026. Full description on SAM.gov.

Awarded tounder 89503126CWA000142 (source: SAM.gov award notice)• $83.7K

Overview

Posted
April 17, 2026
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Energy

Notice details

Office
WESTERN-DESERT SOUTHWEST REGION
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov
Award date
Apr 17, 2026
Award amount (SAM.gov award notice)
$83.7K

Identifiers

Solicitation number
89503126QWA000395
Notice ID
a65a31a00a7645edad1da8165593ee55
Award number (PIID)
89503126CWA000142

Description

Southeast Wing Reconfiguration - Office Renovation, Desert Southwest Region

Full description on SAM.gov

Award Overview

Award Number

89503126CWA000142

Award Amount (SAM.gov award notice)

$83.7K

Award Date

Apr 17, 2026

Awardee

Awardee UEI

XG4NWKNM82B4

Awardee CAGE Code

86YU3

Awardee Address

3225 N Central Ave, #120, Phoenix, AZ 85012, UNITED STATES

Original Solicitation

Notice ID: a65a31a00a7645edad1da8165593ee55

Posted Date: Apr 17, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Villareal, Jermaine R.

Documents

Lifecycle

  1. 3
    Version 3SolicitationArchived

    Z--DSW Southeast Wing Reconfiguration

    Notice 38e295d6905a4ec394abb99afdb13ca7 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z--WAPA DSW Southeast Wing Reconfiguration

    Notice a65a31a00a7645edad1da8165593ee55 on SAM.gov

Other notices for this solicitation

  1. SolicitationRelated noticeMar 26, 2026

    DSW Southeast Wing Reconfiguration

    Notice 18792285c1454f24a0c4c5eed7c26046 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
****Solicitation W912P626QA004 - Fish Barrier Admin Wing and Bathroom Remodel is hereby amended to update the PWS. Bathrooms 1 and 2 had now accurately lists that: Wall tiles are 12X24 from the floor, installed horizontally, to 60 inches off the floor with 3X8 border tiles around the top. The original PWS had incorrectly listed them as going to 48 inches instead of the correct 60 inches. No other changes to the solicitation. Additionally, responses to inquiries attached.****Under this notice, the United States Army Corps of Engineers - Chicago District is issuing a Request for Quotation (RFQ) to remodel/upgrade the admin wing and bathrooms at the fish barrier: paint walls, install floor and wall tile, install toilet partitions, and install a vanity..****GOVERNMENT REQUIREMENTS: In this acquisition The Government is seeking vendors interested in remodeling/upgrading the admin wing and bathrooms at the fish barrier: paint walls, install floor and wall tile, install toilet partitions, and install a vanity. In order to submit a quote, your firm must register with sam.gov, as a pre-requirement to do business with the federal government and prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE)system. Your firm must register with PIEE in order to access the solicitation and must submit quote responses in PIEE. Use the PIEE System Registration link:- https://piee.eb.mil, and follow the instructions on their website. Contact the PIEE helpdesk if you have any issues.****The only authorized transmission method for quote responses to this request for quote is electronically via PIEE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. For any questions, please contact Sara King and James Parizek, via email at Sara.T.King@usace.army.mil and James.P.Parizek@usace.army.mil and include in the subject line the solicitation number W912P626QA004. All questions must be submitted prior to Dec 15, 2025. This announcement constitutes the only solicitation, and the Government will not reimburse any quoters for their submission.****DUE DATE AND TIME: The Contractor submittal packages must be received by the USACE- Chicago District Office no later than 1:00 PM (Central Time) on Dec 22, 2025. Please reference the subject solicitation number on all correspondence. Detailed submittal requirements are contained in the Solicitation document. Estimated Award Date - January 2026. This is a combined synopsis/solicitation for commercial products or commercial services.****NOTICE TO POTENTIALBIDDERS/OFFERORS: In accordance with DFARS 204.7302, Contractors and subcontractors are required to provide adequate security on all covered contractor information systems. Contractors are required to implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 by inclusion of clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber incident Reporting, are required at time of award to have at least a Basic NIST SP 800-171 DoD Assessment that is current (i.e., not more than 3 years old unless a lesser time is specified in the solicitation).SPRS provides storage and access to the NIST SP800-171 assessment scoring information. To access the NIST SP 800-171 Assessments module, users must be registered in the Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ and be approved for access to Supplier Performance Risk System (SPRS).The NIST SP 800-171 DoD Assessment Methodology is located at: https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171NIST SP 800-171Information and Instructions can be located at: https://www.sprs.csd.disa.mil/nistsp.htmIf any issues arise when completing the NIST SP 800-171 Assessment, please contact the SPRS helpdesk at 207-438-1690.
69%
Solicitation12/22/2025
Amendment 2 - New Site Visit# 2 scheduled, updating Questions Close date, updating RFP Close date -New Site Visit# 2 is now scheduled for Wednesday, November 18, 2026 at 8:30 am CST. Please meet up at the Fermilab Badge Office and then the site visit at Wilson Hall. Everyone is required to meet up at the Fermilab Badge Office for the pre-brief of the project. Follow the instructions in Exhibit O to apply for access to the site. Please email the Procurement Specialist at ginakern@fnal.gov with the information listed in the RFP regarding the Site Visit prior to attending. This includes if you already have site access. Please arrive at least 5-10 minutes early as the Site Visit will start on time. -New Questions Close Date is now November 24, 2026 at 5:00 pm CST. All questions must be submitted in writing only. Send all questions, referencing the RFP# in the subject line to ginakern@fnal.gov. -New Closing Date for the Request for Proposal (RFP) is now December 9, 2026 at 3:00 pm CST. Please submit your proposal with all required documents to ginakern@fnal.gov. ************************************************************************************************************************* Fermilab has a new requirement for Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade located at Batavia, IL. Site visit is scheduled for November 4, 2026 at 8:30 am CST. Request for Proposal Closes on November 17, 2026 at 3:00 pm CST.
61%
Solicitation12/09/2026
Disclaimer: This notice is for informational purposes only. This is not a request for proposal or quote. It does not constitute a solicitation and shall not be construed as a commitment by the government or a guarantee that one will be issued in the future. Responses in any form are not offers and the government is under no obligation to award a contract as a result of this announcement. No funds are available to pay for preparation of responses to this announcement. Any information submitted by respondents is strictly voluntary. The Department of Justice (Department or DOJ), Security and Emergency Planning Staff (SEPS) is issuing this Request for Information (RFI) to seek information regarding industry capabilities to provide modernization and enhancements to a 24/7 crisis management and communications center. Vendors should provide details on enhancing capabilities into a modern state-of-the-art facility suitable for executive level staff and their guests and increasing situational awareness capabilities. Vendors should also provide details on services they can provide for 24/7 operational centers. The DOJ is reviewing the marketplace to proactively examine all available options to ensure that the Department’s technology investments deliver maximum value, flexibility, and innovation today, and into the future. Project Name: Justice Command Center Phase II Renovation Background: The Justice Command Center (JCC) is a secure 24-hour facility operating in support of law enforcement and national security programs. The JCC is the primary information gathering and crisis management facility for the Attorney General (AG) and senior Department officials; it is designed to function during routine operations and emergencies. The last renovations to the JCC were in 2006 and consisted of minor cosmetic improvements. The JCC needs major renovations to continue to provide the best service possible to the Departmental leadership. Objectives: The Department of Justice Command Center modernization encompasses the renovation and upgrade of the JCC suite, which currently comprises three (3) conference rooms, one (1) watch floor, two (2) IT server rooms, two (2) restrooms, and one (1) storage room. The renovation shall deliver the following enhancements: upgrades to existing conference rooms to modern standards suitable for executive-level meetings and high-level briefings, modern design elements and finishes, renovation of the watch floor to support advanced situational awareness and real-time operational collaboration, and upgrades to all common areas and support spaces to contemporary standards while maintaining compliance with all security and operational requirements. Upon completion, the renovations shall provide a modern environment that is suitable for executive level staff and supports the JCC’s mission as the primary information gathering and crisis management center for senior Department officials. Miscellaneous Requirements: Security: 1. Contractors must be able to pass National Crime Information Center (NCIC) background check for building access. The JCC is a Sensitive Compartmented Information Facility (SCIF), therefore no devices with Wi-Fi or Bluetooth, photography, and/or recording capabilities are permitted within the JCC. 2. All visitors to the Restricted Area build site will be escorted/monitored by cleared personnel. Availability: The JCC is a 24/7 operation; however, work should be done after normal business hours (1800 – 0600) to limit disruptions to Department leadership. Compliance: 1. Intelligence Community Directive (ICD) 705; 2. ICD 705-1 Technical Specifications; and 3. TEMPEST Countermeasures. Tasks: Room 1: 1. Executive level conference table with DOJ seal engraved in center of the table 2. Enhanced appearance with new drywall, fresh paint, and decor; and 3. New desk to match conference room table with enough space for four (4); and enclaves, one (1) keyboard, one (1) mouse, two (2) monitors, and one (1) KVM; and 4. Unclassified Telephone Security Group (TSG) 6 approved speaker phone 5. Hidden but easily accessible cable raceway; and 6. New executive level furniture to include credenza,, and end tables; and 7. TotalMass MassLoaded Vinyl (MLV) Barrier (sounds dampening material which meets Sound Transmission Class (STC) 50 sound attenuation requirements); and 8. Replace existing carpet with new carpet tiles (unique to AG Conference Room space) Room 2: 1. Modernized appearance with new drywall, fresh paint, and updated decorative lighting (sconces); and 2. Updated Department of Justice and/or Justice Command Center Wall Signage; and 3. Dedicated workspaces (2) which allow for up to four (4) enclaves, one (1) keyboard, one (1) mouse, two (2) monitors, and one (1) KVM; and 4. Additional seating along walls; and 5. New podium (reduced size to accommodate video wall) with three (3) JCON enclaves; and 6. TotalMass MLV Barrier (sounds dampening material which meets STC-50 sound attenuation requirements). Room 3: 1. Executive level conference table for up to six (6) people; and 2. New 60” credenza to accommodate IT equipment and wiring; and 3. One (1) desk with three (3) enclaves; and 4. Executive level chairs; and 5. Enhanced appearance with new drywall and fresh paint; and 6. Match carpet tiles to existing floor in the JCC suite; and 7. New LED lighting and ceiling tiles; and 8. Two 75” 4k LED monitors. Room 4: 1. Collaborative layout desks for the Watch Officers; and 2. Dedicated workspace for the Lead Emergency Actions Specialist and Lead Telecommunication Specialist within the watch floor (Two Leads, Two Watch Officers); and 3. New 24/7 high durability desk chairs (5 chairs total); and 4. Printer Cove with three (3) printers (GFE); and 5. Built-in cabinetry for storage and binders; and 6. Additional desk for shared IT equipment (GFE) (LMR Radio, WashFax, Desktop VTC etc.); and 7. Zoned LED lighting with dimmer switch(s) compatible with watch environment; and 8. Hidden but easily accessible cable raceway; and 9. Dry Erase Magnetic Glass Board for planning; and 10. Privacy Smart Glass window between the Watch Room and the Situation Room 11. Adjustable temperature control for HVAC; and 12. Black 2x2 ceiling tiles; and 13. Remove or lower the existing raised floor for ADA compliance; and 14. New DOJ and/or JCC Signage; and 15. Six (6) Belkin 4:2 Display Port MultiClave Secure KVM. JCC Lobby/Reception Area (Modernized Design and Functionality): 1. Fresh paint; and 2. Additional seating; and 3. Improved LED signage throughout JCC; and 4. New Department of Justice Signage outside SCIF; and 5. New artwork throughout JCC; and 6. Recessed cell phone lockers outside of the SCIF. Modernizing the JCC into a state-of-the-art communications and meeting hub will provide Cabinet-level officials and senior managers with a secure, resilient, and highly adaptable environment for decision-making, collaboration, and organizational coordination. The existing space can be transformed from a primarily operational command function into a multi-functional executive hub capable of supporting high-level meetings, crisis response, strategic communications, and hybrid collaboration. The proposed enhancements will also allow the Watch Officers to have increased situational awareness during rapidly evolving emergency events, therefore creating additional information sharing opportunities with the Department’s senior leadership. Instructions for Submission of Responses: Interested firms who consider themselves qualified to perform the tasks outlined above are invited to submit a response to this RFI. Small Business Firms are encouraged to respond. Please provide a Capability Statement that includes the following: Vendor Background Summary including: Contractor Name/DBA Address and Website UEI Number Cage Code Point of Contact Information (name, email, and phone) Business Size and any Socio-economic Status Number of Years in Business Past Performance Summary including: No more than two (2) contracts worked within the last five (5) years of similar size, scope and complexity as the work indicated above. Indicate whether your firm and staff worked as a prime or subcontractor. Contract Value Period of Performance Brief description of how the referenced contract relates to the work described. Government/Customer Point of Contact for references Modernization Capabilities: Outline your proposed strategy for modernizing the JCC, detailing specific enhancements to transform its aesthetic, architectural design, operational functionality, and spatial organization into a state-of-the-art facility. Questions or Clarifications: Please submit any questions or requests for clarity no later than 24 November 2026 at 5PM EST via email to Jennifer M. Thompson at jennifer.thompson@usdoj.gov. Response Guidelines and Deadline: Portable Document Format (PDF) or Microsoft Word Page limitations are based on one side of 8½ x 11-inch page paper, not less than 12-point font size. Total should not exceed three (3) pages Responses shall be submitted via email. Emails should not exceed 10MB Subject line of the email shall include “RFI JCC Phase II Renovation - (Firm Name)” It is the respondent’s responsibility to verify that the DOJ received and can view the email. Responses are due no later than 11 December 2026 at 5 PM EST via email to the following: jennifer.thompson@usdoj.gov.
59%
Special Notice12/11/2026
DESCRIPTION OF REQUIREMENT This is a new construction requirement for the removal and installation of the entryway carpet and painting of curb at B462 on Offutt AFB, Nebraska. This acquisition is set aside for a small business concern under NAICS 236220. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. All prospective offerors must be registered in the System for Award Management (SAM) at www.sam.gov. Lack of a SAM registration will make an offeror ineligible for award. APPLICABLE LABOR LAWS This solicitation is subject to the Construction Wage Requirements RFO 52.222-6 and the current wage determination, Davis Bacon Act WD #NE-20260059. The most updated wage determination can be found at https://sam.gov/wage-determinations. OFFER DUE DATE AND TIME All offers must be submitted to the Contracting Office by 19 November, 2026, 11:00AM CDT. CONTRACTING OFFICE CONTACT INFORMATION All information regarding this solicitation shall be sent by email to: Contract Specialist – SSgt Javier Contreras Smith, javier.contreras_smith@us.af.mil Contracting Officer – SSgt William Torres, william.torres.10@us.af.mil
59%
Solicitation11/19/2026
***To obtain access to the controlled documents in SAM.gov, complete Attachment 11, Non-Disclosure Agreement and return to the Contracting Officer (Brett Zeigler, brett.zeigler@fletc.dhs.gov) then request access to the controlled documents in SAM.gov*** Amendment 0005: The purpose of this amendment is to provide final responses to questions submitted. Request for Information 04 is provided as an attachment. Proposal due date and time is unchanged; November 18, 2026 11:00 a.m. Eastern Time. Amendment 0004: The purpose of this amendment is to provide responses to questions submitted. Request for Information 03 is provided as an attachment. Request for Information 02 required corrections and is provided with Amendment 0004. Amendment 0003: The purpose of this amendment is to extend the proposal due date (11-18-2026, 11:00 AM ET), set the final date for submitting questions (11-06-2026, 5:00 PM ET), and provide responses to questions submitted. Request for Information 02 is provided as an attachment, updates are highlight yellow. Amendment 0002: The purpose of this amendment is to provide responses to questions submitted, post the site-visit sign-in sheet, provide photos, provide drawings, and update the statement of work and specifcations. Amendment 0001: The purpose of this amendment is to clarify the date of the site visit (October 22, 2026), period of performance, and due date for submitting questions. This Request for Proposal will result in a Single Firm Fixed Price Contract Award for Building 262 Renovation on the Federal Law Enforcement Training Center Glynco, GA. This acquisition is a 100% Small Business Set-Aside, under North American Industry Classification Systems (NAICS) Code 236220, Commercial and Institutional Building Construction. A site visit is scheduled for October 22, 2026, at 9:00am at FLETC Glynco Building 200. Upon arrival, attendees should report to the commercial gate a minimum of 30 minutes prior to the application screening process, then proceed to Building 200. All personnel who are not currently badged will need to complete and return Day Pass applications for all attendees no later than October 20, 2026, at 5:00pm to the attention of Project Manager, Richard Love at richard.love@fletc.dhs.gov. Please coordinate receipt of badge applications and submission with Mr. Love. Complete Attachment 11, Non-Disclosure Agreement and return to the attention of the Contracting Officer. The completed NDA is requierd to obtain access to controlled documents in SAM.
59%
Solicitation11/18/2026

Additional Details

Solicitation Number

89503126QWA000395

Archive Date

May 2, 2026

Office Address

PHOENIX, AZ, 85009