GovChime
Notice ID: 90725771ff914e108fdba12b48ff2eebAward NoticeAwardedArchived

Z--MOTION MONITORING SYSTEM Installation Services

Awarded on September 25, 2025. The description is published on SAM.gov: Full description on SAM.gov.

Awarded tounder 89503225PWA000567 (source: SAM.gov award notice)• $299.5K

Overview

Posted
September 25, 2025
Notice type
Award Notice
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
Department of Energy

Notice details

Office
WESTERN-ROCKY MOUNTAIN REGION
Last updated
Nov 7, 2026
First published
Last updated on SAM.gov
Award date
Sep 25, 2025
Award amount (SAM.gov award notice)
$299.5K

Identifiers

Solicitation number
89503225QWA000688
Notice ID
90725771ff914e108fdba12b48ff2eeb
Award number (PIID)
89503225PWA000567

Description

No description in the SAM.gov data feed for this notice.

Full description on SAM.gov

Award Overview

Award Number

89503225PWA000567

Award Amount (SAM.gov award notice)

$299.5K

Award Date

Sep 25, 2025

Awardee

Awardee UEI

LEGGW1TNMVC9

Awardee CAGE Code

0BRU7

Awardee Address

701 GOLD AVE, Bozeman, MT 59715, UNITED STATES

Original Solicitation

Notice ID: 90725771ff914e108fdba12b48ff2eeb

Posted Date: Sep 25, 2025

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

1
  • 89503222CWA000069
    BARNARD CONSTRUCTION COMPANY, INCORPORATED
    Department of EnergyNAICS 237130
    $2.0MSigned Jul 28, 2026

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    Z--MOTION MONITORING SYSTEM Installation Services

    Notice 90725771ff914e108fdba12b48ff2eeb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The U.S. Army Corps of Engineers (USACE), Chicago District, is conducting market research to identify qualified and interested business concerns capable of performing the proposed CSSC Utility Feed Transformer Replacement project.One purpose of this Sources Sought Notice is to determine the availability of capable small business contractors and assist the Government in developing an appropriate acquisition strategy, including consideration of a small business set-aside. The proposed project consists of turnkey removal and replacement of two existing utility feed transformers at the Chicago Sanitary and Ship Canal (CSSC) Fish Dispersal Barrier facility in Lockport, Illinois. The CSSC Fish Dispersal Barrier facility operates continually to protect the Great Lakes from invasive species. The Contractor will be responsible for furnishing all labor, materials, equipment, supervision, transportation, rigging, and incidental services necessary to safely remove and dispose of the existing transformers and furnish, install, test, and commission two new operational replacement transformers.
59%
Market Research11/05/2026
Login at https://piee.eb.mil and search for 'N4008526R0249' to obtain more details.*
59%
Solicitation09/03/2026
Design-Build MILCON Project P-481 Energy Resilience Phases 3 and 4 at Mountain Range Warfare Training Center (MWTC), Bridgeport, CA.
59%
Solicitation12/04/2025
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
54%
Solicitation12/18/2026
**The solicitation for Project No. WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516 has unfortunately been cancelled. Funding for this effort is not anticipated in early Fiscal Year 2027, and the effort will be resolicited should funding become available at a later date. Please refer to the most recently amended RFP in the attachments section of this notice for more information.** This order proposal request is only available to current MACC-BOA holders. The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems. Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit. Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor. The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP. The due date for the RFIs arising from the site visit is currently set for June 5th, 2026 at 5:00 PM CST. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees. This notice signifies the release of the formal RFP for Project No. WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516. The due date for proposals has been extended to July 27th, 2026 at 5:00 PM CST. Any further extensions granted to the proposal due date will be updated to this posting. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates. In lieu of the physical CD, some additional documents have been added to the attachments section including the Project Docs, Facility Standards, As-Built Info, CAD Drawings, and some additional large files. Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the documents. An accommodation has been made to extend the due date for proposals to July 27th, 2026 at 5:00 PM CST. This is to allow offerors additional time to incorporate the Government responses to the Requests for Information as well as supplemental information from key stakeholder Honeywell into their proposals. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information. All RFI responses have been received and compiled. Please see the attachments for the RFI responses. Utilize these in continuing to formulate your proposals. If RFI responses prompt a need for an extension to the proposal due date, please communicate that to the primary and secondary points of contact, and any extensions granted will be updated to this posting. An amendment to the formal RFP including a revision to Section C - Descriptions/Specifications/Statement of Work has been issued to correct a discrepancy among the solicitation, IFC Drawings, and Statement of Work. The scope of the solicitation and the subsequent order exclusively pertains to the four lift stations enumerated in the Statement of Work, IFC Drawings, and amended solicitation. The due date for proposals remains firm as July 27th, 2026, and all other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information.
52%
Solicitation07/27/2026

Additional Details

Solicitation Number

89503225QWA000688

Archive Date

Oct 10, 2025

Office Address

LOVELAND, CO, 80538