GovChime
Notice ID: c63f6edbe993d751e8ec3fc38511c021Combined Synopsis/Solicitation

SNR HEAVY-EQUIPMENT BOOM INSPECTION TESTING

Archived on July 16, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
June 15, 2019
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541380: Testing Laboratories and Services

Notice details

PSC
H: QUALITY CONTROL, TEST, INSPECTION
Last updated
Dec 6, 2025

Identifiers

Solicitation number
89503319QWA000014
Notice ID
c63f6edbe993d751e8ec3fc38511c021

Description

THIS RFQ IS 100% RESERVED FOR SMALL BUSINESS. Western Area Power Administration, Sierra Nevada Region, Folsom, CA Office has a requirement for Non-Destructive Testing (NDT) and Inspection Services in accordance with the attached Request for Quotation (RFQ) 89503319QWA000014. This notice is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2019-03. A fixed price contract will be awarded using the Lowest Price Technically Acceptable procedures. A firm-fixed price contract will be awarded using FAR Part 13 Simplified Acquisition Procedures. The North American Industrial Code (NAICS) is 541380 and the business size standard is $15 million dollars. Vendors submitting responses must be registered in the www.SAM.gov before an award can be made to them. If vendor(s) are not registered in SAM, they may do so through the SAM website at: www.sam.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:89503319QWA000014
  1. Combined Synopsis
  1. Combined SynopsisCurrentJun 15, 2019

    SNR HEAVY-EQUIPMENT BOOM INSPECTION TESTING

    Notice c63f6edbe993d751e8ec3fc38511c021 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a "REQUEST FOR INFORMATION" only for the proposed work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Responses to this Sources Sought must be received by email no later than the date specified in the response section. The intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service-Disabled Veteran Owned, 8(a), HUBZone, or other Small Businesses interested and capable of performing the proposed work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine whether your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following: Company Name Point of Contact (POC) Name POC phone and email UEI number Business Size based on NAICS 541380 with an industry size standard of $19.0 million Socio-economic category, if applicable (e.g., Service-Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, etc.) Estimation of your subcontracting requirement Intent to submit a quote if an RFQ is published Listing of your relevant past experience for projects that are similar in size and scope to the described requirement and that have occurred in the past 5 years. Include contract numbers, contact name and title, locations, dollar amounts, and work descriptions The proposed action is for a hybrid firm-fixed-priced/time & materials performance-based services purchase order. Refer to the draft Performance Work Statement and Master Requirements List for further details. Responses to this Sources Sought Notice may be accomplished using the MS Forms attachment or via e-mail to WFL.Services@dot.gov which shall include all information requested in (1) through (9) above. Determination by the Government to not compete with this proposed contract action based on responses to this notice is solely within the discretion of the Government. The Government is not obligated to, nor will it, pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. Responses are due no later than December 2, 2026, at 2:00pm PST.
81%
Market Research12/02/2026
Final QUESTIN/ANSWERS Spreadsheet uploaded. _____________________________________________________________________________ QUESTIONS/ANSWERS POSTED. Solicitation extended to 10 Nov 2026, 10am(CT). ______________________________________________________________________________ Amendment 0001 - 1st paragraph page 1, changed quantity of 400 to 100 and 25 to 10. _______________________________________________________________________________ Requirement - Helium Inspection Services. Read all attachments. Please make certain Cage Code is current.
73%
Solicitation11/10/2026
71%
AwardedOpen
Amendment 1 See SF 30, Continuation Pages and attachements.
71%
Solicitation10/27/2026
The Contractor will inspect and test the pressure vessels and boilers at the USACE Newt-Graham Lock and Dam and the Robert S. Kerr Marine Terminal locations as required per statute and/or code. Inspections will be performed in accordance with ASME, NBIC and/or local standards, applicable codes, ordinances, statutes and/or regulations. After inspection, a report will be submitted to include references to applicable violations and list the general condition of the items related to public safety, and USACE (US Army Corps of Engineers) employees. The report will also include current date inspected. Items related to operations, maintenance or performance will not be provided. The necessary preparation of the equipment to be inspected shall be at the sole expense and responsibility of the US Army Corps of Engineers. The Contractor shall be with a government employee at all prepared sites for inspection.
71%
Solicitation03/10/2026

Additional Details

Solicitation Number

89503319QWA000014

Archive Date

Jul 16, 2019