GovChime
Notice ID: 8e691d51a48f44fbb87ad507b6da7624Combined Synopsis/SolicitationArchived

Combined Synopsis/Solicitation for North American Power Grid Frequency Monitoring Network for the Federal Energy Regulatory Commission (FERC)

Archived on July 31, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EDT
Posted
July 8, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
NAICS
541519: Other Computer Related Services
Agency
Department of EnergyFEDERAL ENERGY REGULATORY COMMISSION

Notice details

Office
FEDERAL ENERGY REGULATORY COMM
Place of performance
Washington, 20426
Last updated
Nov 12, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
89603025Q0044_1
Notice ID
8e691d51a48f44fbb87ad507b6da7624

Description

The Office of Electric Reliability (OER) has a need for a real-time, or near real-time application to monitor the dynamic behaviors of the electric system through frequency, voltage, and phase angle measurements, accurately and on a wide-area basis. These measurements can then be used by FERC staff for situational awareness capabilities and the Commissions Strategic Plan metrics related to reliability and to study various power system phenomena. In accordance with agency objectives and Mission Essential Functions, OER has a need to procure a real-time (or near real-time) dynamic, power angle measurement application service to monitor the electric system frequency, voltage, and phase angle measurements, accurately such as may be obtained via reports from FNETs Phasor Measurement Unit data collection on an Interconnection or wide-area basis to meet the agency's needs. The requirement to perform the electric system reliability monitoring function was created in response to recommendations provided in the Final Report on the August 14, 2003 Blackout in the United States and Canada, 20041 and is identified as one of the major areas of responsibilities for the Office of Electric Reliability.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (3)

  • A. FY25 FNET SOW (1).pdf

    184 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • A. FY25 FNET SSJ (1).pdf

    202 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 89603025Q0044_1.pdf

    293 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Combined Synopsis/Solicitation for North American Power Grid Frequency Monitoring Network for the Federal Energy Regulatory Commission (FERC)

    Notice 8e691d51a48f44fbb87ad507b6da7624 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

89603025Q0044_1

Archive Date

Jul 31, 2025