Notice ID: 8e691d51a48f44fbb87ad507b6da7624Combined Synopsis/SolicitationArchived
Combined Synopsis/Solicitation for North American Power Grid Frequency Monitoring Network for the Federal Energy Regulatory Commission (FERC)
Archived on July 31, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EDT
- Posted
- July 8, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- No Set aside used
- NAICS
- 541519: Other Computer Related Services
- Agency
- Department of EnergyFEDERAL ENERGY REGULATORY COMMISSION
Notice details
- Office
- FEDERAL ENERGY REGULATORY COMM
- Place of performance
- Washington, 20426
- Last updated
- Nov 12, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 89603025Q0044_1
- Notice ID
- 8e691d51a48f44fbb87ad507b6da7624
Description
The Office of Electric Reliability (OER) has a need for a real-time, or near real-time application to monitor the dynamic behaviors of the electric system through frequency, voltage, and phase angle measurements, accurately and on a wide-area basis. These measurements can then be used by FERC staff for situational awareness capabilities and the Commissions Strategic Plan metrics related to reliability and to study various power system phenomena. In accordance with agency objectives and Mission Essential Functions, OER has a need to procure a real-time (or near real-time) dynamic, power angle measurement application service to monitor the electric system frequency, voltage, and phase angle measurements, accurately such as may be obtained via reports from FNETs Phasor Measurement Unit data collection on an Interconnection or wide-area basis to meet the agency's needs. The requirement to perform the electric system reliability monitoring function was created in response to recommendations provided in the Final Report on the August 14, 2003 Blackout in the United States and Canada, 20041 and is identified as one of the major areas of responsibilities for the Office of Electric Reliability.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
Combined Synopsis/Solicitation for North American Power Grid Frequency Monitoring Network for the Federal Energy Regulatory Commission (FERC)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
89603025Q0044_1
Archive Date
Jul 31, 2025