GovChime
Notice ID: 73fef0f4f2864ca7bf2ba324a03c79deSpecial NoticeArchived

NASA Wallops Breakwater Project and NASA Wallops Beach Renourishment Project

Archived on March 31, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:59 PM EDT
Posted
March 24, 2026
Notice type
Special Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NORFOLK.W2SD ENDIST NORFOLK
Place of performance
Wallops Island, Virginia
PSC
Y1KF: CONSTRUCTION OF DREDGING FACILITIES
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W9123626SA001
Notice ID
73fef0f4f2864ca7bf2ba324a03c79de

Description

03/24/2026 UPDATE: Final Industry Day Slides, Q&A Session, and Industry Day Attendance added as attachments to this posting.

Please be advised: This single industry day will cover two separate and distinct projects, which will be solicited independently: the NASA Wallops Breakwater Project and the NASA Wallops Beach Renourishment Project.

The U.S. Army Corps of Engineers (USACE), Norfolk District (NAO) is hosting a VIRTUAL Industry Day event on 18 March 2026, from 9:00 a.m. to 11:00 a.m. (Eastern Time) for industry contractors interested in the future NASA Wallops Projects: Breakwater and Beach Renourishment. Pre-registration is required for this VIRTUAL event. To RSVP, please provide your name, company, relation to the industry, and email address by email to Contract Specialists, Caleb Bookout at brian.c.bookout@usace.army.mil and MAJ George Jackson at george.jackson@usace.army.mil by close of business on 16 March 2026. A virtual calendar invite will be sent to registered participants prior to the event. There is no solicitation at this time. The event is neither a marketing opportunity for businesses, nor will it promote upcoming projects.

Project 1: NASA Wallops Breakwater Project Description:

The U.S. Army Corps of Engineers – Norfolk District is seeking eligible firms capable of constructing breakwaters along the beach of Wallops Island. The number of proposed breakwaters for this project will be between two to four and placed approximately 200 feet offshore (from Mean High Water elevation). Each breakwater will be constructed of Type II rip rap for armor stone and VDOT Class III stone for core stone. The weight of material for each breakwater is approximately 10,000 tons. Breakwaters are to be placed on 12-inch-thick marine mattress with geotextile fabric.  Water depths for breakwater placement range between -9.5 ft and -12.0 ft NAVD88.  Each breakwater will be constructed to a crest height of +7 ft NAVD88.  Material for breakwaters may be transported to the project site either by land or sea.  Construction of breakwaters may occur either by land or sea.  Various work restrictions are expected due to active rocket launches within the vicinity of the project site, which will require all construction activities to stop and personnel to vacate the premises for hours to day(s).

USACE, Norfolk District, is anticipating soliciting a stand-alone (C-type) firm fixed price construction contract. In accordance with DFARS 236.204, the estimated construction price range for this project is between $10,000,000 and $25,000,000. NAICS Code 237990, Other Heavy and Civil Engineering Construction, applies to this project. The corresponding PSC code is Y1QA, Construction of Restoration of Real Property. The work will commence first with performance beginning within 30 calendar days of receipt of Notice-to-Proceed (NTP). The construction period of performance will be approximately 325 calendar days from issuance of the NTP.

The purpose of the event is to seek industry input regarding best practices, alternative suggestions, and examples of past success on similar projects for the technical execution of the NASA Wallops Breakwater contract. The event will begin with the USACE-NAO’s presentation of the project’s plans and specifications, and the project site restrictions and limitations. At the conclusion of the presentation, there will be project discussion and question-and-answer period. USACE-NAO encourages participants to input suggestions to be considered for the final design and solicitation.

In support of this Industry Day, draft Drawings and Specifications for the NASA Wallops Breakwater project are included with this posting for the purpose of receiving industry feedback. Please submit questions and suggestions for Discussion to Contract Specialist, Caleb Bookout at brian.c.bookout@usace.army.mil. The draft documents are for information purposes only and shall NOT be construed as the Solicitation. Draft documents are expected to be revised before the issuance of the Solicitation.

The Solicitation for the NASA Wallops Breakwater project is expected to be in Fourth Quarter of FY26. This announcement is not a contract solicitation, request for proposal, promise to issue any future contract, forum to discuss upcoming work, nor commitment to offer work of any kind on the part of the Government. The Government will not assume liability for any costs and travel expenses incurred by an attendee for this event.

Project 2: NASA Wallops Beach Renourishment Project Description:

The U.S. Army Corps of Engineers – Norfolk District is seeking eligible firms capable of performing beach nourishment at Wallops Island, VA. The work will be completed via hopper dredge while using the Unnamed Shoal “A” as the borrow source. More specifically, dredging will be permitted to a maximum depth of seven (7) feet below existing bottom within the borrow area. Existing bottom depths within the borrow source range between -34 ft NAVD88 and -60 ft NAVD88 based upon location. Dredged material generated by the project shall be transported and placed along the beach at Wallops Island. The borrow site will be located approximately eleven (11) miles from the placement site. Replenishment of the beach is estimated to require 1,500,000 to 2,500,000 cubic yards of pay volume and the Contractor shall be paid by cubic yard of material retained on the beach. The Contractor shall be responsible for the following: dredging within the designated area, transporting the dredged material to the beach at Wallops Island, discharging the material by hydraulic pump-off into placement site, grading the beach placement site to required elevations and dimensions, performing pre-placement and post-placement surveys of the dredged area and beach nourishment area, and communicating with maritime users to minimize impacts to vessel traffic, adjacent structures, and other dredging operations.

USACE, Norfolk District, is anticipating soliciting a stand-alone (C-type) firm fixed price construction contract. In accordance with DFARS 236.204, the estimated construction price range for this project is between $25,000,000 and $100,000,000. NAICS Code 237990, Other Heavy and Civil Engineering Construction, applies to this project. The corresponding PSC code is Y1KF, Construction of Dredging Facilities. The work will commence first with performance beginning within 30 calendar days of receipt of Notice-to-Proceed (NTP). The construction period of performance will be approximately 325 calendar days from issuance of the NTP.

The purpose of the event is to seek dredging industry input regarding best practices, alternative suggestions, and examples of past success on similar projects for the technical execution of the NASA Wallops Beach Renourishment contract. The event will present the project’s scope, dredge areas, pumping distances, dredged material placement considerations, and project site restrictions and limitations. At the conclusion of the presentation, there will be project discussion and question-and-answer period. USACE-NAO encourages participants to input suggestions to be considered for the final design and solicitation.

In support of this Industry Day, draft Drawings and Specifications for the NASA Wallops Beach Renourishment project are included with this posting for the purpose of receiving industry feedback. Please submit questions and suggestions for Discussion to Contract Specialist, MAJ George Jackson at george.jackson@usace.army.mil. The draft documents are for information purposes only and shall NOT be construed as the Solicitation. Draft documents are expected to be revised before the issuance of the Solicitation.

The Solicitation for the NASA Wallops Beach Renourishment project is expected to be in Fourth Quarter of FY26. This announcement is not a contract solicitation, request for proposal, promise to issue any future contract, forum to discuss upcoming work, nor commitment to offer work of any kind on the part of the Government. The Government will not assume liability for any costs and travel expenses incurred by an attendee for this event.

POC(s): Caleb Bookout, Contract Specialist, Norfolk District; brian.c.bookout@usace.army.mil

               MAJ George Jackson, Contract Specialist, Norfolk District; george.jackson@usace.army.mil

Alternate POC: Nikki Kirtsey, Contracting Officer, Norfolk District, tiffany.n.kirtsey@usace.army.mil

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (11)

  • NASA Wallops Island Industry Day QA Session.pdf

    206 KBAdded in Special Notice version 3Posted
    Download
  • FINAL_NASA WALLOPS ISLAND USACE INDUSTRY DAY PRESENTATION 3.18.26.pdf

    3.3 MBAdded in Special Notice version 3Posted
    Download
  • Industry Day Attendance - NASA Wallops Breakwater and Beach Renourishment Projects.pdf

    81 KBAdded in Special Notice version 3Posted
    Download
  • 1196_NASA WALLOPS BEACH RENOURISHMENT_PLANS.pdf

    20 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BEACH RENOURISHMENT_SPECS.pdf

    1.4 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BEACH RENOURISHMENT_SPECS_APP A.pdf

    69 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BEACH RENOURISHMENT_SPECS_APP B.pdf

    1.2 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BREAKWATER_PLANS.pdf

    8.3 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BREAKWATER_SPECS.pdf

    1.4 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BREAKWATER_SPECS_APP A.pdf

    69 MBAdded in Special Notice version 1Posted
    Download
  • 1196_NASA WALLOPS BREAKWATER_SPECS_APP B.pdf

    1.2 MBAdded in Special Notice version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Special NoticeArchived

    NASA Wallops Breakwater Project and NASA Wallops Beach Renourishment Project

    Notice 46f9676a36124b2b930d9401e5845dd5 on SAM.gov

  2. 3
    Version 3Special NoticeArchivedCurrent

    NASA Wallops Breakwater Project and NASA Wallops Beach Renourishment Project

    Notice 73fef0f4f2864ca7bf2ba324a03c79de on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeMar 5, 2026

    NASA Wallops Breakwater Project in Wallops Island, Virginia

    Notice 89941edd9a7e43db8fc0daad0d1dc83c on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W9123626SA001

Archive Date

Mar 31, 2026

Office Address