Notice ID: 8cfb1746f31f4ea8aec1330240f87214Sources SoughtArchived
644-26-001 Plumbing Infrastructure Repairs Ext Site D-B - Phoenix, AZ
Archived on March 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM EST
- Posted
- January 15, 2026
- Notice type
- Sources Sought
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- PCAC (36C776)
- Place of performance
- Phoenix, Arizona, 85012
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C77626Q0076
- Notice ID
- 8cfb1746f31f4ea8aec1330240f87214
Description
644-26-001 Plumbing Infrastructure Repairs Ext Site D-B - Phoenix, AZ
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Kathryn Allison
Secondary Contact
Jessica Hicks
Documents
Files (1)
- Download
P02 - SSN - 36C77626Q0076.pdf
159 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
644-26-001 Plumbing Infrastructure Repairs Ext Site D-B - Phoenix, AZ
- 6Version 6PresolicitationArchived
Type changed from Sources Sought to Presolicitation
644-26-001 Plumbing Infrastructure Repairs Ext Site D-B Phoenix, AZ
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product.. | - | Awarded | Open |
Correct FCA Deficiencies Construction - Solicitation The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones. This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning. | - | Solicitation | 09/03/2026 |
SOURCES SOUGHT SYNOPSIS Job Order Contract for Yuma Proving Ground This is a Sources Sought Synopsis (SSS) ONLY. This notice is issued solely for information and planning purposes – it does not constitute a Request for Quotation (RFQ), Invitation for Bid (IFB), or Request for Proposal (RFP) or a promise to issue an RFQ, IFB or RFP in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids or proposals at this time and will not accept unsolicited proposals in response to this sources sought synopsis. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. Not responding to this notice does not preclude participation in any future RFQ, IFB, or RFP, if any is issued. If a solicitation is released, it will be synopsized on the Government wide Point of Entry (GPE). It is the responsibility of potential offerors to monitor the GPE for additional information pertaining to this requirement. The GPE is located at https://sam.gov. The United States (U.S.) Government desires to procure a Job Order Contract (JOC) at Yuma Proving Ground, on a small business set-aside basis, provided 2 or more qualified small businesses respond to this sources sought synopsis with information sufficient to support a set-aside. Be advised that the U.S. Government will not be able to set aside this requirement if two (2) or more small businesses do not respond with information to support the set-aside. We encourage all small businesses, in all socioeconomic categories (including, 8(a) Business Development Program, Small Disadvantage Business, Historically Underutilized Business Zone, Service-Disabled Veteran-Owned, Women-Owned Small Business concerns), to identify their capabilities in meeting the requirement at a fair market price. BACKGROUND: A continuing need is anticipated for a job order contract at Yuma Proving Ground. Attached you will find the draft Statement of Work (SOW). The Government contract for these services was previously performed under contract W91151-21-D-0012. The Period of Performance ended 1 August 2026. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and construction services as defined in this SOW. The NAICS code for the requirement is 236220, Commercial and Institutional Building Construction with a corresponding size standard of $45 million. If your company believes a different NAICS code would better fit this requirement, please tell us your suggested NAICS and why it would better fit this requirement. The Contractor shall provide all supervision, labor, personnel, equipment, materials, and supplies, with the exception of Government Furnished Property (GFP), to perform activities under this Job Order Contract. PURPOSE OF THIS SOURCES SOUGHT: To request information on capabilities of potential offerors to provide the services described herein. Electronic submissions only: Responses are due no later than 13:00pm CDT on 30 November 2026 to facilitate planning and ensure maximum consideration. The email attachments cannot exceed 9 megabytes (MB) due to the Government’s email system restrictions. DO NOT SEND ZIPPED files as the Government’s network will remove all zipped files. Interested businesses should provide a brief capability statement package (limited to no more than 30 pages, single spaced, and 12 font size minimum) demonstrating specific capability in reference to this requirement. The Government prefers that your firm submits its response in Microsoft Word, Adobe Acrobat, or a combination of the two and the document(s) must be searchable. Include: Whether the experience has been as a prime contractor or subcontractor on similar requirements (include the services provided, the number of facilities involved, and any other relevant information you deem applicable). Email the capability package to: Marissa Joyner - Contract Specialist at email: Marissa.joyner.civ@army.mil and Andrew Graham - Contracting Officer at email: Andrew.s.graham6.civ@army.mil The email subject line should include: The Firm’s Name, “Response to the Sources Sought Synopsis for the JOC at Yuma Proving Ground, W5168W-26-R-A022". **Note: the location(s) and corresponding solicitation number that you are responding to must be identified on the subject line. In response to this sources sought, please provide: 1. A company’s profile must include: The name of the firm, point of contact, phone number, email address, number of employees, annual revenue history, CAGE code, and Unique Entity Identifier (UEI). number. Respondents must also indicate small business certification status, for example: Small Business (SB), Small Disadvantaged Business (SDB), 8(a), Economically Disadvantaged Woman Owned SB (EDWOSB), WOSB, HUBZone, or Service Disabled Veteran Owned SB (SDVOSB). 2. Respond to: What fundamental tasks you believe need to be performed to successfully accomplish the job order contract? In essence, what primary tasks should be used for determining minimum capability to provide these services? 3. Whether your firm is interested in competing for this requirement as a prime contractor. If you are subcontracting any of the services out, contemplating a Joint Venture, and/or creating a teaming arrangement, please provide the name of these companies and what work they will be performing, if available. Please provide your company’s specific experience in job order contracts and providing comparable services. Ensure the information is in sufficiently detailed regarding previous experience in managing job order contracts (indicate whether the experience has been as a prime contractor or subcontractor) on similar requirements (include the services provided, the number of facilities involved, and any other relevant information you deem applicable). If applicable, please provide the same experience information from any subcontracts, Joint Venture, and/or teaming partners you may propose with. 4. What percentage of work will be performed by the small business prime contractor and all similarly situated entity subcontractors? Note: In accordance with FAR 52.219-14 Limitations on Subcontracting (Oct 2022) and Class Deviation 2021-O0008, Revision 1 - Limitations on Subcontracting for Small Business (Feb 2023), for general construction under NAICS 236220, prime contractor and similarly situated subcontractors must perform at least 15% of the cost of the contract, excluding the cost of materials. 5. Type(s)/certifications(s) of proposed subcontractors (for example, SDB, 8(a), HUBZone, SDVOSB, or WOSB). 6. Information on the financial capacity of your business to meet financial obligations (i.e. payroll, payment of subcontractors, etc.). 7. How the Army can best structure these contract requirements to facilitate competition by and among small business concerns. 8. Identify any condition or action that may have the effect of unnecessarily restricting competition with respect to this acquisition. Please contact the MICC Advocate for Competition, Scott Kukes at email: scott.d.kukes.civ@army.mil or 210-466-3015, if you believe that this action is unreasonably restricting competition. Include the subject of the acquisition, this announcement, and the MICC POC information from the notice on https://sam.gov. Provide the specific aspects that unreasonably restrict competition and the rationale for such conclusion. | - | Market Research | 11/30/2026 |
Amendment A06: 1. The purpose of this solicitation amendment A06 is to post update Drawings. 2. Attached are the updated Drawings, J03b iHouse Apt 02 Phase 4 IFC Drawings R2. 3. All other terms and conditions remain unchanged. Amendment A05: 1. The purpose of this solicitation amendment A05 is to (1) Post the remaining questions and answers (Q&As), (2) Post the iHouse Apt 02 Phase 4 Drawings, (3) post S124 iHouse. and (4) extend the offers due date. 2. Attached are the answers to the remaining questions received, iHouse Apt 02 Phase 4 Drawings, and S124 iHouse 3. The offers due date is extended to 12/01/2026. 4. All other terms and conditions remain unchanged. Amendment A04: 1. The purpose of this solicitation amendment A04 is to (1) Post the some of the remaining questions and answers (Q&As), (2) Post the final Geotech Report, and (3) extend the offers due date. 2. Attached are the answers to the some of the remaining questions received and attachment J01a GeoTech 10Sep2024. 3. The offers due date is extended to 11/12/2026. 4. The Government may provide updated attachments when the remaining Q&A’s are posted. 5. All other terms and conditions remain unchanged. Amendment A03: 1. The purpose of this solicitation amendment is to extend the offers due date. 2. It is taking longer than expected to respond to the questions received. The offers due date is extended to 10/22/2026. 3. All other terms and conditions remain unchanged. Amendment A02: 1. The purpose of this solicitation amendment is to extend the offers due date. 2. It is taking longer than expected to respond to the questions received. The offers due date is extended to 10/08/2026. 3. All other terms and conditions remain unchanged. Amendment A01: 1. The purpose of this solicitation amendment A01 is to: a. Post questions and answers (Q&As), b. Post the site visit sign-in sheet, c. Post the Geotech Report, d. Update a clause, e. Extend the offers due date. 2. Attached are the questions received to this date with some answers. The Government is researching the rest of the questions and will post those answers soon. 3. Attached is the site visit sign-in sheet. 4. Attached is the Geotech Report. 5. HHSAR clause 352.223-70 Safety and Health is updated to the OCT 2026 version and the full text is provided at the end of this amendment. 6. The offers due date is extended to 09/24/2026. 7. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442. 8. All other terms and conditions remain unchanged. Request for Proposals 75H70126R00026 iHouse Apartment Construction Goal: The objective of this project is to adapt and construct a 19-unit apartment building to a new location while ensuring compliance with all applicable local building codes and regulations. Set-Aside: ISBEE set-aside. Product Service Code: Y1FA Construction Of Family Housing Facilities NAICS Code: 236220, Commercial and Institutional Building Construction with a size standard of $45M Location: Indian Rte 6290, Tonalea, AZ 86044 County: Coconino POP: 365 calendar days Construction Magnitude: Between $5,000,000 and $10,000,000 Contract Type: firm-fixed-priced TERO: TERO not is applicable. | - | Solicitation | 12/01/2026 |
Cove Day School Replacement & Quarters Construction Project | - | Solicitation | 12/03/2026 |
Additional Details
Solicitation Number
36C77626Q0076
Archive Date
Mar 15, 2026
Office Address
INDEPENDENCE, OH, 44131