GovChime
Notice ID: 8ee22ec1e11949ecabf15c852fd6668aSolicitationArchived

Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH

Archived on October 6, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EDT
Posted
September 14, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238320: Painting and Wall Covering Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW ENGLAND.W2SD ENDIST NEW ENGLAND
Place of performance
Hopkinton, New Hampshire
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912WJ26QA162
Notice ID
8ee22ec1e11949ecabf15c852fd6668a

Description

The U.S. Army Corps of Engineers – New England District is issuing a Solicitation Notice for Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH.

THE WORK CONSISTS OF: Contractor shall provide all materials, labor, and equipment necessary to paint the interior walls, ceilings, floors, doors, and door frames of the Hopkinton Lake Project Office, the Hopkinton Dam gatehouse, and the Elm Brook Park Ranger Station in Hopkinton, NH, and the Everett Lake Office in Weare, NH. There is a total of 14 (fourteen) door frames, 3 (three) cased openings, and 9 (nine) man doors to be painted. There is a total of 7 (seven) doors requiring interior trim painting only. In total, there is approximately 8,309 sq. ft. of painted surface.

The magnitude of construction is between $25,000 and $100,000.  For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil).

This procurement is set-aside for small business vendors. The applicable NAICS code is 238320 with a Small Business Size Standard of $19 Million.

ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (4)

  • Amendment W912WJ26QA162-0001.pdf

    3.7 MBAdded in Solicitation version 7Posted
    Download
  • Attachments 26QA162.pdf

    5.7 MBAdded in Solicitation version 2Posted
    Download
  • Solicitation Survey 26QA162.pdf

    407 KBAdded in Solicitation version 2Posted
    Download
  • Solicitation W912WJ26QA162.pdf

    4.4 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH

    Notice a1a5d552433140bbab2dbfc2e1736b5c on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH

    Notice 95732c636fdd4f3e9c692caf0a4324b7 on SAM.gov

  3. 7
    Version 7SolicitationArchivedCurrent

    Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH

    Notice 8ee22ec1e11949ecabf15c852fd6668a on SAM.gov

  4. 9
    Version 9Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH

    Notice 81d4b2a59b734d2c93319c2e23bccf8e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Award Notice - Barkley Dam Spillway Gate Machinery Painting.
69%
AwardedOpen
AMENDMENT 0003 PROVIDES GOVERNMENT ANSWERS FOR ADDITIONAL INDUSTRY QUESTIONS. AMENDMENT 0003 AND Q AND A DOCUMENT UPLOADED. AMENDMENT W912P526BA003002 PROVIDES REVISED DOCUMENTS AS REFERENCED IN THE QUESTIONS FROM INDUSTRY AND ANSWERS FROM GOVERNMENT. AMENDMENT W912P526BA003001 EXTENDS BID DUE DATE TO 3 SEPTEMBER 2026 AT 1:00PM CENTRAL DAYLIGHT TIME. BID OPENING IS SCHEDULED ON 3 SEPTEMBER 2026 AT 1:30PM (SEE SECTION 00 21 13). THIS AMENDMENT PROVIDES THE SITE VISIT SIGN-IN SHEET, AND ANSWERS TO THE BIDDER INQUIRES RECEIVED FROM INDUSTRY. AMENDMENT 0002 WILL BE POSTED NEXT WEEK WITH REVISED DOCUMENTS REFERENCED IN AMENDMENT 0001. THIS SOLICITATION IS FOR A FIRM-FIXED PRICE CONSTRUCTION CONTRACT FOR BARKLEY SPILLWAY GATE MACHINERY PAINTING AT BARKLEY DAM. THIS IS A SDVOSB SET-ASIDE IN ACCORDANCE WITH RFO 19.106-2. THE DOCUMENTS DESCRIBING THIS REQUIREMENT ARE PROVIDED BY ATTACHMENT AND ARE LISTED IN RFO DFARS CLAUSE 252.236-7001 DFARS CD 2026-O00019, CONTAINED HEREIN. CONTRACTORS MUST REGISTER AND COMPLETE THE REPRESENTATION AND CERTIFICATION REQUIREMENTS IN THE SYSTEM FOR AWARD MANAGMENT SAM DATABASE AVAILABLE. PLEASE ENSURE YOUR ANNUAL SAM REGISTRATION IS CURRENT. OFFERORS MUST COMPLY WITH THE REQUIREMENTS OF RFO 52.204-7, AND RFO 52.232-33, AND ANY OTHER REPRESENTATION AND CERTIFICATION REQUIREMENTS IN THIS SOLICITATION THROUGH SAM.NOTE - SAM IS COMPLETELY FREE OF CHARE FOR BOTH REGISTRANTS AND USERS. THE GOVERNMENT WILL NOT REIMBURSE OFFERORS FOR ANY EFFORT EXPENDED IN RESPONDING TO THIS IFB. TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THE PROPOSAL PROCEDURES OR BONDS ARE TO BE SUBMITTED VIA BIDDER INQUIRY IN PROJNET. PLEASE SEE SECTION 00 21 13, PROJNET INSTRUCTIONS OFFERORS QUESTIONS AND COMMENTS FOR FURTHERINSTRUCTIONS.
69%
Solicitation09/03/2026
****Amendment 0001 START**** Solicitation W912QR26QA100 is hereby amended as follows on 28 August 2026: Due to a due Date error and additions to the Scope of Work, the following changes have been made. The deadline to submit a quote has been adjusted to 8 September 2026 at 10:00AM EDT on the 1449. Additions have been made to the Scope of Work concerning Paint color and finish, CLIN 005 signage, the existing coating and coating requirements. *NOTE: The due date for quotes is updated to 08 September 2026 at 10:00AM ET.* *NOTE: All amendments shall be signed and submitted with the quote.* (Amendment 0001 ) *NOTE: ALL contractors must resubmit their quote by the stated deadline in order to be considered* *NOTE: The due date for quotes has been updated. Quotes are now due on 08 September at 10:00 AM ET. ****Amendment 0001 END**** This Request for Quote (RFQ) is for the contractor to preform Fuel Tank Painting and Signage at Nolin River Lake, in accordance with the attached Scope of Work (SOW). The contractors work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to ensure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. The Contractor shall begin work within 14 days of the Notice of Award. All work shall be completed at Nolin River Lake within 60 calendar days from the start of work. One award will be made with this Solicitation. Location: Nolin River Lake 2150 Nolin Dam Road Mammoth Cave, KY 42259This procurement is 100% set-aside for Small Business, NAICS 238320 (Size Determination $19M). Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. One award will be made from this Solicitation. Note: The contract award will be based on Lowest Price to the Government. Quotes are due on 04 September 2026 at 10:00 AM Eastern Time. Local Time shall be considered the LRL HQ and not the project site in reference to block 8 of the solicitation Electronic submittals will be accepted. You must submit your quote through PIEE (directions are attached). Fax, telephones, or mailed submittals will not be accepted. For contractual questions, please contact Kellsie Peacher by e-mail at kellsie.a.peacher@usace.army.mil. **ALERT: All contractors must be registered in the System for Award Management (www.SAM.gov) prior to contractors submission. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer System for Award Management, which indicates All payments by the Government under this contract shall be made by electronic funds transfer (EFT). Those not currently registered can obtain registration by going to the website http://www.SAM.gov. Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier. The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov). PLEASE NOTE: SAM is completely free of charge for both registrants and users.
54%
Solicitation09/08/2026
The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000.The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset.
49%
Solicitation09/10/2026
Painting Armed Forces Recruiting Stations throughout Western New York. Proposals will be evaluated using lowest price, technically acceptable.
47%
Combined Synopsis09/09/2026

Additional Details

Solicitation Number

W912WJ26QA162

Archive Date

Oct 6, 2026

Office Address

CONCORD, MA, 01742-2751