TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Responses closed . Full description on SAM.gov.
Description
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 06 July 2026
Description of update:
Amendment FA813726R00250005 has been officially added to the Attachments/Links section of this solicitation. The primary purpose of this amendment is to clarify, verify, and update the Contract Line Item Number (CLIN) titles.
Accordingly, the proposal submission deadline has been extended to Friday, July 10, 2026. All interested offerors are instructed to thoroughly review the newly uploaded solicitation document and submit updated pricing for both revised CLINs by this deadline
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 23 June 2026
Description of update:
WWYK160073 Repair Fire Riser has been added to the Attachments/Links in reference to the Revised Drawings 06.22.2026; specifically the Sheet SD101 (Keynote #3) and Sheet S101 (Keynote #4) for the overall dimensions and as-built location.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 June 2026
Description of update:
Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 12 June 2026
Description of update:
Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section.
Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 June 2026
Description of update:
The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 03 June 2026
Description of update:
Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (46)
- Download
Solicitation Amendment FA813726R00250005 SF 30.pdf
394 KBAdded in Combined Synopsis/Solicitation version 13Posted - Download
Solicitation Amendment FA813726R00250004 SF 30.pdf
396 KBAdded in Combined Synopsis/Solicitation version 11Posted - Download
Solicitation Amendment FA813726R00250003 SF 30.pdf
387 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Solicitation Amendment FA813726R00250002 SF 30.pdf
387 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf
202 KBAdded in Combined Synopsis/Solicitation version 11Posted - Download
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf
6.1 MBAdded in Combined Synopsis/Solicitation version 12Posted - Download
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf
6.2 MBAdded in Combined Synopsis/Solicitation version 11Posted - Download
Att2_200051_IFC Rev1_Design_Analysis.pdf
11 MBAdded in Combined Synopsis/Solicitation version 11Posted - Download
Pre-Bid RFI Govt Response Att1_Inspection Report - WWYK090044F.pdf
213 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf
21 MBAdded in Combined Synopsis/Solicitation version 8Posted - Download
Solicitation Amendment FA813726R00250001 SF 30.pdf
396 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf
3.4 MBAdded in Combined Synopsis/Solicitation version 10Posted - Download
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf
751 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip
8.7 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Bldg 1 - Electrical.pdf
748 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
B-1MEP.pdf
9.0 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
950213.pdf
58 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
870148.pdf
1.2 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
841018.pdf
11 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
830009.pdf
41 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
770142.pdf
995 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
730072.pdf
1.8 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
710216.pdf
1.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
000_TABLE OF CONTENTS.pdf
70 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
00 70 00.pdf
897 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
00 71 00.pdf
1.5 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
00 72 00.pdf
5.3 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
00 80 00.pdf
8.2 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
00 80 05.pdf
10 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 32 16.00 20.pdf
28 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 33 00.pdf
856 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 33 16.00 10.pdf
86 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 42 00.pdf
10 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 45 00.00 10.pdf
36 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 50 00.pdf
300 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 78 00.pdf
1.4 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
01 78 23.pdf
34 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf
638 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
STATEMENT OF WORK (SOW).pdf
283 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Section L - Instructions to Offerors.pdf
162 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Section M - Evaluation Factors for Award.pdf
186 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
WWYK200051 WAGE Determinations.pdf
241 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Submittal Register.pdf
175 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
WWYK200051 Initial Site Visit Sign In Sheet.pdf
122 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
WWYK200051 Initial Site Visit Location.pdf
55 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
EAL List.xlsx
62 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 2Version 2Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 3Version 3Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 4Version 4Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 5Version 5Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 6Version 6Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 7Version 7Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 8Version 8Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 9Version 9Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 10Version 10Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 11Version 11Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 12Version 12Combined Synopsis/Solicitation
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
- 13Version 13Combined Synopsis/SolicitationCurrent
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
FA813726R0025
Archive Date
Oct 30, 2026
Office Address
TINKER AFB, OK, 73145-9125