New River Gorge National Park and Preserve
Awarded on September 1, 2026. Full description on SAM.gov.
Overview
- Posted
- September 1, 2026
- Notice type
- Award Notice
- Set-aside
- No Set aside used
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 693C73 EASTERN FED LANDS DIVISION
- Place of performance
- West Virginia
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 1, 2026
- Award amount (SAM.gov award notice)
- $5.3M
Identifiers
- Solicitation number
- 693C73-26-C-000019
- Notice ID
- 911e560856054a2c96a7fb3e2f761fdf
- Award number (PIID)
- 693C73-26-C-000019
Description
Schedule A: $5,346,871.83
Award Overview
Award Number
693C73-26-C-000019
Award Amount (SAM.gov award notice)
$5.3M
Award Date
Sep 1, 2026
Awardee
Awardee UEI
M2N5C8LQXMD5
Awardee CAGE Code
5LHZ3
Awardee Address
Glen Ferris, WV 25090, UNITED STATES
Original Solicitation
Notice ID: 911e560856054a2c96a7fb3e2f761fdf
Posted Date: Sep 1, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (15)
- Download
Results of Bid Opening - WV NP NERI 107(3).pdf
193 KBAdded in Solicitation version 6Posted - Download
Amendment 0003 - WV NP NERI 107(3).pdf
306 KBAdded in Solicitation version 5Posted - Download
Amendment 0002 - WV NP NERI 107(3).pdf
119 KBAdded in Solicitation version 4Posted - Download
Amendment 0001 - WV NP NERI 107(3).pdf
328 KBAdded in Solicitation version 3Posted - Download
IFB Solicitation - WV NP NERI 107(3).pdf
8.5 MBAdded in Solicitation version 2Posted - Download
Subcontracting Plan - WV NP NERI 107(3).doc
105 KBAdded in Solicitation version 2Posted - Download
ADV_Bidders Qualifications Form.doc
82 KBAdded in Solicitation version 2Posted - Download
VETS-4212 Form.pdf
747 KBAdded in Solicitation version 2Posted - Download
Plans - WV NP NERI 107(3).pdf
17 MBAdded in Solicitation version 2Posted - Download
WV NP NERI107(3)_GEO_Report_adv.pdf
32 MBAdded in Solicitation version 2Posted - Download
WV NP NERI 107(3)_PVT_Memo_update.pdf
167 KBAdded in Solicitation version 2Posted - Download
WV NP NERI 107(3)_HYD_Memo_adv.pdf
2.3 MBAdded in Solicitation version 2Posted - Download
Categorical Exclusion Form (NEPA).pdf
326 KBAdded in Solicitation version 2Posted - Download
Tabulation of Bids - WV NP NERI 107(3).pdf
823 KBAdded in Award Notice version 2Posted - Download
FP24_Eng.pdf
5.7 MBAdded in Solicitation version 2Posted
Lifecycle
- 1Version 1Solicitation
New River Gorge National Park and Preserve
- 2Version 2Award NoticeCurrent
Type changed from Solicitation to Award Notice
New River Gorge National Park and Preserve
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sealed bids from all business concerns will be accepted for the New River Gorge National Park and Preserve, Project WV NP NERI 107(3), Solicitation Number 693C73-26-B-000016, located in Fayette County, West Virginia. The project consists of the repair of a slide on Cunard River Access Road using an anchored soldier pile wall. The work includes construction of an anchored soldier pile wall, reconstruction of the roadway section with asphalt concrete pavement and aggregate base, guardrail replacement with MGS, drainage improvements, and other miscellaneous work. The project is expected to fall within the price range of $5,000,000 to $10,000,000. Bid documents should be issued on or about June 24, 2026. Bid due date and location will be specified on the SF 1442, Block 13a of the Solicitation. Use Internet address https://www.sam.gov (click on Contract Opportunities, then type “693C73” in the Search Contract Opportunities box and click the search button and all available projects will be listed) to check for the availability of advertisement documents. All documents can be directly downloaded from this website. Solicitation documents will not be mailed. Register to receive email notifications to be automatically notified when a document is added or updated for a specific project. If firms do not register as an interested vendor at this website, there will be no Interested Vendors List. Please send all questions concerning construction projects to eflhd.contracts@dot.gov. Include the solicitation number, project name and number, requesting firm and address, a point of contact and telephone number. Requests for 'faxing' or overnight mailing will not be accepted. IMPORTANT SAM REGISTRATION AND PAYMENT REQUIREMENTS In accordance with Federal Acquisition Regulation (FAR) 52.204-7 (DEVIATION NOV 2025), prospective contractors shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer in response to this solicitation and at the time of award. To register in SAM, go to https://www.sam.gov. Annual contractor representations and certifications must be completed online at https://www.sam.gov. Also, FAR 52.232-33 requires SAM registration for payment. The required annual Form VETS-4212 must also be completed online at http://www.dol.gov/vets/vets4212.htm per FAR 52.222-37. IMPORTANT SUBCONTRACTING PLAN REQUIREMENTS Required from all "other than small business" when the requirement is expected to exceed $900,000 ($2,000,000 for construction) [FAR 19.109]. Contracting Officer, Contracting Officer’s Representative, and Small Business Specialist are responsible for approving a reasonable and realistic plan [FAR 19.206-3] [TAM 1219.201(e)(6)]. Legislated subcontracting goals are 43.02% - Small Businesses (SB), 5% - Small Disadvantaged Businesses (SDB), 5% - Women-Owned Small Business Entities (WOSB), 3% - HUBZone, 5% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB). A copy of each subcontracting plan (or contractor statement that no subcontracts are to be awarded) must be provided to Eastern Federal Lands and approved by the Office of Small Disadvantaged Business Utilization prior to close of negotiations (or award of the IFB) [TAM 1219.705-5 and -6]. PLEASE NOTE For security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to a scheduled bid opening. All visitors must sign in at the main entrance of the Quantum Park facility and wait to be escorted by a Government employee to Eastern Federal Lands Highway Division (EFLHD) in Suite 200. Visitors must then register with the EFLHD Receptionist. A Government employee will collect all bids. Prior to the bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made. Bidders are encouraged to submit bids electronically per the instructions provided in the solicitation. | - | Solicitation | 08/13/2026 |
Schedule A: $764,406.70 Schedule B: $5,652,024.90 Schedule C: $5,959,527.50 | - | Awarded | Open |
Schedule A: $8,285,290.00 Schedule B: $1,334,685.00 Schedule C: $600,670.00 | - | Awarded | Open |
Update 11/03/2026: QA_11.3.2026.pdf posted to Attachments. Invitation for Bids (IFB) for Construction Project, AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements. The IFB, plans, and physical data are posted under Attachments/Links. Note: This project is being advertised as Full and Open with HUBZone preference. The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. | - | Solicitation | 12/01/2026 |
INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000 | - | Solicitation | 11/03/2026 |
Additional Details
Solicitation Number
693C73-26-C-000019
Archive Date
Sep 1, 2029
Office Address
Ashburn, VA, 20147