TARC Building 1 Roof Replacement
Archived on September 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- August 26, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238160: Roofing Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.HQ NGB.HQ NGB DIR OF ACQUISITIONS.W39L USA NG READINESS CENTER
- Place of performance
- Arlington, Virginia, 22204
- PSC
- Z1AA: MAINTENANCE OF OFFICE BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W9133L26QA018
- Notice ID
- 917426dc655a40fbb1a899c72ef39fdf
Description
Update 8/26/2026:
See attached Solicitation Amendment 03 for details. The only change is an update to PoP in section 00 00 00 of the solcitiation. Period of Performance is revised through the Soliciation and SoW to 220 days.
Quote due date not extended - Quotes Due August 31st, 2:00pm EDT.
Note: Amendment 0003, Conformed copy of the solicitation, shows the complete solicitation with all amendment updates.
Update 8/24/2026:
This update includes Solicitation Amendment 02, updated Statement of Work, and responses to RFIs 1-33.
See attached Amendment 0002 for full details. All changes are captured in the "Summary of Changes" on page 2 of the amendment, and are also highlighted in yellow for convenience.
In Summary, the changes are:
1. Period of Performance changed from 180 to 220 days.
2. Gutter references were removed from the solicitation, section 00 00 00, Key Performance Requirements - #4.
3. Add attachments: Attachment #7 – E-51 Lightning and Grounding Plan, and Attachment #8 – E-52 Lightning Protection.
"TARC Roof Repair - RFI Responses 1-33 (20260824)" replaces previously posted RFI responses.
Note: Statement of Work changes are highlighted in yellow for convenience of identifying changes.
Update 8/17/2026:
This update includes responses to all RFIs received, 1-18. "TARC Roof Repair - RFI Responses 1-18 (20260817)" replaces previously posted RFI responses.
Update 8/11/2026:
This update includes posting of Site Visit Attendance Sheet and Pre-Quote Conference Slides, as well as RFI responses 1-12, 14, 17 & 18.
Update 8/5/2026:
See attached Amendment 0001 for full details. All changes are captured in the "Summary of Changes" on page 2 of the amendment, and are also highlighted in yellow for convenience.
Summary of Changes include the following:
1. Update Quote due date to 31 August 2026, 2:00pm EDT
2. Add Project Magnitude: $1M - $3M
3. Change RFQ to RFI (Typographical error on page 6)
PROJECT TITLE: TARC BLD 1- ROOF REPAIR
PROJECT LOCATION: ARLINGTON, VA
THIS IS A COMPLETE TEAR-OFF AND REPLACEMENT PROJECT DESIGNED TO PROVIDE A NEW, WATERTIGHT, AND ENERGY-EFFICIENT ROOF SYSTEM THAT COMPLIES WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES.
THE MAJORITY OF THE WORK WILL CONSIST OF ROOF SYSTEM REMOVAL, DRAIN AND PENETRATION REPLACEMENT, ROOF SYSTEM INSTALLATION, SHEET METAL AND FLASHING INSTALLATION, AND ANCILLARY WORK PER THE SCOPE OF WORK.
THIS ACQUISITION IS CONSIDERED COMMERCIAL CONSTRUCTION AND FAR 12 PROCEDURES WILL BE UTILIZED AS APPLICABLE.
1. RESTRICTED: 100% SMALL BUSINESS SET-ASIDE
2. NAICS 238160 - SIZE STANDARD: $19M
3. SITE VISIT - SEE SECTION 00 21 00 INSTRUCTIONS FOR DETAILS
THIS PROJECT IS BEING SOLICITED IN ACCORDANCE WITH REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO FAR) SUBPART 12.201-2, OTHER PROCEDURES, FOR ACQUISITION OF COMMERCIAL CONSTRUCTION SERVICES IN CONJUNCTION WITH RFO FAR 36.101-1(A), AND DFARS RFO DEVIATIONS 236. AWARD WILL BE MADE TO THE RESPONSIBLE OFFEROR WHOSE QUOTE CONFORMS TO THE SOLICITATION AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING ONLY PRICE AND PRICE RELATED FACTORS. SOLICITATIONS, INFORMATION NOTICES, AND AMENDMENTS FOR THIS SOLICITATION WILL BE POSTED AT HTTPS://SAM.GOV.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (18)
- Download
Amendment 0003 - W9133L26QA018 -Conformed Copy - 20260826.pdf
6.3 MBAdded in Combined Synopsis/Solicitation version 11Posted - Download
Amendment 0003 - W9133L26QA018 - 20260826.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 11Posted - Download
Amendment 0002 - W9133L26QA018 - 20260824.pdf
594 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
TARC Roof Repair - RFI Responses 1-33 (20260824).pdf
136 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
TARC Roof Repair - Pre-Quote Conference - Site Visit Slides 20260810.pdf
490 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
TARC Roof Repair - Site Visit - Attendance Sheet 20260810.pdf
432 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
Amendment 0001 - W9133L26QA018 - 20260805.pdf
1.7 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
TARC Roof Repair - Solicitation - W9133L26QA018 - Final 20260731.pdf
31 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 1 - TARC 1 Roof Plans.pdf
4.8 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 2 - P-10 East Penthouse.pdf
1.9 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 3 - P-11 East Penthouse.pdf
1.7 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 4 - P-25 West Penthouse.pdf
2.1 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 5 - P-26 West Penthouse.pdf
2.0 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 6 - Overall Roof Graphic.jpg
12 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 7 - E-51 Lightning and Grounding Plan.pdf
141 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
Attachment 8 - E-52 Lightning Protection.pdf
155 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
Attachment 9 - 20260824 TARC 1 Roof Replacement - SOW - Rev 1.pdf
161 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
Attachment 10 - Wage Determination VA13.pdf
79 KBAdded in Combined Synopsis/Solicitation version 9Posted
Lifecycle
- 3Version 3Sources SoughtArchived
TARC Building 1 Roof Replacement
- 4Version 4Combined Synopsis/SolicitationArchived
Type changed from Sources Sought to Combined Synopsis/Solicitation
TARC Building 1 Roof Replacement
- 5Version 5Combined Synopsis/SolicitationArchived
TARC Building 1 Roof Replacement
- 6Version 6Combined Synopsis/SolicitationArchived
TARC Building 1 Roof Replacement
- 7Version 7Combined Synopsis/SolicitationArchived
TARC Building 1 Roof Replacement
- 8Version 8Combined Synopsis/SolicitationArchived
TARC Building 1 Roof Replacement
- 9Version 9Combined Synopsis/SolicitationArchived
TARC Building 1 Roof Replacement
- 11Version 11Combined Synopsis/SolicitationArchivedCurrent
TARC Building 1 Roof Replacement
- 14Version 14Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
TARC Building 1 Roof Replacement
Similar Opportunities
Additional Details
Solicitation Number
W9133L26QA018
Archive Date
Sep 15, 2026
Office Address
ARLINGTON, VA, 22204-1382