Notice ID: 92cb753a24824157bbd29dfc3a3126ffSolicitation
Horizontal Construction MATOC
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- September 21, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST MOBILE.W074 ENDIST MOBILE
- Place of performance
- Various locations in the Mobile District AOR in MS, AL, and FL., Alabama, 36602
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W9127826RA088
- Notice ID
- 92cb753a24824157bbd29dfc3a3126ff
Description
The Mobile District COE has a need for one MATOC for a full range of horizontal construction, renovation, repair, and some incidental design task orders for general construction primarily at 12 locations in AL, FL, GA, and MS. This project is a Best Value, two-phase design-build solicitation. A detailed project description and overall project performance requirements for this project will be included in the Request For Proposals (RFP) package. The solicitation criteria relies upon industry standards, where allowable, to afford the offeror a degree of design flexibility while meeting certain specific project requirements. The successful Contractor must design and construct complete and usable facilities, as described in the RFP documents. One solicitation will be issued covering both phases. Proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two, and an amendment will be issued to those selected offerors. Selection of offerors for involvement in Phase Two will be based on technical approach and performance capability. Detailed project design requirements will then be added by amendment to the solicitation at the start of the Phase Two stage of the Request For Proposals. A limited number of firms will be invited to participate in the second phase. Amendment 0001 is posted 21 September 2026.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
SSG Paul M. Adamo
Documents
Links (4)
- PIEE Solicitation Module Link for W9127826RA088piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Solicitation
Horizontal Construction MATOC
- 2Version 2SolicitationCurrent
Horizontal Construction MATOC
Other notices for this solicitation
- Special NoticeRelated noticeJul 23, 2026
Horizontal Construction MATOC
- Special NoticeRelated noticeJul 27, 2026
Horizontal Construction MATOC
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a SOURCES SOUGHT SYNOPSIS and is not a solicitation announcement. The purpose of this Market Research and Sources Sought Notice is to gain knowledge of potential qualified Small Business, HUBZone, 8(a), Service Disabled Veteran owned, and Women owned Small Business firms. Responses to this Sources Sought Synopsis will be used by the government in making appropriate acquisition decisions. The intended work falls under NAICS code 237990, Other Heavy and Civil Engineering Construction. The U.S. Army Corps of Engineers, Mobile District, anticipates a requirement for a firm-fixed-price construction contract to perform structural concrete and gate repairs on the spillway at the Carters Reregulation Dam located in Chatsworth, Georgia. The purpose of this project is to perform concrete rehabilitation and retrofit existing structural elements that have been impacted by concrete expansion due to Alkali-Silica Reactivity (ASR). The scope of work includes, but is not limited to: structural concrete demolition of existing pier stoplog slots; installation of new steel stoplog guides and embedded seal plates; placement of specialized shrinkage-compensating concrete; and recessing of side seal plates. Additional mechanical and structural work includes replacing side and bottom seals on four (4) Tainter gates and replacing seals on eight (8) stop logs. The contractor will be fully responsible for the design, fabrication, and installation of Temporary Dewatering Structures (TDS)/cofferdams and temporary gate support shoring. To maintain operational continuity, construction must be executed sequentially, allowing only one gate bay to be dewatered and out of service at any given time. The estimated magnitude of construction is between $5,000,000 and $10,000,000, with an anticipated performance period of approximately 180 calendar days. Responses are requested with the following information, which shall not exceed a total of eight pages. 1. Offeror name, address, points of contact with telephone numbers and e-mail addresses. 2. Business size/classification to include any designations as Small Business, 8(a), HUBZone, Service Disabled Veteran Owned and Women-Owned Small Businesses shall be indicated on first page of submission. 3. Bonding capability: construction bonding level per single contract and aggregate construction bonding level, both expressed in dollars; along with current available bonding capacity. 4. Description of your capability to perform the specialized work described above, manage subcontractors, secure and comply with environmental permits, and safely execute Dam and hydraulic Steel structures (HSS) construction. Specifically address your capacity and proposed approach to designing, fabricating, and installing Temporary Dewatering Structures (TDS) and tainter gate shoring systems. 5. Past performance and experience on up to three (3) projects of similar scope, complexity, and value completed within the past five (5) years, or at least 50% construction complete. Relevant experience includes: structural concrete demolition, specialized concrete placement (such as shrinkage-compensating concrete under strict curing/testing protocols), stainless steel structural embed/guide fabrication and welding, Tainter gate seal replacement, and work with USACE Hydraulic Steel Structures within the civil works branch. For each project, provide the title, location, general description of the scope, contract value, role (Prime or Subcontractor), and client contact information (name, phone, and email). NO RESPONSES WILL BE ACCEPTED BY FAX OR MAIL. ALL RESPONSES MUST BE E-MAILED to: Jeffrey M. Donaldson at Jeffrey.M.Donaldson@usace.army.mil. Submittals are due no later than 20 October 2026 at 2:00 PM CDT. Telephonic responses will not be honored. This is not a Request for Proposal, only a Request for Information. No award will result from this Sources Sought. This notice does not constitute any commitment by the Government. | - | Market Research | 10/20/2026 |
THIS IS A TOTAL SMALL BUSINESS SETASIDE. THIS PROJECT IS A STAND-ALONE ?C? TYPE, REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION. Construction Order of Magnitude: Between $10,000,000 - $25,000,000 This project requires the Contractor to provide all labor, materials and equipment necessary to prep, prime and paint all metal components of the spillway gates, hoists and associated equipment. Painting includes blasting and painting of each structure, minor structural girder modifications, installing/replacing rubber seals and cathodic protection anodes on each gate, and performing weld repairs in accordance with the specifications. In addition, the contractor will be required to remove and replace the ?new? set of stoplogs seal assemblies prior to the gate painting effort. Finally, the contractor shall light clean and provide a maintenance overcoat paint on both sets of stoplogs ?new? and ?old?. The North American Industry Classification System (NAICS) code for this project is 237990, Other Heavy and Civil Engineering Construction. Note No. 1: All prospective contractors, including subcontractors and suppliers, must be registered in the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil before they will be permitted to download solicitation documents. Contractors must also be registered in the System for Award Management (SAM) at https://sam.gov prior to award of this contract. Solicitation documents, including plans and specifications, will be available only via the PIEE website. No CD-ROMs, paper copies, telephonic, mailed, or fax requests will be accepted. Registration in PIEE should be completed at least one (1) week prior to the anticipated issue date of the solicitation. IMPORTANT: If you are not registered, the U.S. Government is not responsible for notifying you of any changes or amendments to this solicitation. It is the contractor?s responsibility to monitor the PIEE website daily for updates. Plans and specifications will not be provided in printed format. However, the Government reserves the right to issue paper copies if deemed in its best interest. The solicitation will be provided in PDF format and requires Adobe Acrobat Reader, which is available for free at http://www.adobe.com/products/reader. Note No. 2: All bid forms, bid bonds, and other standard documents required for bid submission, including any amendments, must be in electronic format and submitted with the proposal. Note No. 3: Critical path method (network analysis system) is required. Note No. 4: For this job, a small business is defined as having average annual receipts of less than $45,000,000 for the past three or five years. Note No. 5: This solicitation includes bid options which may not be awarded. Note No. 6: Address questions concerning downloading of plans/specifications to the Contract Specialist indicated above. Note No. 7: Site Visit information will be posted with the solicitation. Note No. 8: The Request for Information (RFI) process for bidder inquiries during the advertisement period will be conducted exclusively through the ProjNet internet-based system. Detailed instructions will be provided in the RFP solicitation package, which is available solely through the Procurement Integrated Enterprise Environment (PIEE) website: https://piee.eb.mil. RFIs submitted through other means will not be accepted. The Government will make every effort to respond to all inquiries; however, responses may not be provided for all questions, particularly those submitted within 10 days of the bid opening. | - | Combined Synopsis | 04/23/2026 |
The project entails shoreline improvements along approximately 5 miles of the mainland coast in Hancock County, Mississippi. As authorized, the work includes construction of a 150-foot-wide beach berm designed to improve coastal resilience and mitigate storm-related impacts. The berm will tie into either the elevation of the adjacent sidewalk along the existing seawall or the surrounding ground surface, whichever is lower, and will extend approximately 150 feet seaward from the seawall. To complete the berm construction, an estimated 300,000 cubic yards of sand will be sourced from an upland location, trucked in, and placed along the project area. | - | Solicitation | 03/31/2026 |
THIS IS A TOTAL SMALL BUSINESS SETASIDE. THIS PROJECT IS A STAND-ALONE ?C? TYPE, REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION. Construction Order of Magnitude: Between $10,000,000 - $25,000,000 This project requires the Contractor to provide all labor, materials and equipment necessary to prep, prime and paint all metal components of the spillway gates, hoists and associated equipment. Painting includes blasting and painting of each structure, minor structural girder modifications, installing/replacing rubber seals and cathodic protection anodes on each gate, and performing weld repairs in accordance with the specifications. In addition, the contractor will be required to remove and replace the ?new? set of stoplogs seal assemblies prior to the gate painting effort. Finally, the contractor shall light clean and provide a maintenance overcoat paint on both sets of stoplogs ?new? and ?old?. The North American Industry Classification System (NAICS) code for this project is 237990, Other Heavy and Civil Engineering Construction. Note No. 1: All prospective contractors, including subcontractors and suppliers, must be registered in the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil before they will be permitted to download solicitation documents. Contractors must also be registered in the System for Award Management (SAM) at https://sam.gov prior to award of this contract. Solicitation documents, including plans and specifications, will be available only via the PIEE website. No CD-ROMs, paper copies, telephonic, mailed, or fax requests will be accepted. Registration in PIEE should be completed at least one (1) week prior to the anticipated issue date of the solicitation. IMPORTANT: If you are not registered, the U.S. Government is not responsible for notifying you of any changes or amendments to this solicitation. It is the contractor?s responsibility to monitor the PIEE website daily for updates. Plans and specifications will not be provided in printed format. However, the Government reserves the right to issue paper copies if deemed in its best interest. The solicitation will be provided in PDF format and requires Adobe Acrobat Reader, which is available for free at http://www.adobe.com/products/reader. Note No. 2: All bid forms, bid bonds, and other standard documents required for bid submission, including any amendments, must be in electronic format and submitted with the proposal. Note No. 3: Critical path method (network analysis system) is required. Note No. 4: For this job, a small business is defined as having average annual receipts of less than $45,000,000 for the past three or five years. Note No. 5: This solicitation includes bid options which may not be awarded. Note No. 6: Address questions concerning downloading of plans/specifications to the Contract Specialist indicated above. Note No. 7: Site Visit information will be posted with the solicitation. Note No. 8: The Request for Information (RFI) process for bidder inquiries during the advertisement period will be conducted exclusively through the ProjNet internet-based system. Detailed instructions will be provided in the RFP solicitation package, which is available solely through the Procurement Integrated Enterprise Environment (PIEE) website: https://piee.eb.mil. RFIs submitted through other means will not be accepted. The Government will make every effort to respond to all inquiries; however, responses may not be provided for all questions, particularly those submitted within 10 days of the bid opening. | - | Pre-Solicitation | Open |
This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. | - | Solicitation | 11/20/2026 |
Additional Details
Solicitation Number
W9127826RA088
Archive Date
Sep 21, 2027
Office Address
MOBILE, AL, 36602-3630