Notice ID: 9474da60703a4858a0ee7bcab142b7ffSources Sought

Wilford Hall Ambulatory Care Center, Phase 4 - Site Improvements

Responses closed . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CDT
Posted
March 19, 2026
Notice type
Sources Sought
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTHWESTERN.ENDIST FT WORTH.W076 ENDIST FT WORTH
Place of performance
Lackland AFB, JBSA, San Antonio, Texas, 78236
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W9126G26RA070
Notice ID
9474da60703a4858a0ee7bcab142b7ff

Description

Wilford Hall Ambulatory Care Center, Phase 4 - Site Improvements, Lackland AFB, JBSA, San Antonio, Texas. See attachment for details.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Sources SoughtCurrent

    Wilford Hall Ambulatory Care Center, Phase 4 - Site Improvements

    Notice 9474da60703a4858a0ee7bcab142b7ff on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Bid Abstract Posted 5/12/2026***********************************Request for Information Responses Posted 4/29*********************************************Project Title: Alameda Zone 7 Flood Control Channels PL 84-99 Repairs Phase 2 and Phase 3 Project Location: ALAMEDA COUNTY, CAProject Description: This is an invitation for bids for the Alameda Zone 7 PL 84-99 Repair project is an Operations and Maintenance project to repair storm damage to flood control channels in Alameda County. Damages consisted of erosion and bank failures during a series of atmospheric rivers between December 2022 and March 2023. Work for this project is noted as Alameda Zone 7 Flood Control Channels, PL 84-99 Project, Phase 2 and Phase 3. The magnitude of construction is between $10,000,000-$25,000,000. This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. This Invitation for Bids is a small business set aside. The size standard is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin (logan.champlin@usace.army.mil). Phase 2 of the project consists of a total of 21 repair sites and is the base contract to be worked in 2026. Phase 3 of the project consists of a total of 20 repair sites and is the optional work that, if exercised, will be performed in 2027. The existing flood control channels typically have earthen slopes previously constructed to grades of 2H:1V, with channel heights ranging from 15-30 feet. The damaged sites vary in sizes. Repairs to damaged sites will restore the slopes to original grade prior to the storm damages. A site visit will be conducted on 20 April 2026 at 9:00 AM at 6900 W Las Positas Blvd, Pleasanton, CA 94588. This requirement is a TOTAL SMALL BUSINESS SET ASIDE and will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. ALL BIDS will be due on 11 MAY 2026 at 12:00 PM PDT. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers.b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.c) Offers MUST BE submitted electronically through the PIEE website.d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
76%
Solicitation05/11/2026
This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin (logan.champlin@usace.army.mil). Estimated Cost Range is between $10,000,000-$25,000,000 PROJECT TITLE: Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3) PROJECT LOCATION: ALAMEDA COUNTY, CA PROJECT DESCRIPTION: The Alameda Zone 7 PL 84-99 Repair project is an Operations and Maintenance project proposed by USACE to repair storm damage to flood control channels in Alameda County. Damages consisted of erosion and bank failures during a series of atmospheric rivers between December 2022 and March 2023.Work for this project is noted as ?Zone 7 Flood Control Channel, PL 84-99 Project, Phase 2 and Phase 3.?Phase 2 of the project consists of a total of 21 repair sites including four (4) sites on Arroyo de la Laguna , four (4) sites along Arroyo del Valle, four (4) sites along Alamo Canal, eight (8) sites along Arroyo, and one (1) site along Tassajara Creek. The Government estimates that this work will be completed in the summer of 2026.Phase 3 of the project consists of a total of 20 repair sites including sixteen (16) along South San Ramon Creek, three (3) sites along Alamo Canal, and one (1) site on Alamo Creek. The Government estimates that this work will be completed in the summer of 2027.The existing flood control channels typically have earthen slopes previously constructed to grades of 2H:1V, with channel heights ranging from 15-30 feet. The damaged sites vary in sizes. Repairs to damaged sites will restore the slopes to original grade prior to the storm damages. Earthwork will start with excavation of the damaged area, removing disturbed soil and vegetation within the area. Repairs will consist of placing Rock Slope Protection (RSP) at the waterside slope toe, placing soil-filled RSP up to the 10-year water surface elevation, and restoring the upper portion of the slope with compacted backfill. After the remaining slope is backfilled and compacted above the stone protection, erosion control matting will be installed and hydroseeded. Work is to be completed from land access only to the work/repair areas. This requirement is a TOTAL SMALL BUSINESS SET ASIDE and will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. The solicitation will be available on/about 31 March 2026 for viewing/downloading. ALL BIDS will be due on/about 30 April 2026 at 12:00 PM PDT. The specific date and time will be identified in the solicitation. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
76%
Pre-Solicitation03/30/2026
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
74%
Solicitation10/21/2026
***Amendment 0006 The purpose of this amendment is to incorporate tax exemption language. All other terms and changes remain unchanged. ***Amendment 0005 The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets GI002 and CG203. All other terms and conditions remain unchanged. ***Amendment 0004 This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004. ***Amendment 0003 This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003. ***Amendment 0002 This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026: ***Amendment 0001 This amendment is issued to make administrative updates to the solicitation. ***Proposal will be submitted via EMAIL Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.
74%
Solicitation04/24/2026
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information.
74%
Pre-Solicitation04/24/2026

Additional Details

Solicitation Number

W9126G26RA070

Archive Date

Apr 2, 2027

Office Address

FORT WORTH, TX, 76102-6124